G0384-T60_Keyes Road Bid Plans _Stamped.pdf
PDF 11 MB Posted
- Attached to
- 2027-011 Keyes Road Culvert Replacement
- Solicitation number
- BD-27-1441-COG01-COG01-134215
- Issued by
- Worcester County, Massachusetts
About this file
This is a bid plan document for the City of Gardner, Massachusetts, prepared in coordination with MassDOT Highway Division for the Keyes Road Over Wilder Brook Culvert Replacement Project (Project No. G0384-T060, MassDOT Bridge No. G-01-025, BIN No. CD5). The project involves the replacement of an existing culvert structure on Keyes Road crossing Wilder Brook. The complete set of construction documents comprises 24 sheets of detailed technical drawings and specifications, including bridge plans and elevations, construction staging plans, foundation and abutment details, wingwall plans, guardrail details, and traffic control plans. The design was prepared by Tighe & Bond, with professional engineers Daniel S. Holmes (PE, LEED AP) and Matthew P. Wzorek (PE, MCPPO) as the lead designers. The project documents were finalized in October 2026 and include comprehensive engineering details covering existing conditions demolition, site plans, construction details across multiple sheets, boring logs and geotechnical information, and standard MassDOT details for bridge railings and guardrail transitions.
The bid plans document establishes technical requirements and construction standards for contractors to develop accurate project bids. The plans reference MassDOT standard details and specifications, including bridge railing standards from the MassDOT 2013 LRFD Bridge Manual and 2017 Construction Standard Details. The project includes site-specific construction sequencing with two potential construction stages detailed in the plans, along with temporary traffic control provisions for managing roadway access during construction. Material specifications include concrete base courses with 3,000 PSI mix design, granite curbing with specified reveal requirements, erosion control measures utilizing coir logs and live stakings, and geotextile fabric installation. The plans incorporate geotechnical investigation data through boring logs and notes to inform foundation and abutment design. No specific contract award date, funding sources, or pricing information is detailed within these technical bid plans.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pl ot te d
O n:
O ct
6, 6-
:1 8p m B y:
J
Ps ze ni cz ny La st S av ed
:1 0/
6/
Ti gh e
B on d:
tig he bo nd
.c om
\d at a\ D at a\
Pr oj ec ts
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_1 _C
O V
ER
.d w g
PREPARED BY:
COMPLETE SET 25 SHEETS
PREPARED BY:
DANIEL S. HOLMES, PE, LEED AP MATTHEW P. WZOREK, PE, MCPPO
CITY OF GARDNER, MASSACHUSETTS
KEYES ROAD OVER WILDER BROOK
CULVERT REPLACEMENT
PROJECT NO: G0384-T060
MASSDOT BRIDGE NO. G-01-025, BIN NO. CD5
OCTOBER 2026
PROJECT
LOCATION
LIST OF DRAWINGS
SHEET NO. SHEET TITLE
1 COVER
2 BRIDGE KEY PLAN, PROFILES, LOCUS, & INDEX
3 GENERAL NOTES, LEGEND, AND ABBREVIATIONS (SHEET 1 OF 2)
4 GENERAL NOTES, LEGEND, AND ABBREVIATIONS (SHEET 2 OF 2)
5 EXISTING CONDITIONS AND DEMOLITION PLAN
6 SITE PLAN
7 CONSTRUCTION DETAILS (SHEET 1 OF 4)
8 CONSTRUCTION DETAILS (SHEET 2 OF 4)
8A CONSTRUCTION DETAILS (SHEET 3 OF 4)
9 CONSTRUCTION DETAILS (SHEET 4 OF 4)
10 TEMPORARY TRAFFIC CONTROL PLAN
11 BORING LOGS & BORING NOTES
12 GENERAL BRIDGE PLAN AND ELEVATION
13 POTENTIAL CONSTRUCTION STAGE 1 PLAN & SECTION
14 POTENTIAL CONSTRUCTION STAGE 2 PLAN & SECTION
15 BRIDGE SECTIONS AND DETAILS
16 FOUNDATION PLAN AND DETAILS
17 WINGWALL PLAN AND ELEVATIONS
18 HIGHWAY GUARDRAIL DETAILS (SHEET 1 OF 2)
19 HIGHWAY GUARDRAIL DETAILS (SHEET 2 OF 2)
20 CT-TL2 BRIDGE RAILING
21 TOP OF PRECAST HIGHWAY GUARDRAIL TRANSITION FOR CT-TL2 RAILING
22 PRECAST GUARDRAIL TRANSITION AND CT-TL2 BRIDGE RAILING DETAILS
23 GUARDRAIL TRANSITION TO BRIDGE RAIL (FACE OF CURB)
24 GUARDRAIL APPROACH GEOMETRY LOCATION MAP
SCALE: 1" = 1000'
PREPARED FOR:
CITY OF GARDNER
MICHAEL J. NICHOLSON, MAYOR
DEPARTMENT OF COMMUNITY
DEVELOPMENT AND PLANNING
JASON STEVENS, DIRECTOR
FOR CONSTRUCTION
MATT
WZOREK
CIVIL
52674No.
10/06/2026
DANIEL S.
HOLMES
CIVIL
56624No.
10/06/2026
W W W W
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OEL1
L2 C1
-4.54%
G R
AD
E
BR
EA
K
ST
A
0+
.0
EL
EV
.2
G R
AD
E
BR
EA
K
ST
A
2+
.0
EL
EV
.4
W
W
0.26%
G R
AD
E
BR
EA
K
ST
A
0+
.4
EL
EV
.9
G R
AD
E
BR
EA
K
ST
A
2+
.6
EL
EV
.3
0+00
5.
2.
1+00
0.
8.
2+000+00 1+00 2+00
6.
101+00
7.
7.
102+00101+00 102+00
Pl ot te d
O n:
Fe b
-1 :1
8p m
B y:
S S ak
La st
S av ed :2
/9 /2
Ti gh e
B on d:
J:
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_2 _B
R
ID
G E_
C O
V
ER
.d w g
MARK DATE DESCRIPTION
G0384-T60_2_BRIDGE_COVER.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
BRIDGE KEY PLAN,
PROFILES, LOCUS, & INDEX
AS SHOWN
N
00 20' 40'
SCALE: 1" = 20'
N
SHEET 2
DANIEL S.
HOLMES
CIVIL
56624No.
02/09/2023
ANDREA
LACASSE
CIVIL
57194No.
02/13/2023
3/17/2023 te d
O n:
Fe b
-1 :1
8p m
B y:
S S ak
La st
S av ed :8
/1 7/
Ti gh e
B on d:
J:
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_3 -4
_G
EN
_N O
TE
S .d w g
MARK DATE DESCRIPTION
G0384-T60_3-4_GEN_NOTES.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
SHEET 3
GENERAL NOTES, LEGEND,
AND ABBREVIATIONS
(SHEET 1 OF 2)
NO SCALE
DANIEL S.
HOLMES
CIVIL
56624No.
02/09/2023
ANDREA
LACASSE
CIVIL
57194No.
02/13/2023 te d
O n:
Fe b
-1 :1
8p m
B y:
S S ak
La st
S av ed :8
/1 7/
Ti gh e
B on d:
J:
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_3 -4
_G
EN
_N O
TE
S .d w g
MARK DATE DESCRIPTION
G0384-T60_3-4_GEN_NOTES.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
GENERAL NOTES, LEGEND,
AND ABBREVIATIONS
(SHEET 2 OF 2)
NO SCALE
SHEET 4
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
OE
W
DANIEL S.
HOLMES
CIVIL
56624No.
02/09/2023
ANDREA
LACASSE
CIVIL
57194No.
02/13/2023
L1
L2C1
Pl ot te d
O n:
O ct
6, 6-
:1 9p m B y:
J
Ps ze ni cz ny La st S av ed
:1 0/
6/
Ti gh e
B on d:
tig he bo nd
.c om
\d at a\ D at a\
Pr oj ec ts
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_5 -9
_S
IT
E
PL
A N
D
ET
A
IL
S .d w g
MARK DATE DESCRIPTION
G0384-T60_5-9_SITE PLAN DETAILS.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
FINAL DESIGN
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
EXISTING CONDITIONS AND
DEMOLITION PLAN
00 20' 40'
SCALE: 1" = 20'
1" = 20'
N
SHEET 5
T 2
MATT
WZOREK
CIVIL
52674No.
10/06/2026
DANIEL S.
HOLMES
CIVIL
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
983 982
968968
967970
975980
970 975
L1
L2C1
DYH
DY
H
W
WWW
W
"LINE-NEW""LINE-BOLD"V-ENVR-TEST-PIT (TEST PIT)V-ENVR-WELL (MONITORING WELL)V-ENVR-SOIL-SAMP (SOIL SAMPLE)V-ENVR-BORE (BORING)C-ENVR-WLMTC-TOPO-WATRC-SITE-HBLEC-PLNT-TREELINE(Mirrored)C-STRM-UNDR (TRUE SIZE)C-STRM (Storm CB Type C)C-SITE-FNCEC-CBLE-UNDR (Underground Cable TV)C-FIRE-UNDER (Fire Service)C-WATR-UNDR (Water Service)C-POWR-UNDR (Underground Electric)C-COMM-UNDR (Underground Tel-Com)C-NGAS-UNDR (Underground Gas)C-WALK-BITU (Bituminous Walk)C-ROAD-SWCTC-CURB-CONC (Concrete Curb)C-CURB-BITU (Bituminous Curb)C-ROAD-STRY (Yellow Paint Line)C-BLDG (New Building)C-BLDG-PATT (Building Hatch)C-ROAD-CNTRC-ROAD-TAKE (Taking Line)C-SITE-HC-SYMBC-PLNT-TREEC-TOPO-MINRC-TOPO-MAJRC-STRM-UD (UNDERDRAIN)C-SITE-FNC2 (Wood Post)C-POWR-OVHD (Overhead Electric)C-TOPO-MAID (Contour Tag - Automated)C-ROAD-STRW (White Paint Line)C-SITE-ARRW (Painted Arrows)C-ROAD-SIGNC-SITE-POLEC-PROPC-TOPO-SPOTC-SITE-WALLC-SSWR-UNDR (Sanitary Pipes)C-SSWR-FRCE (Force Main)C-STRM (Storm CB Type C-L)C-STRM (Storm Manhole)C-CURB-GRAN (Granite Curb)C-FIRE-HYDR (C-WATR-HYDR)C-SITE-FNC3 (Chain Link)C-WALK-CONC (Concrete Walk)C-WALK-BRCK (Brick Walk)C-WALK-PATT (Brick Walk Hatch)(Sawcut Line)(Roadway Baseline)(Property Line)C-SITE-GSWL(Grass Lined Swale)C-WALK-EXSP (Expansion Joints)C-STRM-RIPR (Rip-Rap)C-STRM-PROF (STORM PIPES in PROFILE)C-STRM-FLES (Flared End-Section)C-STRM-HWLL (Head Wall)C-STRM-GABN (Gabion Wall)C-ROAD-EASE(Easement Line)(Right-of-Way Line)C-ROAD-ROWC-ANNO-STLN (Site Lines)30"24"18"15"12"36" PipeC-STRM-HWLLC-ROAD-GDRL (WIRE ROPE)C-ROAD-MBR (METAL BEAM RAIL)C-SITE-LITEC-WALK-HCRAMPC-STRM (Yard Drain)C-FIRE-HP-UNDR (High Pressure Fire Service)VORTECH UNIT 1KUNIT 2KUNIT 3KUNIT 4KUNIT 5KUNIT 7KUNIT 9KUNIT 11KUNIT 16KC-SITE-GSWL-ARROWC-SSWR-COMB (COMBINATION SEWER)C-SSWR-LOWP (LOW PRESSURE SANITARY SEWER)C-CHWTR-RTRN (CHILLED WATER RETURN)C-CHWTR-SPLY (CHILLED WATER SPLY)C-STEAM-CONDESATEC-STEAM-HP (HIGH PRESSURE STEAM)PROPOSED UTILITIESPROPOSED STORMBOUNDARY (CT)PROPOSED TOPOPROPOSED SITEC-SITE-STNWLLC-SSWR-FLOW (SEWER FLOW DIRECTION)48"60"72"144"C-SSWR (Sanitary Sewer Structure)48"60"72"84"TYPE 1CASCADETYPE A-1C-STRM (MA - Storm CB)C-STRM-UD (ROOF LEADER)C-WATR-POTABLE (Potable Water)18"15"12"24"30"36"Annotative Segment Label (Auto)SSSSDDDDC-ABAN-UTILC-DEMO-UTILGEOTECHC-ENVR-TEST-PIT (TEST PIT)C-ENVR-WELL (MONITORING WELL)C-ENVR-SOIL-SAMP (SOIL SAMPLE)"LINE-NEW""LINE-BOLD"C-ENVR-BORE (BORING)C-STEAM-MP (MEDIUM PRESSURE STEAM)C-STEAM-LP (LOW PRESSURE STEAM)C-POWR-PRME (Primary Electric)C-POWR-SCND (Secondary Electric)C-OXYG-UNDR (Underground Oxygen)C-COMM-DATA (Underground Tel-Data)C-HWTR-SPLY (HOT WATER SUPPLY)C-HWTR-RTRN (HOT WATER RETURN)C-ROAD-EDGE (Edge Of Pavement)C-NGASD84"96"SC-ROAD-PARK-METRC-WATREC-POWRTC-COMMGGGVGTC-STRM-UNDR-2 (SINGLE LINE)( Deciduous )( Evergreen )( Ornamental )( Shrub )C-SITE-BLRD (Proposed Bollard)UTILITY C0.POLE #32.0BOUNDARY (MASS)C-ROAD-TAKE-MA (Taking Line)C-ROAD-EASE-MA (Easement Line)C-TELE-UNDR (Underground Tel-Data)ONLYC-TANK-UST (UNDERGROUND STORAGE TANK)C-PROJ-LIMT (Project Limit Line)C-SITE-USPS(mailbox)(masonrymailbox)
DYHWVDYHWVWVWVSWSENENW SWSENENW
Pl ot te d
O n:
O ct
6, 6-
:1 9p m B y:
J
Ps ze ni cz ny La st S av ed
:1 0/
6/
Ti gh e
B on d:
tig he bo nd
.c om
\d at a\ D at a\
Pr oj ec ts
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_5 -9
_S
IT
E
PL
A N
D
ET
A
IL
S .d w g
MARK DATE DESCRIPTION
G0384-T60_5-9_SITE PLAN DETAILS.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
FINAL DESIGN
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
N
SITE PLAN
00 20' 40'
SCALE: 1" = 20'
1" = 20'
SHEET 6
T 2
MATT
WZOREK
CIVIL
52674No.
10/06/2026
DANIEL S.
HOLMES
CIVIL
te d
O n:
O ct
6, 6-
:1 9p m B y:
J
Ps ze ni cz ny La st S av ed
:1 0/
6/
Ti gh e
B on d:
tig he bo nd
.c om
\d at a\ D at a\
Pr oj ec ts
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_5 -9
_S
IT
E
PL
A N
D
ET
A
IL
S .d w g
MARK DATE DESCRIPTION
G0384-T60_5-9_SITE PLAN DETAILS.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
FINAL DESIGN
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
NO SCALE
SHEET 7
COIR LOG AND EROSION CONTROL SEED MIX
(SEE TABLE 2-3)
NUMBER OF COIR LOG ROWS MAY VARY
WOODEN STAKES
(2 FT. LONG)
STREAM BED
NORMAL
WATER LEVEL
TOP OF BANK/OHW
NATIVE MATERIAL
EROSION CONTROL
BARRIER
6" M
IN
SEE SEED MIX OPTIONS FOR
USE IN WETLAND MITIGATION
AREA TABLE
FINISHED GRADE
EXISTING SUBSOIL
WETLAND TOPSOIL
LIVE STAKINGS OR TUBELINGS (TYP)
(SEE TABLE 2-4)
T 2
MATT
WZOREK
CIVIL
52674No.
10/06/2026
DANIEL S.
HOLMES
CIVIL
te d
O n:
O ct
6, 6-
:1 9p m B y:
J
Ps ze ni cz ny La st S av ed
:1 0/
6/
Ti gh e
B on d:
tig he bo nd
.c om
\d at a\ D at a\
Pr oj ec ts
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_5 -9
_S
IT
E
PL
A N
D
ET
A
IL
S .d w g
MARK DATE DESCRIPTION
G0384-T60_5-9_SITE PLAN DETAILS.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
FINAL DESIGN
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
NO SCALE
SHEET 8
2"
4"
6" 2"
2"
6"
1/2"
4"
MIN.
0"
R
EV
EA
L
PAVEMENT
9" M
IN
O V
ER
A
LL
H
EI
G H
T
SUITABLE IN-SITU MATERIALOR GRAVEL BORROWCEMENT CONCRETE BASE
(3,000 PSI MIX) SET TO HMA
BASE/BINDER COURSE ELEVATION
SMOOTH QUARRY SPLIT
VERTICAL GRANITE CURBING
ELEVATIONSECTION
VERTICAL GRANITE CURBING
TRANSITION CURB
GRANITE CURB
PROPOSED BRIDGE
STRUCTURE
0"
R
EV
EA
L
VARIES
T 2
MATT
WZOREK
CIVIL
52674No.
10/06/2026
DANIEL S.
HOLMES
CIVIL
te d
O n:
O ct
6, 6-
:1 9p m B y:
J
Ps ze ni cz ny La st S av ed
:1 0/
6/
Ti gh e
B on d:
tig he bo nd
.c om
\d at a\ D at a\
Pr oj ec ts
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_5 -9
_S
IT
E
PL
A N
D
ET
A
IL
S .d w g
MARK DATE DESCRIPTION
G0384-T60_5-9_SITE PLAN DETAILS.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
FINAL DESIGN
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
NO SCALE
SHEET 8A
ELEVATION
PLAN
D
PLAN AT BENDSECTION AT TEE OR BEND
PLAN AT TEE
6" MIN. SEE NOTE 2
T 2
MATT
WZOREK
CIVIL
52674No.
10/06/2026
DANIEL S.
HOLMES
CIVIL
te d
O n:
O ct
6, 6-
:1 9p m B y:
J
Ps ze ni cz ny La st S av ed
:1 0/
6/
Ti gh e
B on d:
tig he bo nd
.c om
\d at a\ D at a\
Pr oj ec ts
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_5 -9
_S
IT
E
PL
A N
D
ET
A
IL
S .d w g
MARK DATE DESCRIPTION
G0384-T60_5-9_SITE PLAN DETAILS.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
FINAL DESIGN
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
NO SCALE
SHEET 9
WOVEN GEOTEXTILE FABRIC
WOVEN GEOTEXTILE
FABRIC
T 2
MATT
WZOREK
CIVIL
52674No.
10/06/2026
DANIEL S.
HOLMES
CIVIL
DYH
DY
H
W
Pl ot te d
O n:
O ct
6, 6-
:1 9p m B y:
J
Ps ze ni cz ny La st S av ed
:1 0/
6/
Ti gh e
B on d:
tig he bo nd
.c om
\d at a\ D at a\
Pr oj ec ts
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_5 -9
_S
IT
E
PL
A N
D
ET
A
IL
S .d w g
MARK DATE DESCRIPTION
G0384-T60_5-9_SITE PLAN DETAILS.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
FINAL DESIGN
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
TEMPORARY TRAFFIC
CONTROL PLAN
AS SHOWN
N
P/F
END ROAD
WORK
DOUBLE
FINES END
WORK ZONES
SPEEDING
FINES
DOUBLED
SPEED LIMIT (S) TAPER LENGTH (L)
FEET
POLICE
OFFICER
AHEAD
ONE LANE
ROAD
XXX
XX
M.P.H.
ONE LANE
ROAD
XXX
XX
POLICE
OFFICER
AHEAD
M.P.H.
RIGHT
SHOULDER
CLOSED
ROAD
NARROWS
SHEET 10
10 24 T 2
MATT
WZOREK
CIVIL
52674No.
10/06/2026
DANIEL S.
HOLMES
CIVIL
te d
O n:
Fe b
-1 :1
9p m
B y:
S S ak
La st
S av ed :5
/5 /2
Ti gh e
B on d:
J:
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_1 0_
B O
R
IN
G S .d w g
MARK DATE DESCRIPTION
G0384-T60_10_BORINGS.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
BORING LOGS &
BORING NOTES
NO SCALE
SHEET 11
DANIEL S.
HOLMES
CIVIL
56624No.
02/09/2023
MATT
WZOREK
CIVIL
52674No.
02/13/2023
W
W W W W W W W W W
W
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
L1
L2
C1
Pl ot te d
O n:
Fe b
-1 :1
9p m
B y:
S S ak
La st
S av ed :2
/3 /2
Ti gh e
B on d:
J:
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_1 1_
B R
ID
G E_
PL
A N
.d w g
MARK DATE DESCRIPTION
G0384-T60_11_BRIDGE_PLAN.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
GENERAL BRIDGE PLAN &
ELEVATION
1/8" = 1'-0" 00 8' 16'
SCALE: 1/8" = 1'-0"
N
SHEET 12
DANIEL S.
HOLMES
CIVIL
56624No.
02/09/2023
ANDREA
LACASSE
CIVIL
57194No.
02/13/2023
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
L2
C
D
Y H
D
YH
W
W
W
W
W W
W W
W W
W W
W
W
W
Pl ot te d
O n:
O ct
6, 6-
:2 0p m B y:
J
Ps ze ni cz ny La st S av ed
:1 0/
6/
Ti gh e
B on d:
tig he bo nd
.c om
\d at a\ D at a\
Pr oj ec ts
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_1 2_
S
TA
G E1
.d w g
MARK DATE DESCRIPTION
G0384-T60_12_STAGE1.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
FINAL DESIGN
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
POTENTIAL CONSTRUCTION
STAGE 1 PLAN & SECTION
1/8" = 1'-0" 00 8' 16'
SCALE: 1/8" = 1'-0"
N
SHEET 13
13 24
T 2
MATT
WZOREK
CIVIL
52674No.
10/06/2026
DANIEL S.
HOLMES
CIVIL
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
L2
C
D
Y H
D
YH
W
W
W
W W
W W
W W
W W
W
W W
W
W
W
W
W W
W W
W W
W W
W
W
Pl ot te d
O n:
O ct
6, 6-
:3 3p m B y:
J
Ps ze ni cz ny La st S av ed
:1 0/
6/
Ti gh e
B on d:
tig he bo nd
.c om
\d at a\ D at a\
Pr oj ec ts
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_1 3_
S
TA
G E2
.d w g
MARK DATE DESCRIPTION
G0384-T60_13_STAGE2.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
FINAL DESIGN
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
POTENTIAL CONSTRUCTION
STAGE 2 PLAN & SECTION
1/8" = 1'-0" 00 8' 16'
SCALE: 1/8" = 1'-0"
N
SHEET 14
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
T 2
MATT
WZOREK
CIVIL
52674No.
10/06/2026
DANIEL S.
HOLMES
CIVIL
te d
O n:
Fe b
-1 :2
0p m
B y:
S S ak
La st
S av ed :2
/3 /2
Ti gh e
B on d:
J:
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_1 4_
B R
ID
G E_
S
EC
TI
O
N S .d w g
MARK DATE DESCRIPTION
G0384-T60_14_BRIDGE_SECTIONS.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
BRIDGE SECTIONS
& DETAILS
AS SHOWN
00 2' 4'
SCALE: 1/2" = 1'-0"
SHEET 15
DANIEL S.
HOLMES
CIVIL
56624No.
02/09/2023
ANDREA
LACASSE
CIVIL
57194No.
02/13/2023 te d
O n:
Fe b
-1 :2
1p m
B y:
S S ak
La st
S av ed :8
/3 /2
Ti gh e
B on d:
J:
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_1 5_
A B U
TM
EN
TS
.d w g
MARK DATE DESCRIPTION
G0384-T60_15_ABUTMENTS.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
FOUNDATION PLAN
& DETAILS
AS SHOWN
00 4' 8'
SCALE: 1/4" = 1'-0"
N
SHEET 16
STAINLESS STEEL
SHIMS (M8.05.0)
45° BEVEL (TYP)
NON-SHRINK
GROUT (M4.04.0)
ALL AROUND WALL
2'-6"
1'-6"
3" (TYP)
3"
1"±
KEYWAY DETAIL
1" = 1'-0"
DANIEL S.
HOLMES
CIVIL
56624No.
02/09/2023
ANDREA
LACASSE
CIVIL
57194No.
02/13/2023
W W W W W W W W W W W W W W W W
W
W
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
Pl ot te d
O n:
Fe b
-1 :2
2p m
B y:
S S ak
La st
S av ed :6
/6 /2
Ti gh e
B on d:
J:
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_1 6_
W
IN
G W
A
LL
S .d w g
MARK DATE DESCRIPTION
G0384-T60_16_WINGWALLS.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
WINGWALL PLAN &
ELEVATION
1/4" = 1'-0" 00 4' 8'
SCALE: 1/4" = 1'-0"
N
SHEET 17
DANIEL S.
HOLMES
CIVIL
56624No.
02/09/2023
ANDREA
LACASSE
CIVIL
57194No.
02/13/2023
OR STRUCTURE
ot te d
O n:
Fe b
-1 :2
2p m
B y:
S S ak
La st
S av ed :5
/5 /2
Ti gh e
B on d:
J:
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_1 7-
_G
U A R D
R A
IL
.d w g
MARK DATE DESCRIPTION
G0384-T60_17-18_GUARDRAIL.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
HIGHWAY GUARDRAIL
DETAILS (SHEET 1 OF 2)
AS SHOWN
MASSDOT STANDARD DETAILS:
MASSDOT HIGHWAY DIVISION
CONSTRUCTION STANDARD DETAILS
GUARDRAIL, TL2 & W-BEAM PANEL DETAILS SHEET 18
DANIEL S.
HOLMES
CIVIL
56624No.
02/09/2023
MATT
WZOREK
CIVIL
52674No.
02/13/2023 te d
O n:
Fe b
-1 :2
2p m
B y:
S S ak
La st
S av ed :5
/5 /2
Ti gh e
B on d:
J:
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_1 7-
_G
U A R D
R A
IL
.d w g
MARK DATE DESCRIPTION
G0384-T60_17-18_GUARDRAIL.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
HIGHWAY GUARDRAIL
DETAILS (SHEET 2 OF 2)
AS SHOWN
MASSDOT STANDARD DETAILS:
MASSDOT HIGHWAY DIVISION
CONSTRUCTION STANDARD DETAILS
GUARDRAIL, TL2 & W-BEAM PANEL DETAILS SHEET 19
DANIEL S.
HOLMES
CIVIL
56624No.
02/09/2023
MATT
WZOREK
CIVIL
52674No.
02/13/2023 te d
O n:
Fe b
-1 :2
2p m
B y:
S S ak
La st
S av ed :8
/3 /2
Ti gh e
B on d:
J:
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_1 9_
B R
ID
G E_
R A
IL
IN
G
.d w g
MARK DATE DESCRIPTION
G0384-T60_19_BRIDGE_RAILING.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
MASSDOT STANDARD DETAILS:
MASSDOT 2013 LRFD BRIDGE MANUAL
PART II CONVENTIONAL CONSTRUCTION
CT-TL2 BRIDGE RAILING
CT-TL2 BRIDGE RAILING
AS SHOWN
SHEET 20
DANIEL S.
HOLMES
CIVIL
56624No.
02/09/2023
ANDREA
LACASSE
CIVIL
57194No.
02/13/2023 te d
O n:
Fe b
-1 :2
3p m
B y:
S S ak
La st
S av ed :5
/5 /2
Ti gh e
B on d:
J:
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_2 0_
G U
A R D
R A
IL
_T R A N
S
IT
IO
N
.d w g
MARK DATE DESCRIPTION
G0384-T60_20_GUARDRAIL_TRANSITION.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
TOP OF PRECAST HIGHWAY
GUARDRAIL TRANSITION FOR
CT-TL2 RAILING
MASSDOT STANDARD DETAILS:
MASSDOT 2013 LRFD BRIDGE MANUAL
PART II CONVENTIONAL CONSTRUCTION
CT-TL2 BRIDGE RAILING AND PRECAST
GUARDRAIL TRANSITION DETAILS
AS SHOWN
SHEET 21
DANIEL S.
HOLMES
CIVIL
56624No.
02/09/2023
ANDREA
LACASSE
CIVIL
57194No.
02/13/2023 te d
O n:
Fe b
-1 :2
3p m
B y:
S S ak
La st
S av ed :5
/5 /2
Ti gh e
B on d:
J:
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_2 1_
PR
EC
A S T.
dw g
MARK DATE DESCRIPTION
G0384-T60_21_PRECAST.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
MASSDOT STANDARD DETAILS:
MASSDOT 2013 LRFD BRIDGE MANUAL
PART II CONVENTIONAL CONSTRUCTION
CT-TL2 BRIDGE RAILING AND PRECAST
GUARDRAIL TRANSITION DETAILS
SECTION 1
-1/2" = 1'-0"
SECTION 2
-1/2" = 1'-0"
PRECAST GUARDRAIL
TRANSITION AND CT-TL2
BRIDGE RAILING DETAILS
AS SHOWN
SHEET 22
DANIEL S.
HOLMES
CIVIL
56624No.
02/09/2023
ANDREA
LACASSE
CIVIL
57194No.
02/13/2023 te d
O n:
Fe b
-1 :2
3p m
B y:
S S ak
La st
S av ed :5
/5 /2
Ti gh e
B on d:
J:
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_2 2_
G U
A R D
_T R A N
S
IT
IO
N
.d w g
MARK DATE DESCRIPTION
G0384-T60_22_GUARD_TRANSITION.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
MASSDOT STANDARD DETAILS:
MASSDOT 2017 CONSTRUCTION STANDARD
DETAILS, 400.3.6
GUARDRAIL TRANSITION TO
BRIDGE RAIL (FACE OF CURB)
NO SCALE
SHEET 23
DANIEL S.
HOLMES
CIVIL
56624No.
02/09/2023
MATT
WZOREK
CIVIL
52674No.
02/13/2023 te d
O n:
Fe b
-1 :2
3p m
B y:
S S ak
La st
S av ed :5
/5 /2
Ti gh e
B on d:
J:
\G \G
G ar dn er
\T
K ey es
R oa d C ul ve rt
R ep la ce m en t\ D ra w in gs
_F ig ur es
\A ut oC A D
\S he et \C ur rr en t
D ra w in gs \G
-T
_2 3_
G U
A R D
_G
EO
M .d w g
MARK DATE DESCRIPTION
G0384-T60_23_GUARD_GEOM.dwg
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
DATE:
APPROVED BY:
PROJECT NO:
FEBRUARY 2023
G0384-060
SCALE:
SDS, RMC
AGB, MPW, AML, JRI
DSH
SHEET OF 24
Gardner, Massachusetts
Keyes Road Over Wilder Brook Culvert Replacement
City of Gardner
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
MassDOT Bridge No.
G-01-025, BIN CD5
MASSDOT STANDARD DETAILS:
MASSDOT 2017 CONSTRUCTION STANDARD
DETAILS, 400.3.6
GUARDRAIL APPROACH
GEOMETRY
NO SCALE
SHEET 24
DANIEL S.
HOLMES
CIVIL
56624No.
02/09/2023
MATT
WZOREK
CIVIL
52674No.
02/13/2023
| Sheets and Views |
| G0384-T60_1_COVER-COVER |
| Unsaved Drawing1-SHEET05 |
| Unsaved Drawing1-SHEET06 |
| Unsaved Drawing1-SHEET07 |
| Unsaved Drawing1-SHEET 8 |
| Unsaved Drawing1-SHEET 8A |
| Unsaved Drawing1-SHEET08 |
| Unsaved Drawing1-SHEET09 |
| Unsaved Drawing2-SHEET12 |
| Unsaved Drawing3-SHEET13 |
File details come from the government source that posted it. Updated .