26B-103 SW Regional WRF O&M Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- 26-103
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 03111 Blowers: Industrial Types
- 90921 Building Construction, Industrial (Warehouse, Etc.)
- 91036 Heating, Air Conditioning, And Ventilation Maintenance And Repair Services (Including Installation)
- 91345 Construction, Sewer And Storm Drain
- 91360 Construction, Water System/Plants, Main And Service Line
- 92517 Civil Engineering
- 92596 Waste Water Treatment Engineering
- 92597 Water Supply, Treatment, And Distribution/Engineering
- UNSPSC codes
- 40101600 Air circulation and parts and accessories
- 40101601 Blowers
- 72121501 Chemical plant construction service
- 72121004 Paper or pulp mill construction and remodeling service
- 95122402 Cold storage installation
- 72151005 Boiler pressure controller installation
- 95121810 Irrigation and flood control waterworks
- 95121600 Transport buildings and structures
- 72121007 Truck and automobile assembly plant constructionand remodeling service
- 72121002 Food product manufacturing or packing plant construction and remodeling service
Show all 43
- 72121008 Warehouse construction and remodeling service
- 72101511 Air conditioning installation or maintenance or repair service
- 72121505 Waste water and sewage treatment plant construction service
- 81101500 Civil engineering
- 81101501 Well engineering
- 72121000 New industrial building and warehouse construction services
- 72121500 Industrial plant construction services
- 72121001 Dry cleaning plant construction and remodeling service
- 72121003 Grain elevator construction and remodeling service
- 72121401 Bank building construction service
- 72121502 Mine loading and discharging station construction service
- 72121507 Tank construction and servicing
- 72121508 Preparation plant construction service
- 95122403 Warehouse store
- 72154100 Distribution and conditioning system equipment maintenance and repair services
- 72103305 Drain laying service
- 72141120 Sewer line construction service
- 72121504 Waste disposal plant construction service
- 72141121 Water main construction service
- 72141125 Pumping station construction service
- 95121805 Well
- 95121804 Water tower
- 81101527 Wastewater engineering
- 81101528 Stormwater engineering
- 95122400 Industrial buildings and structures
- 72121005 Pharmaceutical manufacturing plant construction and remodeling service
- 95122401 Workshop
- 72151006 Boiler pressure controller maintenance or repair or operation
- 72151207 Heating and cooling and air conditioning HVAC installation and maintenance service
- 72154102 Heat exchanger maintenance or repair service
- 72154110 Fin fan cooling tower maintenance and repair service
- 72141123 Manhole construction service
- 95121811 Aquaduct or other water supply conduit, except pipeline
Opportunity details come from marionfl.bonfirehub.com. Updated .
About this opportunity
Marion County, Florida is requesting bids on construction of operations and maintenance improvements at the Southwest Regional Water Reclamation Facility, including installation of three new positive displacement blowers with associated electrical work, site preparation, instrumentation, and stormwater infrastructure, plus decommissioning of three existing blowers under ITB 26B-103, with bids due July 9, 2026.
Marion County has pre-purchased the three blowers to reduce lead time. Physical construction will not commence until blower delivery, though the selected contractor may begin permit acquisition during the interim period. All permits, including Marion County Building Department and NPDES permits for dewatering and stormwater pollution prevention, are the contractor's responsibility.
The scope encompasses demolition and modifications to the existing aeration blower system and chlorine contact basin; installation of a reclaimed water control valve; and site work including erosion control, grading, sodding, and roadwork. Work is performed at 11800 SE US Highway 441, Belleview, Florida. Substantial completion is required within 120 days and final completion within 180 days from Notice to Proceed. The contractor must maintain continuous operation of the existing wastewater treatment system and coordinate all work to minimize operational interference, with work typically performed weekdays 7:00 a.m. to 7:00 p.m., though weekend and nighttime work may be required with approval.
The bid form uses lump-sum line-item pricing across twelve major work categories: mobilization and demobilization, insurance and permits, payment and performance bonds, survey layout and as-builts, sitework clearing and grading, general restoration, blower area demolition and modifications, blower installation and start-up, chlorine contact tank area demolition and modifications, and electrical and instrumentation modifications. Bid pricing constitutes full compensation for labor, materials, equipment, overhead, profit, and incidental costs. Payment is prorated throughout construction in direct proportion to percentage of work completion.
Bidders must provide at least three references demonstrating completed similar work at water reclamation facilities. Bid security of 5% of total base bid, performance and payment bonds, and insurance including $1 million Commercial General Liability and $500,000 Business Auto Liability are required. Bids must remain firm for 90 days. The county intends to award within 60 days of the bid deadline. All bids must be submitted electronically through Bonfire at https://marionfl.bonfirehub.com.
Opportunity text
The project consists of installing three new Positive Displacement Blowers, including all associated electrical work, site preparation, instrumentation, and stormwater infrastructure. It also includes the decommissioning of three existing blowers, as well as the reuse of the existing hydropneumatic tank and automatic valve. Please note that Marion County has already purchased the blowers to reduce lead time. Physical construction will not begin until the blowers are delivered; however, the selected contractor may proceed with obtaining all required permits during this interim period.
Files
Show all 11
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity