This is Addendum No. 2 to the bidding documents for the Keyes Road Over Wilder Brook Culvert Replacement Project issued by the City of Gardner, Massachusetts on October 26, 2026. The addendum modifies the project bidding timeline, extending the sealed bid submission deadline from October 29, 2026 to November 5, 2026 at 1:00 p.m. local time at the City of Gardner Purchasing Agent's office, 95 Pleasant Street, Room 217, Gardner, Massachusetts 01440. The addendum addresses 12 clarifying questions received during the bidding period, covering topics including project start timeline (Notice to Proceed expected within 2-3 weeks of bid opening), insurance requirements (separate Builder's Risk policy mandated), water department services and costs (provided at no cost during standard business hours), material specifications, and notification procedures. Bidders must acknowledge receipt of this addendum on Page 00410-12, Article 5.2 of the bid form, with failure to do so potentially resulting in disqualification.
The addendum provides the updated plan holders list, documenting 81 entities that obtained bidding documents between October 6 and October 22, 2026, including construction companies, information services providers, and material suppliers primarily located throughout Massachusetts and the Northeast region. Key project cost clarifications include that the City of Gardner Water Department will operate valves, witness testing, and accept the new main at no cost during normal working hours; chlorination and flushing costs are defined in bid item 302.12 specifications; and no connection fees are required. Chlorinated flush water must be disposed of using an approved AWWA C651 method with no discharges permitted to storm sewers or natural water courses, as there is no sanitary sewer in the project vicinity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A2-1
Addendum No. 2
Keyes Road Over Wilder Brook Culvert Replacement Project
Gardner, MA
Addendum No. 2 to the Bidding Documents
Keyes Road Over Wilder Brook Culvert Replacement Project City of Gardner
Gardner, MA 01440
Issued October 26, 2026
Under the provisions of Article 11 of Section 00112, Information for Bidders, Bidders are informed that the Bidding Documents for the above mentioned Project are modified, corrected, and/or supplemented as follows. Addendum No. 2 becomes part of the Bidding Documents and Contract Documents.
Acknowledge receipt of this addendum by inserting its number on Page 00410-12, Article 5.2 of the Bid form.
Failure to acknowledge receipt of the Addendum may subject the Bidder to disqualification.
Project Manual Changes
Item 2-1 Section 00100 – Invitation for Bid
Delete the following: “Sealed general bids will be received by the City of Gardner, Purchasing Agent at 95 Pleasant Street, Room 217, Gardner, Massachusetts 01440 until 1:00 p.m. local time on October 29, 2026 at which time and place said bids shall be publicly opened and read,” and replace it with the following: “Sealed general bids will be received by the City of Gardner, Purchasing Agent at 95 Pleasant Street, Room 217, Gardner, Massachusetts 01440 until 1:00 p.m. local time on November 5, 2026 at which time and place said bids shall be publicly opened and read.”
Clarifications:
Item 2-2 Remaining questions received are currently being reviewed and will be addressed in a subsequent addendum.
Bid Period Questions:
The following responses/clarifications are based on questions raised during the bidding period.
1. I do see the completion date and I know the specs state that you will issue a Notice To Proceed but do you have any idea when you are expecting the project to start?
Please refer to section 00500 Article 2 for project completion times. Within 2-3 weeks after the bid opening a notice to proceed will be issued to the qualified low bidder.
2. On Page GC-16 of the General Conditions it calls for “Builder’s Risk” insurance. Since this is a site project is a separate Builder’s Risk policy necessary or can this requirement be accommodated by an “installation floater” instead.
A separate Builder’s Risk insurance policy will be required for this project.
A2-2
Addendum No. 2
Keyes Road Over Wilder Brook Culvert Replacement Project
Gardner, MA
3. Please provide water department costs/information for crew time to operate valves and be on site for connections and shutdowns (hourly rate, any minimum call-out, and overtime). Any inspection or test-witnessing fees?
The City of Gardner Water Department will operate existing valves, be present for shutdowns and connections, inspect new pipe, witness testing, and accept the new main at no cost to the contractor during normal working hours between 6:30am to 3:30pm Monday-Thursday and 6:30am to 12:30pm Friday.
4. Provide the cost of water used to fill, flush and test the new main, and any hydrant meter or permit cost.
Chlorination and flushing will be measured and paid as defined in the special provisions of Bid Item 302.12.
5. Any permit or connection fees?
No connection fees will be required.
6. Any fee or permit to discharge chlorinated flush water to the sewer.
In accordance with the special provisions of bid item 302.12, chlorinated flush water must be disposed of in accordance with an approved AWWA C651 method that is acceptable to the City of Gardner as there is no sanitary sewer in the project vicinity. No discharges of chlorinated water to any storm sewer or natural water courses are permitted.
7. Provide the City's approved brands for pipe, valves and hydrants
Refer to Section 300 of the special provisions for material requirements of the permanent water main and valves to be installed.
8. Provide the City's hydrant color
Refer to the special provisions of bid item 376 for hydrant manufacturers and color requirements.
9. How much advance notice you need for a water shutdown, and whether the City or the contractor notifies residents Refer to the special provisions of bid item 345.61 for shutdown notifications.
10. Confirm the bid date and time listed above are unchanged.
Bid date has been revised as part of this Addendum to November 5, 2026 at 1pm.
11. Provide construction cost estimate or a construction cost range for the project.
Refer to section 00100 for the MassDOT prequalification estimate.
12. Provide updated Planholders list/bidders list and Non-Mandatory pre-bid attendance list.
Please see attached updated plan holders list. The non-mandatory pre-bid attendance list was attached to Addendum #1.
END OF ADDENDUM NO. 2
J:\G\G0384 Gardner\T60 - Keyes Road Culvert Replacement\Bidding\Addenda\Addendum #2\G-0384-T60 Addendum #2.docx
Submission Date Company or Individual Name: Contact Person Phone Number Email Address Mailing Address City State Zip Code 10/6/2026 bidric Craig Engerman 617-212-6333 craig@bidric.com 700 Narragansett Park Dr Ste 100 Pawtucket RI 2861 10/7/2026 PB pooja Basena 8698143505 Basenajitu2@gmail.com 3207 International Drive, Suite G Mobile Alabama 36606 10/7/2026 dfggfg fgfgfg fgfgfg 1596325874 wevwewhe@gmail.com fgfdgfgdftgrttryty thgrjethurth rbejthjerh 14785 10/7/2026 Dodge Data & Analytics jayalakshmi 4133767032 jayalakshmil@construction.com 4300 Beltway Place, Ste 150 Arlington Texas 76018 10/7/2026 Bidnet Kurt Pitzer 8006771997 gbs@bidnet.com 17 British American BLVD Latham NY 12110 10/7/2026 Onyx Corporation Joel Shaw 6173357114 joels@onyxcorporation.net 18 Wetherbee Street Acton MA 1452 10/7/2026 A.J. Virgilio Construction Inc Pam Pressey 413-562-6600 pam@ajvirgilio.com 86 Medeiros Way WESTFIELD Massachusetts 1085 10/7/2026 P.J. Albert, Inc. Sonya Thomas 9783457828 sonya@pjalbert.com P.O. Box 2165 FITCHBURG MA 1420 10/7/2026 MAS Building & Bridge Inc Jennifer Mackey 508-520-2277 jmackey@masbuildingandbridge.com 18 Sharon Avenue Norfolk MA 2056 10/7/2026 A.F. Amorello & Sons, Inc. Lori Prentiss 508-791-8778 estimating@afamorello.com 115 SW Cutoff Worcester MA 1604 10/7/2026 Clayton D. Davenport Trucking, Inc. Brian Koshinsky 4137742080 cddavenport.estimating@gmail.com 130 Colrain Street Greenfield MA 1301 10/7/2026 Northern Construction Service, LLC Dulce Ramalho 4132891230 dramalho@NorthernConstruction.com 1520 Park Street, PO Box 900 Palmer MA 1069 10/7/2026 Ricciardi Bros., Inc. Casey Lemoine 5087530175 casey@ricciardibrosinc.com 200 Century Dr. West Boylston MA 1583 10/7/2026 SumCo Eco-Contracting, LLC Tim Feliciano 9787441515 estimating@sumcoeco.com 401 Edgewater Place Wakefield MA 1880 10/7/2026 Rifenburg Contracting Corp. Andrea Telford 4133566291 rcc-ma-estimating@rifenburg.net 703 W. Housatonic St, Ste L3 Pittsfield MA 1201 10/7/2026 DeFelice Corporation Julie DeFelice 9784526967 engineering@defelicecorp.com 28 Silva Lane MA MA 1826 10/7/2026 UEL Contractors, Inc. Pam Dobeck 9788150751 pam.dobeck@uelcontractors.com 65 Parker Street Clinton MA 1510 10/7/2026 True North Civil Michael Iarossi 4017875800 miarossi3@truenorthcivil.com 805 Nooseneck Hill RD West Greenwich RI 2817 10/7/2026 Source Management Source Management 2063739500 deltekplusonvia@gmail.com 509 Olive Way Suite 400 Seattle WA 98101 10/7/2026 Company Information Adam Bouman 513666335 dodge.docs@construction.com 300 American Metro Blvd #185 Hamilton Township New Jersey 8619 10/7/2026 Manafort Transit Courtney Baro 7813282366 CBaro@Manaforttransit.com 318 Bear Hill Road, ste. 10 Waltham Massachusetts 2451 10/7/2026 E.C.F Construction LLC Elison Fernandes 4135753507 elison@ecfconstructionllc.com 49 Truby Street Granby MA 1033 10/8/2026 Deltek Source Management 2063739500 sourcemanagement@deltek.com 2291 Wood Oak Drive Herndon VA 20171 10/8/2026 Joseph P. Cardillo & Son, Inc. Maura A Sarnaglia 7812458095 maura@jpcardillo.com 163 Elm Street Salisbury MA 1952 10/8/2026 On Point Construction Services Douglas Maguire 4133553105 dmaguire@onpointct.com dmaguire@onpointct.com Agawam MA 1001 10/8/2026 C & A Construction David Fernandes 4133315317 david@canda-construction.com 796 Sheridan St Chicopee MA 1020 10/8/2026 Construct Connect Michael Stubbs 8003642059 content@constructconnect.com Shipping Address: 30 Technology PKWY. S, Suite 100, Norcross GA 30092 10/8/2026 E.T.& L. Corp. Jamie Lee 9788974353 jlee@etlcorp.com 873 Great Road Stow Massachusetts 1775 10/8/2026 K5 Corporation Karyn Thompson 7819829229 kthompson@k5corporation.com 9 Rockview Way Rockland MA 2370 10/8/2026 DeLucca Fence Company, Inc. Janet J DeLucca 9786882877 jjdelucca@deluccafence.com 5 Old Ferry Road Methuen Massachusetts 1844 10/8/2026 Morais Contractors Maria Morais 413547-2947 aaron@moraiscontractors.com 108 Rocus Street Springfield Ma 1104 10/8/2026 Dodge Jayalakshmi L 9630124578 jayalakshmil@construction.com abc abc NY 12345 10/8/2026 Emmaty, Inc. Manuela Gomez 5083690822 manuela.gomez@emmaty.com 277 Main Street Northborough MA - Massachusetts 1532 10/8/2026 PJ Keating Company Kaitlyn Patterson 978-582-5200 kaitlyn.patterson@pjkeating.com 998 Reservoir Rd Lunenburg MA 1462 10/8/2026 Dodge Construction Network Elisse 8443263826 Elisse.Delasarmas@construction.com 300 American Metro Blvd Ste 185 Hamilton NJ 8619 10/8/2026 Maverick Construction Management Services, Inc. Sue Belville 9785039185 sbelville@maverick-cm.com 37 Town Forest Rd Oxford Massachusetts 1540 10/8/2026 ConstructConnect Sarah Torres 5134588583 Sarah.Torres@constructconnect.com 3825 Edwards Rd. Suite 800, Cincinnati, OH. 45209 Cincinnati OH 45209 10/8/2026 Projectdog, Inc. Project Leads Manager 9784999014 addenda@projectdog.com 18 Graf Road, Unit 8 Newburyport MA 1950 10/9/2026 Baltazar Contractors, Inc. Tamera Lee Langone 4135836160 office@baltazarcontractors.com 83 Carmelinas Circle Ludlow MA 1056 10/9/2026 R. A. Powell Construction Corp. Dustin Powell 9785378100 dpowell@powellstone.com 133 Leominster Shirley Road Lunenburg MA 1462 10/9/2026 United concrete Products Robert Freer 2032343119 rfreer@unitedconcrete.com United concrete Products United concrete Products Connecticut 6492 10/9/2026 ConstructConnect Morgan Stinson 8718715708 content@constructconnect.com 3825 Edwards Rd. Ste. 800 Cincinnati OH 45209 10/9/2026 Kodiak Corporation Denise Steed 9786850777 dsteed@kodiakcorporation.com 65 Glenn Street Lawrence Massachusetts 1843 10/9/2026 Unified Contracting, Inc Bill Gear (781) 760-5382 bill@unifiedcon.com bill@unifiedcon.com Everett, MA 02149 MA 2149
10/12/2026 S&R Corporation Brett Gallagher 9787718558 bgallagher@sandrcorp.com bgallagher@sandrcorp.com Lowell Massachusetts 1854 10/12/2026 Dodge Jayalakshmi L 9630124578 jayalakshmil@construction.com abc abc NY 12345 10/12/2026 Western Earthworks, LLC Mariel Lima 4135841484 mariel@westernearthworks.com PO Box 131 North Hatfield MA 1066 10/12/2026 PWXPress Gio Saravini 4067689412 quotes@gtechresearch.com 1900 Coffeeport Rd Jacksonville, Florida 32208 10/12/2026 PWXPress Mary Miller 4086768941 bids@pwxpress.com 1900 Coffeeport Rd Jacksonville Florida 32208 10/13/2026 PWXPress Mary Miller 4086768941 bids@pwxpress.com 1900 Coffeeport Rd Jacksonville FL 32208 10/13/2026 Greener Group LLC Michael Ruggiero 9786549475 mruggiero@greenergroupllc.com 123 Bolt St Lowell Massachusetts 01852-5376 10/13/2026 Caracas Construction Corp Matthew Holda 413-341-5311 estimating@caracascorp.com estimating@caracascorp.com Ludlow MA 1056 10/13/2026 Pipe Plus Matt Moriarty 9785344995 Matt@pipeplus.com 651 Lancaster street Leominster Massachusetts 1453 10/13/2026 Blue Diamond Equipment Co CC MAHONEY 5085433711 bluediamondcc@comcast.net 73 East Belcher Road Foxboro MA 2035 10/14/2026 Dodge Jayalakshmi L 9630124578 jayalakshmil@construction.com abc abc NY 12345 10/14/2026 Unified Contracting, Inc. Bill Gear 617-944-9255 bill@unifiedcon.com 381 Third Street Everett MA 2149 10/14/2026 new england Infrastructure srushti yadav 978-293-3535 syadav@neinfrastructure.com 16 Brent dr Hudson MA 1749 10/14/2026 new england Infrastructure srushti yadav 978-293-3535 syadav@neinfrastructure.com 16 Brent dr Hudson MA 1749 10/14/2026 JR Vinagro Corp Wayne Clarke 4016409470 wclarke@jrvinagrocorp.com 2208 Plainfield Pike Johnston RI 02919-5717 10/15/2026 Palmer Paving Corporation Jon Kurowski 4133880179 jkuro@peckham.com 25 Blanchard St Palmer MA Massachusetts 1069 10/15/2026 New England Infrastructure, Inc. Annie Aubrey 9782933535 aaubrey@neinfrastructure.com aaubrey@neinfrastructure.com Hudson MA 1749 10/15/2026 ConstructConnect Sarah Torres 5134588583 Sarah.Torres@constructconnect.com 3825 Edwards Rd. Suite 800, Cincinnati, OH. 45209 Cincinnati OH 45209 10/15/2026 Dodge Construction Network ELisse 8443263826 Elisse.Delasarmas@constructconnect.com 300 American Metro Blvd Ste 185 Hamilton NJ 8619 10/19/2026 BALTAZAR CONTRACTORS, INC. TAMERA L LANGONE 413-583-6160 OFFICE@BALTAZARCONTRACTORS.COM 83 Carmelina's Circle Ludlow MA 1056 10/19/2026 Rifenburg Contracting Corp. Greg Brawders 5089445061 gbrawders@rifenburg.net 703 W Housatonic St Suite L3 Pittsfield MA 1201 10/19/2026 Maverick Construction Sue Belville 9785039185 sbelville@maverick-cm.com 37 Town Forest Rd Oxford Massachusetts 1540
10/19/2026 Western Earthworks, LLC Mariel Lima 4135841484 mariel@westernearthworks.com PO Box 131 North Hatfield MA 1066 10/19/2026 United Concrete Products Bill Augustus 5086889566 baugustus@unitedconcrete.com 173 Church Street Yalesville CT 6492 10/19/2026 Projectdog, Inc. Project Leads Manager 9784999014 addenda@projectdog.com 18 Graf Road, Unit 8 Newburyport MA 1950 10/19/2026 A.J. Virgilio Construction Inc Pam Pressey 4135626600 estimating@ajvirgilio.com 86 Medeiros Way Westfield - None - 1085 10/19/2026 K5 Corporation Karyn Thompson 7819829229 kthompson@k5corporation.com kthompson@k5corporation.com Rockland, MA MA 2370 10/20/2026 North america procurement council. PBC Eric Johnson 302-450-1923 sourcemanagement@napc.me PO Box 40445 Grand Junction Colorado 81504 10/20/2026 David G. Roach & Sons, Inc. James Korzec 9784346315 jkorzec@dgrsons.com 99 Barre Depot Rd. P.O. 359 Barre MA 1037 10/20/2026 ConstructConnect Sarah Torres 5134588583 Sarah.Torres@constructconnect.com 3825 Edwards Rd. Suite 800, Cincinnati, OH. 45209 Cincinnati OH 45209 10/21/2026 Dodge Jayalakshmi L 9630124578 jayalakshmil@construction.com abc abc NY 12345 10/21/2026 McGraw-Hill Dodge Report Dodge Team 480755358 dodge_reocwb@mcgraw-hill.com 1221 Avenue of the Americas New York tx 77845 10/22/2026 S&R Corporation Claudia Rocca 9784412000 crocca@sandrcorp.com 706 Broadway Street Lowell MA 1854
| Keyes Road Over Wilder Brook Culvert Replacement Project |
| City of Gardner |
| Gardner, MA 01440 |
| END OF ADDENDUM NO. 2 |
File details come from the government source that posted it. Updated .