The City of Gardner, Massachusetts is soliciting sealed bids under IFB 2027-011 for the Keyes Road over Wilder Brook Culvert Replacement, with bids due November 5, 2026 at 1:00 p.m. Bidders must be prequalified by MassDOT in the Bridge Construction category to be eligible for award. No MBE/WBE participation requirements apply, per Addendum No. 3.

The work covers furnishing all labor, equipment, and materials for phased demolition of an 8-foot corrugated metal pipe culvert, the road surface, and the sidewalk; bank stabilization; dewatering; dredging; roadway grading; water main relocation; and a new 24-foot span three-sided rigid frame bridge (MassDOT Bridge No. G-01-025). Related deliverables include a hot mix asphalt walkway and berm, streambed restoration, roadway paving, guardrail, and 12-inch ductile iron water pipe with hydrants. Chlorinated flush water must be disposed of by an approved AWWA C651 method, with no discharge to storm sewers or natural watercourses. Bidders must submit a 5-percent bid bond and evidence of state licensing, and every employee must complete a minimum ten-hour OSHA-approved construction safety and health course before starting work. The builder's risk policy must include flood insurance.

The estimated project value is $1.93 million, funded through MassDOT's Community Culvert Grant. Substantial completion is due November 30, 2027, with final completion December 31, 2027, and liquidated damages of $1,000 per calendar day. The successful bidder must furnish performance and payment bonds for 100 percent of the contract price. Prevailing wage applies under MGL Chapter 149, Sections 26-27D and Davis-Bacon, with contractors complying with the greater of the two schedules. Mobilization is capped at 3 percent of the total bid, and the bid carries a $25,000 utility pole relocation allowance and a $35,000 traffic police allowance.

Award is expected within 30 days of bid opening, and the successful bidder must execute the contract within 10 days of the Notice of Award. Addendum No. 2 moved the bid deadline from October 29 to November 5, 2026, and the pre-bid meeting took place October 14, 2026. Addendum No. 1 states that utility pole relocations are not guaranteed before mobilization, so the contractor must start work and meet completion dates regardless. The project drew 81 plan holders between October 6 and October 22, 2026.

Opportunity text

The project includes furnishing all labor, equipment and materials required to complete the Keyes Road over Wilder Brook Culvert Replacement Project. The project includes, but is not limited to phased demolition of the existing CMP culvert, demolition of the existing road surface and sidewalk, bank stabilization and grading, dewatering, dredging, roadway grading, water main relocation, installation of a new 24-foot span 3-sided rigid frame bridge structure, installation of new HMA walkway a