Big Sable Point Lighthouse Shoreline Protection - Addendum No. 1

This is Addendum No. 1 to the bidding and contract documents for the Big Sable Point Lighthouse Shoreline Protection project, issued by GEI Consultants of Michigan, P.C. on behalf of the Michigan Department of Natural Resources. The project is located at Ludington State Park in Mason County, Michigan. Due to changed site conditions and lower water levels in Lake Michigan, the scope of work has been significantly reduced from the original contract documents. The revised project scope involves replacing approximately 400 linear feet of steel sheet pile cap on the existing sheet pile wall at locations specified in the plans, with construction access via a 1.9-mile sandy gravel road through sensitive dune areas requiring minimized traffic, construction mats, and restoration of staging areas. The project bid opening date is June 8, 2022, at 2:00 p.m. Eastern Time, with final completion required within 100 calendar days from the notice to proceed. The contract award deadline is July 19, 2022. Construction is scheduled to commence on October 15, 2022, and be completed by December 15, 2022. The original shoreline armoring and riprap swale work has been deleted from this contract and will be re-evaluated for inclusion in a future separate contract.

The base bid schedule includes two items: Mobilization, Bonds, Insurance, and Permits (lump sum) and Replace Sheet Pile Cap (lump sum). Performance and payment bonds are required for all bids exceeding $50,000, and each bid must be accompanied by a five percent bid guarantee. The contract is subject to prevailing wage requirements, with the Mason County Prevailing Wage Rate Schedule (Issue Date April 20, 2022) included as an attachment. The project is funded by the Michigan Department of Natural Resources and is a state-funded construction project. Provisional and contingency allowances have been deleted from the contract documents, and the contractor is not required to include such allowances in their bid. Bidders must acknowledge receipt of this addendum and certify their compliance with Qualified Disabled Veteran and Michigan-Based Business requirements as part of their bid submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Big Sable Point Lighthouse Shoreline Protection

File No. 751/21078.GAG

ADDENDUM NO. 1

V:\MDTMB\2101486 Big Sable and Little Sable Lighthouse Protection\05_ENG\01_Big Sable\Specifications\Addendum No. 1\2101486 - Big Sable Addendum 1.docx to

GEI CONSULTANTS OF MICHIGAN, P.C.

230 N WASHINGTON SQUARE, SUITE 201

LANSING, MI 48933

DATE: May 26, 2022

BID DATE: June 8, 2022

TO ALL BIDDERS BIDDING ON THE ABOVE PROJECT:

All Bidders submitting a Bid on the above Contract shall carefully read this Addendum and give it consideration in the preparation of their Bid.

Drawings, Specifications and/or Proposals are herein amended, expanded and/or modified, as hereinafter described, and become a part of the Contract Documents with same force and affect as if incorporated, therein, originally. Any contrary provisions contained, or referred to, in Drawings and/or Specifications, shall remain applicable unless overridden by this Addendum. Revised or contrary provisions herein shall not affect any other part of Contract

Documents and any deletions, additions, substitutions and/or revisions mentioned, shall include all labor, materials, methods, modifications, etc. required for complete performance of the work.

I. The following are revisions to the Bidding and Contract Documents:

A. Section DTMB-0401D, BID SUMMARY

1. Due to the change in site conditions and lower water level of Lake Michigan, shoreline armoring and protection involving placement of supplemental armor stone and the rip rap swale will not be included as a part of this project. The site will be re-evaluated to determine if protection measures are needed and if required, work will be included in a separate contract to be advertised and awarded at a date to be determined in the future.

The CONTRACTOR is invited to submit pricing for replacement of the steel sheet pile cap as a base bid in the Contract and as shown on the drawings.

Revise the Project Scope of Work to read as follows:

High water levels in the Great Lakes have damaged the sheet pile cap around the Big Sable Point

Lighthouse. Items of work include replacing approximately 400 linear feet of pile cap on the existing sheet pile wall at the locations shown on the plans.

Overland access to the site is via a 1.9-mile sandy gravel road from the Pines Campground at the end of M-116 though sensitive dune areas to the project site. Overland construction traffic along this route must be minimized. Construction mats across beach areas and restoration of staging areas and haul routes will be required.

2. Modify the Bid Schedule as follows:

• Delete Item “Shoreline Protection, Lsum” from the Bid Schedule

• Delete “Replace Sheet Pile Cap” as a bid alternate and include in the Base Bid Schedule

V:\MDTMB\2101486 Big Sable and Little Sable Lighthouse Protection\05_ENG\01_Big Sable\Specifications\Addendum No. 1\2101486 - Big Sable Addendum 1.docx

Specification Section DTMB-0401D, BID SUMMARY re-issued in its entirety.

B. SECTION 01010 - SUMMARY OF WORK

Revise Paragraph 1.1 to read as follows:

High water levels in the Great Lakes have damaged the sheet pile cap around the Big Sable Point

Lighthouse. Items of work include replacing approximately 400 linear feet of pile cap on the existing sheet pile wall at the locations shown on the plans.

Overland access to the site is via a 1.9-mile sandy gravel road from the Pines Campground at the end of M-

116 though sensitive dune areas to the project site. Overland construction traffic along this route must be minimized. Construction mats across beach areas and restoration of staging areas and haul routes will be required.

C. Insert the Prevailing Wage Rate Schedule as attached in Appendix V – Federal Provisions Addendum &

Wage Rate Schedules

D. Specification Section 01020 – Allowances

Deleted Paragraph 1.2 “Provisional/Contingency Allowances” in its entirety. The CONTRACTOR is not required to include provisional contingency allowances for the project.

E. Specification Section 0125 – MEASUREMENT AND PAYMENT

Delete Paragraph 2.c – Shoreline Protection

F. Drawings

The following drawings are reissued as a part of this addendum:

C0.0 – COVER SHEET

C0.1 – GENERAL NOTES

C1.0 – OVERVIEW, PLAN, AND SESC CONTROLS

C1.3 – SECTION

C2.1 – DETAILS

C2.2 – STRUCTURAL DETAILS

The following drawings have been deleted from the contract by this addendum:

C1.1 – PLAN & PROFILE

C1.2 – PLAN & PROFILE

II. The following clarifications are made regarding the Contract Documents:

A. Appendix II, Special Working Conditions - Department of Natural Resources, Paragraph 7

Replacement of the steel sheet pile cap will commence on October 15, 2022, and be completed by

December 15, 2022, as identified in Paragraph 7.2.

V:\MDTMB\2101486 Big Sable and Little Sable Lighthouse Protection\05_ENG\01_Big Sable\Specifications\Addendum No. 1\2101486 - Big Sable Addendum 1.docx

III. The following attachments are included as a part of this Addendum:

A. Plan Drawings, Revised 05/26/2022

B. Specification Section DTMB-0401D, BID SUMMARY

C. Mason County Prevailing Wage Rate Schedule, Issue Date 4/20/2022 consisting of 28 pages

D. Pre-bid Attendance Sign in Sheet

No other changes are made as part of this addendum.

GEI Consultants of Michigan, P.C., Lansing, MI

Carlin Grundemann, P.E., Senior Project Manager

LUDINGTON STATE PARK

BIG SABLE LIGHTHOUSE PROTECTION

LUDINGTON STATE PARK

5611 N LIGHTHOUSE, LUDINGTON, MI 49431

MASON COUNTY, MICHIGAN

T19N, R18W, SECTION 7

SITE

SITE

SOURCE:

GOOGLE EARTH PRO

STATE MAP

(NOT TO SCALE)

LOCAL MAP

(NOT TO SCALE)

SOURCE:

DRONE SURVEY 2021

SITE AERIAL VIEW

(NOT TO SCALE)

COVER SHEET

C0.0

\\lan-pzcc-1\ \\lan-pzcc-1\LAN-DATA\Projects\MDTMB\2101486 Big Sable and Little Sable Lighthouse Protection\00_CAD\Design\Sheets\BS_Cover Sheet.dwg - 4/21/2022

BIG SABLE LIGHTHOUSE PROTECTION

LUDINGTON STATE PARK

LUDINGTON, MI

MICHIGAN DEPARTMENT OF

NATURAL RESOURCES 3/15/2022Project 2101486

Consultants

NO. DATE ISSUE/REVISION APP

1 10/29/2021 ISSUED FOR PERMIT CFG

2 4/20/2022 ISSUED FOR BID CFG

SHEET INDEX

SHEET NO. DESCRIPTION

C0.0 C0.1 C1.0 C1.1 C1.2 C1.3 C2.1 C2.2

COVER SHEET

GENERAL NOTES

OVERVIEW, PLAN, AND SESC CONTROLS

PLAN & PROFILE

PLAN & PROFILE

SECTION

DETAILS

STRUCTURAL DETAILS

bkladder Architect

- NOT USED

bkladder Architect

- NOT USED

bkladder Architect

REVISED 5/26/2022

GENERAL NOTES

C0.1

\\lan-pzcc-1\ \\lan-pzcc-1\LAN-DATA\Projects\MDTMB\2101486 Big Sable and Little Sable Lighthouse Protection\00_CAD\Design\Sheets\BS_General Notes.dwg - 3/18/2022

BIG SABLE LIGHTHOUSE PROTECTION

LUDINGTON STATE PARK

LUDINGTON, MI

MICHIGAN DEPARTMENT OF

NATURAL RESOURCES 3/15/2022Project 2101486

Consultants

NO. DATE ISSUE/REVISION APP

1 10/29/2021 ISSUED FOR PERMIT CFG

2 4/20/2022 ISSUED FOR BID CFG

GENERAL NOTES:

1. EXCEPT WHERE OTHERWISE INDICATED ON THESE PLANS AND SPECIFICATIONS CONTAINED THEREIN, ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE 2012 MICHIGAN DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR CONSTRUCTION, AND THE MICHIGAN MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. CONTRACTOR

SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL LAWS/STANDARDS/ORDINANCES.

2. ANY EXISTING UTILITIES, PAVEMENT, CURBS, SIDEWALKS, STRUCTURES, TREES, ETC., NOT PLANNED FOR DEMOLITION OR REMOVAL THAT ARE DAMAGED OR REMOVED SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE.

3. THE CONTRACTOR SHALL VERIFY ALL DEPTHS AND LOCATIONS OF EXISTING UTILITIES PRIOR TO ANY CONSTRUCTION. ANY DISCREPANCIES WITH THE CONSTRUCTION PLANS FOUND IN THE FIELD SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE WHO SHALL BE RESPONSIBLE FOR REVISING THE PLANS AS APPROPRIATE. ALL REVISIONS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER AND ENGINEER. PLAN REVISIONS MAY NEED OWNER, ENGINEER, REGULATORY AUTHORITY, CITY, AND/OR TOWNSHIP APPROVAL AS NECESSARY.

4. ALL AREAS DISTURBED OR EXPOSED DURING CONSTRUCTION SHALL BE REVEGETATED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. HOWEVER, THE TYPE OF REVEGETATION MUST EQUAL OR EXCEED THE TYPE OF VEGETATION PRESENT

BEFORE CONSTRUCTION UNLESS OTHERWISE SPECIFIED.

5. PRIOR TO ANY CONSTRUCTION, A PRECONSTRUCTION CONFERENCE SHALL BE HELD BETWEEN, THE OWNER, THE CONTRACTOR, UTILITY COMPANIES, AND ANY OTHER ENTITY THE OWNER MAY REQUIRE.

6. THE CONTRACTOR OR HIS/HER DESIGNATED AGENT SHALL KEEP ACCURATE RECORDS OF ALL CONSTRUCTION THAT DEVIATES FROM THE PLANS. THE CONTRACTOR OR HIS/HER DESIGNATED AGENT SHALL FURNISH THE OWNER ACCURATE "AS-BUILT" DRAWINGS FOLLOWING COMPLETION OF ALL CONSTRUCTION. THESE "AS-BUILT" DRAWINGS SHALL MEET WITH THE SATISFACTION OF THE OWNER PRIOR TO FINAL ACCEPTANCE. FINAL “AS- BUILTS” DRAWINGS SHALL BE DELIVERED TO THE

OWNER IN PAPER FORM AND ON A CD/DVD IN PDF FORMAT.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL TRASH AND DEBRIS. CLEAN-UP SHALL BE TO THE SATISFACTION

OF THE OWNER.

8. TOPOGRAPHICAL SURVEY PERFORMED BY GEI CONSULTANTS, APRIL AND AUGUST 2019.

9. HORIZONTAL DATUM: NAD83 MI STATE PLANE, CENTRAL ZONE, INTERNATIONAL FEET.

10. VERTICAL DATUM: NAVD 88 UNLESS OTHERWISE NOTED.

11. CONTRACTOR OR HIS/HER DESIGNATED AGENT SHALL COMPLY WITH ALL PERMITS FROM THE APPROPRIATE AUTHORITIES, SUCH AS, BUT NOT LIMITED TO, THE CITY OF LUDINGTON, MICHIGAN DEPARTMENT OF ENVIRONMENT, GREAT LAKES AND

ENERGY, MDOT, LARA, COUNTY OF MASON, ETC.

12. ACTUAL FIELD CONDITIONS MAY VARY FROM THOSE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE ACTUAL ABOVE GROUND AND UNDERGROUND CONDITIONS PRIOR TO START OF ALL CONSTRUCTION. ANY DISCREPANCY BETWEEN THE CONTRACT DOCUMENTS AND THE FIELD SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF

THE ENGINEER, FORMALLY.

13. WHERE DISCREPANCIES OCCUR BETWEEN PLANS, DETAILS, AND NOTES, THE MORE STRINGENT REQUIREMENTS SHALL GOVERN. DETAILS ON DRAWINGS TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS.

14. CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING ALL MIOSHA REQUIREMENTS DURING CONSTRUCTION.

15. CONTRACTOR SHALL PROVIDE ENGINEER 72 HOURS NOTICE PRIOR TO BEGINNING ANY WORK AT THE PROJECT SITE.

16. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS REQUIRED FOR CONSTRUCTION OF THIS PROJECT THAT HAVE NOT BEEN

PROVIDED BY THE DTMB. CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF ALL PERMITS FOR THIS PROJECT.

17. CONTRACTOR SHALL USE DESIGNATED STAGING/STORAGE AREAS AS SHOWN ON THE DRAWINGS.

18. BEFORE PERFORMING ANY EXCAVATION ON THE SITE, CONTRACTOR SHALL CONTACT MISS DIG AND THE DTMB IN ACCORDANCE

WITH STATE REQUIREMENTS.

19. CONSTRUCTION ACTIVITIES SHALL NOT BE CONDUCTED OUTSIDE THE DELINEATED PROJECT BOUNDARIES.

20. CONTRACTOR TO PROVIDE ALL SURVEYING DURING CONSTRUCTION TO VERIFY CONFORMANCE WITH CONSTRUCTION

DOCUMENTS.

21. UPON IDENTIFICATION OF ANY ERROR IN CONSTRUCTION, ERRORS AND PROPOSED SOLUTIONS SHALL BE DISCUSSED WITH THE

ENGINEER, PRIOR TO CORRECTING. CONTRACTOR SHALL FIX ERRORS AT NO COST TO THE OWNER.

22. CONTRACTOR TO VERIFY IDENTIFIED BENCH MARKS. NOTIFY ENGINEER IF ELEVATIONS FOUND DIFFER.

23. IF ANY ARTIFACT OR ITEM OF POTENTIAL HISTORIC SIGNIFICANCE IS UNCOVERED DURING CONSTRUCTION, CONTRACTOR SHALL

COMPLY WITH REGULATIONS OF THE STATE HISTORIC PRESERVATION OFFICE (SHPO).

24. ANY IMPORTED SOILS SHALL MEET MDNR STEWARDSHIP REQUIREMENTS.

PROJECT SAFETY NOTES:

1. PROJECT SAFETY SHALL BE IN ACCORDANCE WITH THE LAWS OF THE STATE OF MICHIGAN AND THE MICHIGAN

OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION'S CURRENT REGULATIONS.

2. CONTRACTOR TO PROVIDE A PROCEDURE FOR MAINTAINING SAFE WORK PRACTICES AND SITE CONTROL TO LIMIT EXPOSURE

AND SPREAD OF COVID-19.

CONSTRUCTION NOTES (APPLICABLE TO ALL SHEETS):

1. AT NO TIME SHALL EXCAVATED MATERIAL(S) OR IMPORTED MATERIAL(S) BE STOCKPILED ON VEGETATIVE OR SENSITIVE AREAS. AREAS DAMAGED BY THE CONTRACTOR AS A RESULT OF STOCKPILING EXCAVATED MATERIAL(S) OR IMPORTED MATERIAL(S) SHALL BE REQUIRED TO REPAIR THE PAVED ROADWAY SURFACE AT NO ADDITIONAL COST TO THE OWNER.

2. SAFETY REQUIREMENTS SHALL BE CONFORMED TO AND ALL OPERATIONS SHALL BE CONDUCTED SO AS NOT TO DAMAGE, DESTROY, OR ENDANGER THE INTEGRITY OF LIGHTHOUSE STRUCTURES, PATHWAYS, OR OTHER AREAS OUTSIDE THE INFLUENCE OF CONSTRUCTION. ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE CONDUCTED IN ACCORDANCE

WITH MIOSHA SAFETY RULES AND REGULATIONS.

3. ALL CONSTRUCTION DEBRIS SHALL BE CLEANED UP AT THE END OF EVERY WORKING DAY.

4. ALL EXCAVATIONS AND OTHER WORK AREAS SHALL MEET MIOSHA SAFETY STANDARDS. NO EXCAVATIONS SHALL REMAIN

OPEN WHILE UNATTENDED BY THE CONTRACTOR.

5. CONTRACTOR TO STRIP AND NEATLY STOCKPILE SOILS FOR REUSE DURING SITE RESTORATION ACTIVITIES.

6. CONTRACTOR SHALL PROTECT EXISTING PAVEMENT AND SIDEWALKS INCLUDING THE PINES CAMPGROUND AND UTILIZE

MATS OR OTHER MEANS NECESSARY. THE CONTRACTOR SHALL REPAIR ANY DAMAGE RESULTING FROM CONSTRUCTION.

7. THE CONTRACTOR SHALL CLOSE OFF THE PROJECT SITE WITH GATES, FENCING, OR OTHER MEASURES PRIOR TO

CONSTRUCTION.

SITE CONTACT INFORMATION:

1. ENGINEER: CARLIN GRUNDEMAN, PROJECT MANAGER, GEI CONSULTANTS OF MICHIGAN, P.C. - (517) 803-2837

2. DTMB: JERRY GREGORSKI, PROJECT DIRECTOR - (231) 557-9403

3. MICHIGAN DNR PARK SUPERVISOR: JIM GALLIE (231) 843-2423

REVEGETATION:

1. CONTRACTOR SHALL PROTECT VEGETATION OUTSIDE OF THE PROJECT FOOTPRINT AND AVOID DISTURBANCE TO THE

GREATEST DEGREE POSSIBLE.

2. SHOULD VEGETATED AREAS BE INCIDENTALLY OR UNAVOIDABLY DISTURBED DURING CONSTRUCTION, CONTRACTOR SHALL INSTALL AMERICAN BEACH GRASS (AMMOPHILA BREVILIGULATA) SPACED 12” ON-CENTER.

3. THE BEACH GRASS MUST BE MICHIGAN OR GREAT LAKES GENOTYPE. AMERICAN BEACH GRASS PLANTS ORIGINATING FROM

OUTSIDE THE GREAT LAKES WILL NOT BE ACCEPTED.

4. PLANTS SHALL BE INSTALLED BETWEEN MARCH 15 AND MAY 1, OR BETWEEN SEPTEMBER 30 AND OCTOBER 1, IN THE

CLOSEST PERIOD FOLLOWING DISTURBANCE.

5. PLANT ROOTS SHALL BE PLACED 6-8” BELOW THE GROUND SURFACE, AND SAND SHALL BE BACKFILLED AND HAND TAMPED

TO ELIMINATE AIR GAPS SURROUNDING THE PLANTS

6. NEWLY INSTALLED PLANTS SHALL BE IMMEDIATELY WATERED.

7. THE CONTRACTOR SHALL MONITOR AND MAINTAIN THE REVEGETATED AREAS FOR 2 GROWING SEASONS FOLLOWING INSTALLATION. THE CONTRACTOR WILL BE RESPONSIBLE FOR REPLACING DEAD PLANTS ONE TIME DURING THIS PERIOD.

INVASIVE SPECIES COVERAGE SHALL NOT EXCEED 10% IN THE REVEGETATED AREAS. CONTRACTOR MUSTS REMOVE INVASIVE SPECIES BY HAND PULLING OR SELECTIVE HERBICIDE APPLICATIONS DURING THE 2 YEAR PERIOD. ALL HERBICIDE APPLICATIONS SHALL BE SELECTIVE AND AVOID OFF TARGET DAMAGE TO DESIRABLE VEGETATION AND MUST BE

COMPLETED IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS.

bkladder

BEGIN 300 LF SHEET PILE

WALL CAP REPLACEMENT

(BID ADDENDUM #1)

END 300 LF SHEET PILE

WALL CAP REPLACEMENT

END 100 LF SHEET PILE

WALL CAP REPLACEMENT

2 OF 2BEGIN 100 LF SHEET PILE

WALL CAP REPLACEMENT

PROPOSED 2-FOOT THICK

MDOT HEAVY RIPRAP SWALE

270 CY

BEGIN PROPOSED

RIPRAP SWALE

END PROPOSED

RIPRAP SWALE

SEE SHEET C2.0

FOR DETAILS

PLACE 300 TONS / 200 CYD SUPPLEMENTAL 3-6 TON ARMOR STONE (48"

MAXIMUM SIZE) DELIVERED AND PLACED VIA MARINE TRANSPORT AND

CONSTRUCTION METHOD

EXISTING ARMOR STONE AND CONCRETE DEBRIS

BENEATH PROPOSED SUPPLEMENTAL STONE

EXISTING BIG SABLE

LIGHTHOUSE

10' 10'

EX LOOKOUT TOWER

SF

SF

PROTECT EXISTING

VEGETATION (TYP)

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

PLACE SILT OR SNOW FENCE

AROUND EXISTING VEGETATION FOR

PROTECTION (TYP)

SF

SF

SF

SFSF

SF

SF

SF

LOD

LOD LOD

LODLODLOD

LOD

PROTECT EX. TREE

EX KEEPERS

QUARTERS585

590590

59559

60560

OWNER WILL REMOVE EXISTING

BOARDWALKS AS NECESSARY FOR

CONSTRUCTION - CONTRACTOR

SHALL PROVIDE 30 DAYS NOTICE

PRIOR TO CONSTRUCTION

STAGING AREA

350' SOUTH

SCALE:

40 80

1" = 40'

\\lan-pzcc-1\ \\lan-pzcc-1\LAN-DATA\Projects\MDTMB\2101486 Big Sable and Little Sable Lighthouse Protection\00_CAD\Design\Sheets\BS_Project Layout.dwg - 3/15/2022

BIG SABLE LIGHTHOUSE PROTECTION

LUDINGTON STATE PARK

LUDINGTON, MI

MICHIGAN DEPARTMENT OF

NATURAL RESOURCES 3/15/2022Project 2101486

Consultants

NO. DATE ISSUE/REVISION APP

1 10/29/2021 ISSUED FOR PERMIT CFG

2 4/20/2022 ISSUED FOR BID CFG

SOURCE:

1. Drone Survey-Horz. Datum State Plane NAD88 I.F.

Vert Datum NAVD88

OVERVIEW, PLAN, AND

SESC CONTROLS

C1.0

PLACE SNOW FENCE AS SAFETY

BARRIER TO SITE ACCESS FROM THE

NORTH

PRIOR TO BEGINNING CONSTRUCTION, PLACE

SNOW FENCE AROUND PERIMETER OF SITE.

MAINTAIN FENCE DURING CONSTRUCTION.

REMOVE FENCE AFTER CONSTRUCTION AND

RESTORATION IS COMPLETE

SESC NOTES:

1. SILT AND SNOW FENCE: INSPECT AFTER

RAINFALL & REMOVE ALL SEDIMENT WHEN IT

REACHES 50% OF CAPACITY.

2. CONTRACTOR RESPONSIBLE FOR ALL SESC

MAINTENANCE.

3. CONTRACTOR SHALL PREPARE AND SUBMIT

CONSTRUCTION SEQUENCE AND SESC PLAN

BEFORE CONSTRUCTION BEGINS.

4. CONTRACTOR IS RESPONSIBLE FOR $500 PER

DAY FINE AND ASSESMENT OF ACTUAL DAMAGE

COSTS ARISING FROM FAILURE TO COMPLY

WITH SESC PLAN AND STATE OF MICHIGAN

REGULATIONS.

5. CONTRACTOR SHALL INSTALL ALL SESC

MEASURES PRIOR TO BEGINNING

CONSTRUCTION. ALL TEMPORARY SESC

MEASURES SHALL BE INSPECTED DAILY AND

MAINTAINED BY THE CONTRACTOR.

TEMPORARY SESC MEASURES SHALL REMAIN IN

PLACE UNTIL CONSTRUCTION IS COMPLETE AND

APPROVED FOR REMOVAL BY

OWNER/ENGINEER.

6. CONTRACTOR SHALL SWEEP AND REMOVE

SAND TRACKED OFFSITE AS NECESSARY.

7. CONTRACTOR SHALL UTILIZE EXISTING PARKING

AREA NEAR VAULT TOILETS ON LIGHTHOUSE

ROAD APPROX. 350 FT SOUTH OF LIGHTHOUSE

FOR STAGING.

SITE FEATURES LEGEND:

LIMIT OF DISTURBANCE

SILT FENCE

RESTRICTED &

PROTECTED AREA

LOD

SF

bkladder Rectangle bkladder Rectangle bkladder Rectangle bkladder Rectangle bkladder Rectangle bkladder Rectangle bkladder Architect

DENOTES WORK NOT INLCUDED IN CONTRACT

bkladder

PROPOSED 2-FOOT THICK

MDOT HEAVY RIPRAP

EXISTING BACK OF

STEEL SHEET PILE

PROPOSED SUPPLEMENTAL

3-6 TON ARMOR STONE

(48" MAXIMUM SIZE)

PROPOSED BIG SABLE

LIGHTHOUSE BASELINE

EXISTING ARMOR STONE

BIG SABLE

LIGHTHOUSE

584 58

10'

PROPOSED SWALE

INVERT AND CENTERLINE

10'

EXISTING STEEL

SHEET PILE. REPLACE PILE CAP

(SEE LOCATIONS SHEET C1.0)

PROPOSED SUPPLEMENTAL

3-6 TON ARMOR STONE

1V:2H MAX SLOPE

DEPTH OF SHEET PILE

EMBEDMENT UNKNOWN

EXISTING ARMOR STONE

LAKE MICHIGAN

ELEVATION

581.06' (NAVD88)

9/31/21

PROPOSED 11OZ WOVEN

GEOTEXTILE FABRIC

PROPOSED 2-FOOT THICK MDOT HEAVY RIPRAP SWALE.

5.

10'

RIPRAP SWALE FLOWLINE

5'

TOP OF STONE SHALL BE FINAL PROPOSED GRADE. FILL STONE

VOIDS WITH SAND SPOILS. MATCH EXISTING GROUND. MAINTAIN

POSITIVE DRAINAGE TOWARDS SWALE OUTFALL

EXISTING GROUND AT

BIG SABLE LIGHTHOUSE BASELINE

EXISTING BIG SABLE

LIGHTHOUSE

10'

OHWM 580.50' IGLD85

(580.88' NAVD88)

5' TOTAL

DEPTH

-0+25 0+00

3.

0+25

5.

0+50

7.

0+75

7.

1+00

SCALE:

10 20

1" = 10'

\\lan-pzcc-1\ \\lan-pzcc-1\LAN-DATA\Projects\MDTMB\2101486 Big Sable and Little Sable Lighthouse Protection\00_CAD\Design\Sheets\BS_Section.dwg - 3/15/2022

BIG SABLE LIGHTHOUSE PROTECTION

LUDINGTON STATE PARK

LUDINGTON, MI

MICHIGAN DEPARTMENT OF

NATURAL RESOURCES 3/15/2022Project 2101486

Consultants

NO. DATE ISSUE/REVISION APP

1 10/29/2021 ISSUED FOR PERMIT CFG

2 4/20/2022 ISSUED FOR BID CFG

SOURCE:

1. Drone Survey-Horz. Datum State Plane NAD88 I.F.

Vert Datum NAVD88

SECTION

C1.3

SCALE: 1" = 10' VERT.

HORZ.

bkladder Rectangle bkladder Rectangle bkladder Rectangle bkladder Rectangle bkladder Rectangle bkladder Rectangle bkladder Rectangle bkladder Rectangle bkladder Rectangle bkladder Rectangle bkladder Architect

DENOTES WORK NOT INLCUDED IN CONTRACT

bkladder

10'

10'

EX. CONC.

WALLS/BARRIERS

DEPTH AND EXTENT

OF EX. CONC. BARRIER

WALL UNKNOWN

SAWCUT APPROX. 10' (5' EA

WALL) OF CONC. WALL . CRUSH

AND REPURPOSE AS ARMOR

STONE

PROPOSED RIPRAP

SWALE

EX. BEACH

EX. SHORELINE

EX. CONC. WALLS/BARRIERS

EX. NATURAL

GROUND

10'

DEPTH AND EXTENT OF EX.

CONC. BARRIER WALL

UNKNOWN

2' THICK HEAVY RIPRAP

OVER 11OZ WOVEN

GEOTEXTILE FABRIC

SAWCUT APPROX. 10' (5' EA

WALL) OF CONC. WALL . CRUSH

AND REPURPOSE AS ARMOR

STONE

C2.1

\\lan-pzcc-1\ \\lan-pzcc-1\LAN-DATA\Projects\MDTMB\2101486 Big Sable and Little Sable Lighthouse Protection\00_CAD\Design\Sheets\BS_Details.dwg - 3/15/2022

BIG SABLE LIGHTHOUSE PROTECTION

LUDINGTON STATE PARK

LUDINGTON, MI

MICHIGAN DEPARTMENT OF

NATURAL RESOURCES 3/15/2022Project 2101486

Consultants

NO. DATE ISSUE/REVISION APP

1 10/29/2021 ISSUED FOR PERMIT CFG

2 4/20/2022 ISSUED FOR BID CFG

AS-BUILT FOUNDATION DETAIL

NOTE: EXISTING FOUNDATION IS BASED ON HISTORICAL RECORDS AND IS

INCLUDED FOR REFERENCE ONLY. CONTRACTOR TO FIELD VERIFY

LOCATIONS OF EXISTING STRUCTURE AND PROTECT DURING CONSTRUCTION.

EL=585' - EX. GROUND LEVEL

EL=587' - TOP OF EX. FOUNDATION

RIPRAP SWALE OUTLET - PLAN

NOT TO SCALE

RIPRAP SWALE OUTLET - SECTION

NOT TO SCALE

5" MAX (TYP)

FASTENER - MIN. NO. 10 GAGE WIRE

4 PER POST REQUIRED (TYP)

FILTER FABRIC

COMPACTED BACKFILL

UNDISTURBED GROUND LINE

FILTER FABRIC

18" MIN

(TYP)

2' MIN

6" MIN

6" MIN

FLOW

SILT FENCE DETAIL

SCALE: NTS

DETAILS

SHEET 1 OF 2

bkladder Line bkladder Rectangle bkladder Rectangle bkladder Rectangle bkladder Architect

DENOTES WORK NOT INLCUDED IN CONTRACT

bkladder

C2.2

\\lan-pzcc-1\ \\lan-pzcc-1\LAN-DATA\Projects\MDTMB\2101486 Big Sable and Little Sable Lighthouse Protection\00_CAD\Design\Sheets\BS_Details.dwg - 3/15/2022

BIG SABLE LIGHTHOUSE PROTECTION

LUDINGTON STATE PARK

LUDINGTON, MI

MICHIGAN DEPARTMENT OF

NATURAL RESOURCES 3/15/2022Project 2101486

Consultants

NO. DATE ISSUE/REVISION APP

1 10/29/2021 ISSUED FOR PERMIT CFG

2 4/20/2022 ISSUED FOR BID CFG

1/4"

TYP.

COMPACTED BACKFILL

STRUCTURAL

DETAILS

SHEET 2 OF 2

A C2.2

B C2.2

DRAIN - SECTION B

NOT TO SCALE

CAP PLATE CONNECTION - SECTION A

NOT TO SCALE

WATER SIDE

(ARMOR STONE

NOT SHOWN)

LOCATE CONNECTION

ANGLE OR PLATE EVERY 3RD

CORRUGATION OR LESSWIRE FABRIC, 1/8" S.S.

SHEET PILE WALL - PLAN VIEW

NOT TO SCALE

6" Ø

LAND SIDE

EXISTING STEEL SHEET PILE REPLACEMENT WALL CAP

CAP CHANNEL

EXISTING STEEL SHEET PILE

FIELD LOCATE AND COORDINATE

INVERT ELEVATION WITH ENGINEER

L2X2X1/4"

6" LENGTH

OR 2X1/4X6" ⅊

TYP.

GRADE

CAP CHANNEL

6" Ø

WIRE FABRIC, 1/8" S.S.

INSTALL DRAIN ONLY IN

LOCATIONS SHOWN ON

PLANS

INSTALL DRAIN ONLY IN

LOCATIONS SHOWN ON

PLANS

bkladder

Bidding and Contract Document (R 02/22) Project Name: Big Sable Lighthouse Protection File No. 751/21078.GAG

DTMB-0401D (R 03/21)

ADDENDUM #1

BID SUMMARY

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

3111 W. St. Joseph Street Lansing, Michigan 48917

Bids must be submitted electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService

FILE NUMBER

751/21078.GAG

FUNDING CODE DEPARTMENT/AGENCY

Department of Natural Resources

CONTRACT TIME(S)

Final completion 100 calendar days from the notice to proceed

PROJECT NAME

Ludington State Park – Big Sable Point Lighthouse Protection

LOCATION

Ludington State Park Section 7 T19N, R18W

BID OPENING DATE

June 8, 2022 at 2:00 pm ET

FOR AN EXAMINATION OF THE SITE CONTACT:

Gerald Gregorski, DTMB (231) 557-9043

SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.

BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS IN

CONSIDERATION OF THE BID PRICE (S) STATED BELOW.

FIRM NAME AND COMPLETE ADDRESS

□ Qualified Disabled Veteran

TELEPHONE NUMBER and E-MAIL ADDRESS

SIGMA VENDOR NUMBER

(protected information required for processing payments)

BIDDER'S SIGNATURE AND TITLE DATE WITNESS' SIGNATURE DATE

By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.

BASE BID FROM BID SCHEDULE (Include specified Allowances):

Dollars $

(use words) (in figures)

Alternate1: (Add/Subtract) Dollars $

Alternate 2: (Add/Subtract) Dollars $

Alternate 3: (Add/Subtract) Dollars $

A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE. BUILDERS RISK INSURANCE IS REQUIRED TO BE PROVIDED BY THE

CONTRACTOR UNLESS OTHERWISE INDICATED IN THE BID DOCUMENTS.

BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.

Project Scope of Work:

High water levels in the Great Lakes have damaged the sheet pile cap around the Big Sable Point Lighthouse. Items of work include replacing approximately 400 linear feet of pile cap on the existing sheet pile wall at the locations shown on the plans.

Overland access to the site is via a 1.9 mile sandy gravel road from the Pines Campground at the end of M-116 though sensitive dune areas to the project site. Overland construction traffic along this route must be minimized. Construction mats across beach areas and restoration of staging areas and haul routes will be required.

The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.

Addenda: Bidder acknowledges receipt of Addenda: No. dated: , No. dated: No. dated:

Bidding and Contract Document (R 02/22) Project Name: Big Sable Lighthouse Protection File No. 751/21078.GAG

BID SCHEDULE

Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit Prices and/or Item Bid Prices, as applicable:

Base Bid Item No.

Bid Quantity

Description Unit Price Item Bid Price

1 Lsum Mobilization, Bonds, Insurance, and

Permits

1 Lsum Replace Sheet Pile Cap $ $

TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $

Base Bid (Sum of Item Bid Prices for all Base Bid Items):

Dollars $

Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:

Alternate Item No.

Bid Quantity

Description Unit Price

Item Bid Price

The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.

FIRM NAME TELEPHONE NUMBER and E-MAIL ADDRESS

Bidding and Contract Document (R 02/22) Project Name: Big Sable Lighthouse Protection File No. 751/21078.GAG

Schedule of Unit Prices or Contingent Change Order Prices - The Bidder shall use this “Schedule” to quote unit prices identified in the bid documents or propose other contingent Change Order prices. The proposed Unit Prices or contingent Change Order prices set forth in this schedule, at the sole discretion of the Owner, may, or may not be incorporated into the Contract Documents. The Owner reserves the right to negotiate Unit Prices or contingent Change Order prices set forth herein prior to their possible incorporation into the Contract Documents.

Item No. Bid

Quantity Description Unit

Price Item Bid Price

State of Michigan

Requestor: GEI Consultants

Project Description: Ludington State Park - Big Sable Point Lighthouse Protection

Mason County

Official Request #: 44

Project Number: 751/21078.GAG

Straight Hourly

Time and a Half

Double Time

Contract must be awarded by: 7/19/2022

Issue Date: 4/20/2022

Name

Classification Overtime ProvisionDescription

Official Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Boilermaker

H H H H H H H D$72.47 $107.55 $142.63

BO169

Boilermaker Y

12/13/2021

Apprentice Rates:

1st Period $53.53 $79.15 $104.75

2nd Period $55.14 $81.56 $107.97

3rd Period $56.73 $83.94 $111.15

4th Period $58.31 $86.31 $114.31

5th Period $59.85 $88.62 $117.39

6th Period $63.03 $93.39 $123.75

7th Period $66.17 $98.10 $130.03

8th Period $69.32 $102.83 $136.33

Bricklayer

H H H H H H H D$51.72 $67.29 $82.86

BR2-40-BSP

Brick Masonry, Stone Masonry, Pointing, Caulking and Cleaning Y

2/15/2022

Apprentice Rates:

0-749 hours $39.26 $48.60 $57.94

750-1,499 hours $40.82 $50.94 $61.06

1,500- 2,249 hours $42.38 $53.28 $64.18

2,250-2,999 hours $43.94 $55.62 $67.30

3,000-3,749 hours $45.49 $57.94 $70.40

3,750-4,499 hours $47.05 $60.28 $73.52

4,500-5,249 hours $48.61 $62.62 $76.64

5,250 hours $50.16 $64.95 $79.74

Requestor: GEI Consultants

Project Description: Ludington State Park - Big Sable Point Lighthouse Protecti

MasonCounty:

44 Official Request #:

Project Number: 751/21078.GAG

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .

Straight Hourly

Time and a Half

Double Time

Contract must be awarded by: 7/19/2022

Issue Date: 4/20/2022

Name

Classification Overtime ProvisionDescription

Official Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Inclement weather make-up day Saturday at straight time for 8 hours, hours over 8 at time and half.

make up day allowedcomment

Carpenter

X X H H H H H D$45.55 $58.17 $70.79

CA-100

Carpenter N

12/1/2021

Apprentice Rates:

1st year $37.98 $46.81 $55.65

2nd year $39.24 $48.71 $58.17

3rd year $41.76 $52.49 $63.21

4th year $44.29 $56.28 $68.27

Saturday make up day allowedcomment

X X H H H H H D$47.10 $60.69 $74.27

CA-100FL

Floor Layer N

12/1/2021

Apprentice Rates:

1st year $38.95 $48.46 $57.97

2nd year $40.31 $50.50 $60.69

3rd year $43.02 $54.57 $66.11

4th year $45.74 $58.65 $71.55

Saturday make up day allowedcomment

Cement Mason

X X H H H H H D$47.44 $61.03 $74.61

BR2-40-CM

Cement Mason Y

11/19/2021

Apprentice Rates:

0-749 hours $37.93 $46.76 $55.59

750-1,499 hours $39.29 $48.80 $58.31

1,500-2,249 hours $40.65 $50.84 $61.03

2,250-2,999 hours $42.01 $52.88 $63.75

3,000-3,749 hours $43.36 $54.91 $66.45

3,750-4,499 hours $44.72 $56.95 $69.17

4,500 hours $47.44 $61.03 $74.61

Requestor: GEI Consultants

Project Description: Ludington State Park - Big Sable Point Lighthouse Protecti

MasonCounty:

44 Official Request #:

Project Number: 751/21078.GAG

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/19/2022

Issue Date: 4/20/2022

Name

Classification Overtime ProvisionDescription

Official Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

H H H H H H H D$43.45 $56.64 $69.82

CE514-BR

Cement Mason Y

11/29/2021

Apprentice Rates:

1st Year $34.22 $42.79 $51.36

2nd Year $36.86 $46.75 $56.64

3rd Year $39.49 $50.70 $61.90

Drywall

H H H H H H H D$44.69 $57.32 $69.95

PT-1803-DF

Drywall Finisher 4 10 hour days allowed on consecutive days, Monday-Friday. Make up day allowed M-F for work missed due to holidays or inclement weather.

Y

1/7/2022

Apprentice Rates:

Level 1 $32.06 $38.37 $44.69

Level 2 $37.11 $45.95 $54.79

Level 3 $42.16 $53.53 $64.89

Monday or Friday make up day allowedcomment

Electrician

H H H H D D D D$39.75 $55.49 $71.23

EC-275 SC

Sound and Communication Journeyman Technician N

4/4/2022

Apprentice Rates:

1st period $21.14 $29.81 $38.46

2nd period $22.71 $32.15 $41.60

3rd period $24.28 $34.52 $44.74

4th period $25.86 $36.88 $47.90

Subdivision of county Townsihps of Victory, Sherman, Sheridan, Hamlin, Amber, Pere Marquette, Custer, Branch, Summit, Riverton, Eden, & Logan

Project Description: Ludington State Park - Big Sable Point Lighthouse Protecti

MasonCounty:

44 Official Request #:

Project Number: 751/21078.GAG

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/19/2022

Issue Date: 4/20/2022

Name

Classification Overtime ProvisionDescription

Official Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

H H H H H H H D$53.90 $76.72 $99.53

EC-275-IW

Inside Wireman Y

4/4/2022

Apprentice Rates:

1st period 0-1,000 hrs $24.09 $32.25 $40.41

2nd period 1,001-2,000 hrs $25.88 $34.94 $43.99

3rd period 2,001-3,500 hrs $27.96 $38.06 $48.15

4th period 3,501-5,000 hours $29.80 $40.82 $51.83

5th period 5,001-6,500 hrs $34.15 $47.34 $60.53

6th period 6,501-8,000 hrs $37.92 $53.00 $68.07

Subdivision of county Victory, Sherman, Sheridan, Hamlin, Amber, Pere Marquette, Custer, Branch, Summit, Riverton, Eden, & Logan townships

4 consecutive 10s allowed M-Th Friday may be used as a make-up day make up day allowedcomment

H H H H H H D D$52.50 $68.71 $84.91

EC-498-IW

Inside Wireman Double time pay required after 12 hours worked Monday - Friday

Y

11/22/2021

Apprentice Rates:

1st Period 0-1000 hours $21.55 $28.03 $34.51

Period 2 1000-2000 hours $23.26 $30.55 $37.84

Period 3 2000-2500 hours $27.09 $36.00 $44.92

Period 4 3500-5000 hours $28.86 $38.59 $48.31

Period 5 5000-6500 hours $33.31 $44.66 $56.00

Period 6 6500-8000 hours $36.80 $49.77 $62.73

Subdivision of county Townships of Grant, Freesoil and Meade ONLY.

Four tens allowed if consecutive days M-Th; Friday may be used as a make-up day.

make up day allowedcomment

Elevator Constructor

D D D D D D D D$96.72 $152.57

EL-85

Elevator Constructor Mechanic Y

11/30/2021

Apprentice Rates:

1st year $68.96 $99.68

2nd year $74.88 $111.18

3rd year $77.85 $116.95

4th year $84.65 $129.33

Requestor: GEI Consultants

Project Description: Ludington State Park - Big Sable Point Lighthouse Protecti

MasonCounty:

44 Official Request #:

Project Number: 751/21078.GAG

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/19/2022

Issue Date: 4/20/2022

Name

Classification Overtime ProvisionDescription

Official Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

4 tens allowed M-TH comment

Glazier

H H H H H H H D$49.84 $67.73 $85.62

GL-826

Glazier 4 tens allowed on consecutive days Y

12/9/2021

Apprentice Rates:

1st level $31.62 $40.40 $49.18

2nd level $35.12 $45.66 $56.18

3rd Level $40.38 $53.54 $66.70

4th level $45.66 $61.46 $77.26

Heat and Frost Insulator

X X X H H H H H$25.29 $36.51

AS25S

Spray Insulation N

6/2/2016

Heat and Frost Insulator and Asbestos Worker

X X X H H H H D$52.00 $68.89 $85.77

AS47

Heat and Frost Insulators and Asbestos Workers Y

12/20/2021

Apprentice Rates:

1st year $26.38 $33.69 $40.99

2nd year $30.15 $38.92 $47.68

3rd year $33.92 $44.15 $54.37

4th year $37.70 $49.39 $61.08

5th year $41.48 $54.63 $67.78

Friday for cancelled work in a 4 10 schedule make up day allowedcomment

Requestor: GEI Consultants

Project Description: Ludington State Park - Big Sable Point Lighthouse Protecti

MasonCounty:

44 Official Request #:

Project Number: 751/21078.GAG

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/19/2022

Issue Date: 4/20/2022

Name

Classification Overtime ProvisionDescription

Official Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Ironworker

H H D H D D D D$63.59 $92.70 $121.81

IR-25-RF

Reinforced Iron Work N

12/16/2021

Apprentice Rates:

Level 1 $47.70 $68.81 $89.91

Level 2 $48.76 $70.40 $92.03

Level 3 $51.49 $74.50 $97.49

Level 4 $54.22 $78.59 $102.95

Level 5 $56.93 $84.77 $112.62

Level 6 $58.46 $84.95 $111.43 make up day allowed

H H H H H H H D$70.50 $101.32 $132.14

IR-25-RIG

Rigging Work N

12/16/2021

Apprentice Rates:

Level 1& 2 $45.08 $64.21 $83.34

Level 3 $47.97 $68.55 $89.12

Level 4 $50.88 $72.92 $94.94

Level 5 $53.77 $77.24 $100.72

Level 6 $56.69 $84.41 $112.12

Level 7 $59.57 $85.95 $112.32

Level 8 $62.49 $90.33 $118.16

Laborer

X X H H H H H D$35.48 $46.68 $57.88 l355-2-a

Class A Laborer - all construction on buildings, pumps, well wheels, air, electric or gasoline tools, motor driven buggies, fire watch duty, working on swing scaffolds, heavy construction work, carpenter tender, cement finisher tender, heater tender & fl

Y

12/14/2021

Apprentice Rates:

0 - 1,000 work hours $29.88 $38.28 $46.68

1,001 - 2,000 work hours $31.00 $39.96 $48.92

2,001 - 3,000 work hours $32.12 $41.64 $51.16

3,001 - 4,000 work hours $34.36 $45.00 $55.64

Requestor: GEI Consultants

Project Description: Ludington State Park - Big Sable Point Lighthouse Protecti

MasonCounty:

44 Official Request #:

Project Number: 751/21078.GAG

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/19/2022

Issue Date: 4/20/2022

Name

Classification Overtime ProvisionDescription

Official Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Monday - Saturday make up day allowedcomment

X X H H H H H D$35.48 $46.68 $57.88

L355-2-B

Class B Laborer - jackhammer operators, crocklayers and caisson worker in buildings.

Y

12/14/2021

Apprentice Rates:

0-1,000 work hours $29.88 $38.28 $46.68

1,001-2,000 work hours $31.00 $39.96 $48.92

2,001-3,000 work hours $32.12 $41.64 $51.16

3,001-4,000 work hours $34.36 $45.00 $55.64

Monday - Saturday make up day allowedcomment

X X H H H H H D$35.48 $46.68 $57.88

L355-2-C

Class C Laborer - top men on chimneys or towers over thirty feet in height, material mixers, portable mixer operator, plasterer tender, mason tender, and demolition burner.

Y

12/14/2021

Apprentice Rates:

0-1,000 work hours $29.88 $38.28 $46.68

1,001-2,000 work hours $31.00 $39.96 $48.92

2,001-3,000 work hours $32.12 $41.64 $51.16

3,001-4,000 work hours $34.36 $45.00 $55.64

Monday - Saturday make up day allowedcomment

X X H H H H H D$40.24 $53.77 $67.30

L355-2-D

Class D Laborer - concrete specialist when no cement finishers are available; troweling, finishing, screeding, patching, cutting, curing of cast in place or precast concrete by any and all methods.

Y

12/14/2021

Apprentice Rates:

0-1,000 work hours $33.48 $43.63 $53.78

1,001-2,000 work hours $34.83 $45.66 $56.48

2,001-3,000 work hours $36.18 $47.68 $59.18

3,001-4,000 work hours $38.89 $51.74 $64.60

Monday - Saturday make up day allowedcomment

Requestor: GEI Consultants

Project Description: Ludington State Park - Big Sable Point Lighthouse Protecti

MasonCounty:

44 Official Request #:

Project Number: 751/21078.GAG

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/19/2022

Issue Date: 4/20/2022

Name

Classification Overtime ProvisionDescription

Official Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

H H H H H H H D$41.52 $55.36 $69.19

MITA-RZ3-C1

Laborer Road Class 1: asphalt shoveler or loader, yard man, fence erector tender, dumper, joint filling, form setting, form stripper, pavement reinforcing, waterproofing, seal coating, bridge painting, sandblasting, pressure grouting, RC equipment

Y

1/5/2022

Apprentice Rates:

3,001-4,000 hours $40.35 $53.60 $66.85

2,001-3,000 hours $38.01 $50.09 $62.17

1,001-2,000 hours $36.85 $48.35 $59.85

0-1,000 hours $35.68 $46.60 $57.51

H H H H H H H D$41.73 $55.67 $69.61

MITA-RZ3-C2

Laborer Road Class 2: mixer operator, air or electric tool operator, spreader, boxman, concreter paddler, power chain saw operator, paving patch truck dumper, tunnel mucker, concrete saw operator, dry pack macine and roto-mill grounds person

Y

1/5/2022

Apprentice Rates:

3,001-4,000 hours $40.55 $53.90 $67.25

2,001-3,000 hours $38.19 $50.36 $62.53

1,001-2,000 hours $37.01 $48.59 $60.17

0-1,000 hours $35.83 $46.82 $57.81

H H H H H H H D$42.02 $56.11 $70.19

MITA-RZ3-C3

Laborer Road Class 3: tunnel miner, finish tenders, guard rail builder, median barrier installer, earth retention barrier and wall installer, fence erector, bottom man, powder man, wagon drill and air track operator, curb and side rail setter

Y

1/5/2022

Apprentice Rates:

3,001-4,000 hours $40.83 $54.32 $67.81

2,001-3,000 hours $38.44 $50.74 $63.03

1,001-2,000 hours $37.25 $48.95 $60.65

0-1,000 hours $36.05 $47.15 $58.25

Project Description: Ludington State Park - Big Sable Point Lighthouse Protecti

MasonCounty:

44 Official Request #:

Project Number: 751/21078.GAG

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/19/2022

Issue Date: 4/20/2022

Name

Classification Overtime ProvisionDescription

Official Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

H H H H H H H D$42.46 $56.77 $71.07

MITA-RZ3-C4

Laborer Road Class 4: asphalt raker Y

1/5/2022

Apprentice Rates:

3,001-4,000 hours $41.24 $54.94 $68.63

2,001-3,000 hours $38.81 $51.29 $63.77

1,001-2,000 hours $37.60 $49.48 $61.35

0-1,000 hours $36.38 $47.64 $58.91

H H H H H H H D$42.08 $56.20 $70.31

MITA-RZ3-C5

Laborer Road Class 5: pipe layers, oxy-gun Y

1/5/2022

Apprentice Rates:

3,001-4,000 hours $40.88 $54.40 $67.91

2,001-3,000 hours $40.82 $54.30 $67.79

1,001-2,000 hours $37.29 $49.01 $60.73

0-1,000 hours $36.10 $47.22 $58.35

H H H H H H H D$42.51 $56.84 $71.17

MITA-RZ3-C6

Laborer Road Class 6: line form setter for curb or pavement, asphalt screed checker/screw man on asphalt paving machines

Y

1/5/2022

Apprentice Rates:

3,001-4,000 hours $41.29 $55.01 $68.73

2,001-3,000 hours $38.86 $51.36 $63.87

1,001-2,000 hours $37.64 $49.54 $61.43

0-1,000 hours $36.42 $47.70 $58.99

H H H H H H H D$45.84 $61.84 $77.83

MITA-RZ3-C7

Laborer Road Class 7: concrete specialist - including finishing and trowling, cast in place or precast by any method

Y

1/5/2022

Apprentice Rates:

3,001-4,000 hours $44.46 $59.76 $75.07

2,001-3,000 hours $41.69 $55.61 $69.53

1,001-2,000 hours $40.30 $53.52 $66.75

0-1,000 hours $38.92 $51.46 $63.99

Requestor: GEI Consultants

Project Description: Ludington State Park - Big Sable Point Lighthouse Protecti

MasonCounty:

44 Official Request #:

Project Number: 751/21078.GAG

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/19/2022

Issue Date: 4/20/2022

Name

Classification Overtime ProvisionDescription

Official Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

H H H X X X X D$46.70 $62.52 $78.33

MLDC

Asbestos & Lead Abatement Laborer 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days

Y

1/7/2022

Apprentice Rates:

Trainee 600 hours +1 year $34.07

Laborer - Hazardous

H H H H H H H D$35.48 $50.18 $64.88

LHAZ-Z9-A

Class A Laborer - performing work in conjunction with site preparation and other preliminary work prior to actual removal, handling, or containment of hazardous waste substances not requiring use of personal protective equipment required by state or feder

Y

12/14/2021

Apprentice Rates:

0-1,000 work hours $29.88 $41.78 $53.68

1,001-2,000 work hours $31.00 $43.46 $55.92

2,001-3,000 work hours $32.12 $45.14 $58.16

3,001-4,000 work hours $34.36 $48.50 $62.64

4 10s allowed M-Th or T-F; inclement weather makeup day Friday make up day allowedcomment

H H H H H H H D$36.48 $51.68 $66.88

LHAZ-Z9-B

Class B Laborer - performing work in conjunction with the removal, handling, or containment of hazardous waste substances when the use of personal protective equipment levels "A", "B" or "C" is required.

Y

12/14/2021

Apprentice Rates:

0-1,000 work hours $30.63 $42.90 $55.18

1,001-2,000 work hours $31.80 $44.66 $57.52

2,001-3,000 work hours $32.97 $46.42 $59.86

3,001-4,000 work hours $35.31 $49.92 $64.54

4 10s allowed M-Th or T-F; inclement weather makeup day Friday make up day allowedcomment

Requestor: GEI Consultants

Project Description: Ludington State Park - Big Sable Point Lighthouse Protecti

MasonCounty:

44 Official Request #:

Project Number: 751/21078.GAG

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/19/2022

Issue Date: 4/20/2022

Name

Classification Overtime ProvisionDescription

Official Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Laborer - Landscape

X X H X X X H D$28.80 $39.51 $50.18

LLAN-Z2-A

Class B1: Landscape Operatior includes air, gas, and diesel equipment operator, lawn sprinkler installer,skidsteer, mini excavators, ride and walk behind trenchers, backhoe loaders, off road dump vehicle, articulated haulers, hydroseeder, wheel loaders

Y

1/4/2022

X X H X X X H D$26.80 $36.48 $46.15

LLAN-Z2-B

Class B2: Skilled Landscape Laborer: small power tool operator, lawn sprinkler installers' tender, irrigation installers' tender material mover

Y

1/4/2022

H H H H H H H D$24.66 $33.27 $41.87

LLAN-Z2-C

Class C: landscape laborer with 90 or more calendar days worked N

1/7/2022

H H H H H H H D$15.54 $23.31 $31.08

LLAN-Z2-D

Class D: Inexperienced landscape laborer - individual who has worked less than 90 calendar days

N

1/7/2022

Laborer Underground - Tunnel, Shaft & Caisson

X X X X X X X D$38.42 $51.00 $63.57

LAUCT-Z2-1

Class I - Tunnel, shaft and caisson laborer, dump man, shanty man, hog house tender, testing man (on gas), and watchman.

Y

1/4/2022

Apprentice Rates:

0-1,000 work hours $32.85 $42.64 $52.43

1,001-2,000 work hours $33.97 $44.32 $54.67

2,001-3,000 work hours $35.08 $45.99 $56.89

3,001-4,000 work hours $37.31 $49.33 $61.35

Project Description: Ludington State Park - Big Sable Point Lighthouse Protecti

MasonCounty:

44 Official Request #:

Project Number: 751/21078.GAG

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/19/2022

Issue Date: 4/20/2022

Name

Classification Overtime ProvisionDescription

Official Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

X X X X X X X D$38.51 $51.13 $63.75

LAUCT-Z2-2

Class II - Manhole, headwall, catch basin builder, bricklayer tender, mortar man, material mixer, fence erector, and guard rail builder

Y

1/4/2022

Apprentice Rates:

0-1,000 work hours $32.92 $42.75 $52.57

1,001-2,000 work hours $34.04 $44.43 $54.81

2,001-3,000 work hours $35.16 $46.11 $57.05

3,001-4,000 work hours $37.39 $49.45 $61.51

X X X X X X X D$38.61 $51.28 $63.95

LAUCT-Z2-3

Class III - Air tool operator (jack hammer man, bush hammer man and grinding man), first bottom man, second bottom man, cage tender, car pusher, carrier man, concrete man, concrete form man, concrete repair man, cement invert laborer, cement finisher, con

Y

1/4/2022

Apprentice Rates:

0-1,000 work hours $32.99 $42.85 $52.71

1,001-2,000 work hours $34.12 $44.55 $54.97

2,001-3,000 work hours $35.24 $46.23 $57.21

3,001-4,000 work hours $37.49 $49.60 $61.71

X X X X X X X D$38.77 $51.52 $64.27

LAUCT-Z2-4

Class IV - Tunnel, shaft and caisson mucker, bracer man, liner plate man, long haul dinky driver and well point man.

Y

1/4/2022

Apprentice Rates:

0-1,000 work hours $33.11 $43.03 $52.95

1,001-2,000 work hours $34.25 $44.74 $55.23

2,001-3,000 work hours $35.38 $46.43 $57.49

3,001-4,000 work hours $37.64 $49.83 $62.01

Project Description: Ludington State Park - Big Sable Point Lighthouse Protecti

MasonCounty:

44 Official Request #:

Project Number: 751/21078.GAG

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/19/2022

Issue Date: 4/20/2022

Name

Classification Overtime ProvisionDescription

Official Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

X X X X X X X D$39.03 $51.91 $64.79

LAUCT-Z2-5

Class V - Tunnel, shaft and caisson miner, drill runner, keyboard operator, power knife operator, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars)

Y

1/4/2022

Apprentice Rates:

0-1,000 work hours $33.31 $43.33 $53.35

1,001-2,000 work hours $34.45 $45.04 $55.63

2,001-3,000 work hours $35.60 $46.77 $57.93

3,001-4,000 work hours $37.89 $50.20 $62.51

X X X X X X X D$39.34 $52.38 $65.41

LAUCT-Z2-6

Class VI - Dynamite man and powder man. Y

1/4/2022

Apprentice Rates:

0-1,000 work hours $33.54 $43.67 $53.81

1,001-2,000 work hours $34.70 $45.41 $56.13

2,001-3,000 work hours $35.86 $47.15 $58.45

3,001-4,000 work hours $38.18 $50.63 $63.09

X X X X X X X D$31.61 $40.78 $49.95

LAUCT-Z2-7

Class VII - Restoration laborer, seeding, sodding, planting, cutting, mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes and flagstones.

Y

1/4/2022

Apprentice Rates:

0-1,000 work hours $27.75 $34.99 $42.23

1,001-2,000 work hours $28.52 $36.15 $43.77

2,001-3,000 work hours $29.29 $37.30 $45.31

3,001-4,000 work hours $30.84 $39.63 $48.41

Project Description: Ludington State Park - Big Sable Point Lighthouse Protecti

MasonCounty:

44 Official Request #:

Project Number: 751/21078.GAG

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/19/2022

Issue Date: 4/20/2022

Name

Classification Overtime ProvisionDescription

Official Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Laborer -Underground Open Cut, Class I

X X X X X X X D$35.27 $46.28 $57.29

LAUC-Z4-1

Construction Laborer Y

1/4/2022

Apprentice Rates:

0-1,000 work hours $30.52 $39.16 $47.79

1,001-2,000 work hours $31.47 $40.59 $49.69

2,001-3,000 work hours $32.42 $42.01 $51.59

3,001-4,000 work hours $34.32 $44.86 $55.39

Laborer -Underground Open Cut, Class II

X X X X X X X D$35.40 $46.48 $57.55

LAUC-Z4-2

Mortar and material mixer, concrete form man, signal man, well point man, manhole, headwall and catch basin builder, guard rail builders, headwall, seawall, breakwall, dock builder and fence erector.

Y

1/4/2022

Apprentice Rates:

0-1,000 work hours $30.62 $39.31 $47.99

1,001-2,000 work hours $31.57 $40.73 $49.89

2,001-3,000 work hours $32.53 $42.17 $51.81

3,001-4,000 work hours $34.44 $45.04 $55.63

Laborer -Underground Open Cut, Class III

X X X X…