24-108, Design: Canton Street Drainage & Pedestrian Improvements
Cancelled State & local contract opportunity Posted
- Solicitation number
- PE-66085-NONST-2024-000000006
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90735 Designing Services
- 91104 C.i.p., Architect/Engineer Extra Services
- 91119 C.i.p., Cost Estimate Verification
- 91187 Storm Drainage
- 91319 Construction, Curb And Gutter (Includes Maintenance, Repair, And Removal)
- 91347 Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps)
- 92528 Drainage Engineering
- 92533 Engineer Services, Professional
- 96121 Cost Estimating
- UNSPSC codes
- 72152704 Curb construction service
- 95121633 Culvert
- 46161535 Pedestrian walkway street boundary marker
- 46161538 Vehicle height restriction bars
- 72141105 Sidewalk construction and repair service
- 72152705 Sidewalk or ramp construction service
- 72152706 Driveway construction service
- 72152707 Retaining wall construction service
- 95111616 Pedestrian way
- 95111608 Bike path
Show all 11
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Alpharetta is seeking proposals from consultants for the design of improvements to the stormwater drainage and pedestrian safety along Canton Street from Mayfield Road to Canton Street extension. The design should integrate one or more stormwater management facilities to increase overall stormwater capture and infiltration, while also aligning with the existing community and pedestrian safety. The design should follow the context sensitive design methodology and include the addition of curb and gutter, new storm structures, and sidewalk, limited to the east side of Canton Street. The design should not impact any existing specimen trees and should be limited to the existing right-of-way. Proposals are due by November 16, 2023 at 10:00 AM.
However, this project has been cancelled by the City of Alpharetta. The award recommendation was presented to City Council on March 18, 2024, but City Council voted to deny the contract award and cancel the project. As a result, this project will not be moving forward for design at this time. No further details are provided on pricing terms, set asides, incumbents, funding requirements and sources, or other salient information.
Opportunity text
The City of Alpharetta is accepting proposals from consultants for the design of improvements for stormwater drainage and pedestrian safety along Canton Street from Mayfield Road to Canton Street extension. Any current City of Alpharetta contracted on-call consultants or consultants who are part of an on-call team currently contracted with the City of Alpharetta will not be considered for this project. Any proposals from said consultants will not be evaluated. The City expects the design to integrate one or more stormwater management facilities in a manner that augments the capture and infiltration or storage along the corridor. While the primary goal is an increase in overall stormwater capture and infiltration, the project aesthetics and design should align with the existing community and pedestrian safety. The overall approach should follow the context sensitive design methodology. The overall goal of the project is to lessen impacts of current stormwater runoff through residential properties into an already overly inundated flood prone watershed. The addition of curb and gutter, new storm structures, and sidewalk should be included in the overall design and approach. All new, re-located, or widened sidewalks should be solely limited to the east side of Canton Street. Curb and gutter should be incorporated on both sides of Canton Street where feasible. Curb and Gutter should be designed to fit the overall intent of the project that is aesthetically confluent to the overall design. Curb and Gutter should also consider the effective conveyance of stormwater and the aid in providing pedestrian safety. The design should not impact any existing specimen trees located along the street and the design should ensure that all specimen trees are protected from any proposed construction. The design should be limited to the existing Right of Way to the extent feasible to the overall design. The design may include the minimization of travel lanes, remo
Files
| File | Type | Posted |
|---|---|---|
| 24_108 Notice of Cancellation.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity