This Addendum No. 3 is an amendment to bidding documents for the Keyes Road Over Wilder Brook Culvert Replacement Project issued by the City of Gardner, Massachusetts on October 29, 2026 under IFB 2027-011. The addendum modifies the project manual and construction drawings, including updates to the Form for General Bid (Section 00410), Division 2 Special Provisions, and multiple construction detail sheets. The project involves replacing an existing culvert with a new bridge structure (Bridge No. G-01-025 CD5), requiring demolition of the existing culvert, excavation work, installation of water infrastructure including 12-inch ductile iron water pipe and hydrants, pavement work, erosion control, and traffic management. Key bid items include earth excavation (800 cubic yards), bridge excavation (1,500 cubic yards), water pipe installation (130 linear feet), pavement fine milling (150 square yards), hot mix asphalt work, guardrail installation, mailbox and sign relocation, and bridge structure work. The addendum clarifies thirteen bid period questions addressing bid item specifications, quantity corrections, material requirements, and technical specifications.

The addendum establishes a total bid including monthly price adjustments for materials such as HMA mixtures, diesel fuel, gasoline, Portland cement, and steel, each with $1,000.00 allowances, plus a $25,000.00 utility pole relocation allowance. Mobilization is capped at 3 percent of total bid amount, and traffic police costs are set at $35,000.00. No minority or women-owned business enterprise (MBE/WBE) participation requirements apply to this project, as indicated by the removal of reference to MBE/WBE participation forms from the bid document. The project requires flood insurance on the builder's risk policy and mandates that all employees complete a minimum ten-hour OSHA-approved construction safety and health course before beginning work. Bidders must acknowledge receipt of all addenda on the bid form and submit bid deposits consisting of 5-percent bid bonds with evidence of authority, project references, and state licensing qualifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A3-1

Addendum No. 3

Keyes Road Over Wilder Brook Culvert Replacement Project

Gardner, MA

Addendum No. 3 to the Bidding Documents

Keyes Road Over Wilder Brook Culvert Replacement Project City of Gardner

Gardner, MA 01440

Issued October 29, 2026

Under the provisions of Article 11 of Section 00112, Information for Bidders, Bidders are informed that the Bidding Documents for the above mentioned Project are modified, corrected, and/or supplemented as follows. Addendum No. 3 becomes part of the Bidding Documents and Contract Documents.

Acknowledge receipt of this addendum by inserting its number on Page 00410-12, Article 5.2 of the Bid form.

Failure to acknowledge receipt of the Addendum may subject the Bidder to disqualification.

Project Manual Changes

Item 3-1 Section 00410 – Form for General Bid

Delete the Section 00410 – Form for General Bid in its entirety and replace with the attached 00410

– Form for General Bid.

Item 3-2 Division 2 – Special Provisions

Delete Division 2 – Special Provisions in its entirety and replace with the attached Division 2 – Special Provisions.

Drawing Changes

Item 3-3 Sheet 6 of 25 – Site Plan

Delete the Sheet 6 – Site Plan in its entirety and replace with the attached Sheet 6 – Site Plan.

Item 3-4 Sheet 8 of 25 – Construction Details

Delete the Sheet 8 – Construction Details in its entirety and replace with the attached Sheet 8 – Construction Details.

Item 3-5 Sheet 10 of 25 – Temporary Traffic Control Plan

Delete the Sheet 10 – Temporary Traffic Control Plan in its entirety and replace with the attached Sheet 10 – Temporary Traffic Control Plan.

A3-2

Gardner, MA

Item 3-6 Sheet 13 of 25 – Potential Construction Stage 1 Plan & Section

Delete the Sheet 13 – Potential Construction Stage 1 Plan & Section in its entirety and replace with the attached Sheet 13 – Potential Construction Stage 1 Plan & Section.

Item 3-7 Sheet 14 of 25 – Potential Construction Stage 2 Plan & Section

Delete the Sheet 14 – Potential Construction Stage 2 Plan & Section in its entirety and replace with the attached Sheet 14 – Potential Construction Stage 2 Plan & Section.

Clarifications:

Item 3-8 The project received Chapter 85 approval in 2023, and the Chapter 85 approval stamp was intended to be preserved on the 2026 bid plans. Reference the latest MassDOT standard details and specifications where discrepancies exist.

Bid Period Questions:

1. The special provisions, SP-59-60, lists item 998.5 as the monthly price adjustment for steel. On the bid form, item 998.5 is listed as utility pole relocation and there is no bid item for the monthly price adjustment for steel. Please clarify.

Attached Bid Form has been updated to include an allowance for the monthly price adjustment for steel.

2. The bid quantity for item 415.2, Pavement Fine Milling is 75 SY. Measured off the plans, the area is closer to 150 SY. Please check the quantity for this bid item.

Quantity for item 415.2 has been updated in the attached bid form.

3. Should there be a separate bid item for Remove & Replace Mailbox? If not, under which bid item should this be included?

Additional bid items have been included for the removal and resetting of the mailbox and sign on the attached bid form. Refer to the attached special provisions for the removal and resetting of the Mailbox.

4. Drawing sheet 15 shows crushed stone for bridge foundations wrapped in geotextile fabric for permanent erosion control at the Longitudinal Section for the Culvert. There is no bid item for the crushed stone for bridge foundations or for the geotextile fabric for permanent erosion control. Should there be separate bid items for these? If not, where should these be included?

Please refer to attached bid form, crushed stone for bridge excavation is under bid item 156.1. Refer to the attached special provisions for bid item 156.1 requirements.

5. Sheet 15 shows the concrete corbel as precast. Under which sub-bid item for the bridge should these be included?

The precast concrete corbels shall be incidental to Item 995.01 Bridge Structure, Bridge No. G-01-025 (CD5) and should be included in the Lump Sum cost of this item.

A3-3

Gardner, MA

6. What is the thickness of the asphalt sidewalk?

Attached sheet 8 updates pavement in sidewalk section to 1.25” of 9.5 SSC over 1.75” of 12.5 SSC.

Sidewalk asphalt shall be paid under bid item 702.

7. Where is bid item 402, Dense Graded Crushed stone for sub-base being used? The Keyes Road

Typical Section only shows Gravel Borrow as the pavement base.

Please refer to the attached bid form, item 402. is not required.

8. Can you please review the quantities for bid items 120.1, Unclassified Excavation and 140, Bridge

Excavation? I am coming up with close to double the volume of excavation for each of these items.

The quantity for items 120 and 140 have been updated in the attached bid form.

9. I do not see any MBE/WBE requirements in the specifications however in Article 7 of the Bid Form it mentions MBE/WBE participation forms that are “attached to and made a condition of this Bid”, but there are no participation forms in the specs. We assume they are not necessary?

Reference on the bid form to M/WBE participation forms has been removed. No M/WBE participation goals are included for this project.

10. Note 8 on plan sheet 4 states that waterproof membrane shall be provided over the structure across the entire roadway width. This would be about 1,400 SF of waterproofing. Is this a spray applied membrane? Should there be an additional sub-bid item for this?

Sheet membrane waterproofing shall be incidental to Item 995.01 Bridge Structure, Bridge No. G-01- 025 (CD5) and should be included in the Lump Sum cost of this item. The membrane waterproofing applied to the structure in all instances shall be sheet membrane waterproofing as indicated in the special provisions.

11. Do we need to carry Flood insurance for this project?

Flood insurance will be required for this project and shall be listed on the builder’s risk policy.

12. Could you please specify the type of PTS signal referenced in the special provisions? Is the requirement for a stand-alone Portable Traffic Signal or a Residential Driveway Assistance Device?

The requirement is for a stand-alone portable traffic signal.

13. What is the purpose of the precast Corbel if there is no approach slabs on the project?

The precast corbel is proposed to provide vertical support for the headwalls and bridge railing past the end of the rigid frame. Due to the skew of the bridge and the proposed use of pedestal foundations, the highway guardrail transition cannot be constructed flush against the leg of the rigid frame and headwall without an extension past the rigid frame. The precast corbel is not proposed across the entire width of the rigid frame, rather it is proposed only under the headwalls.

END OF ADDENDUM NO. 3

J:\G\G0384 Gardner\T60 - Keyes Road Culvert Replacement\Bidding\Addenda\Addendum #3\G-0384-T60 Addendum #3.docx

G-0384-060 _10/29/26 00410-1 Form for General Bid

SECTION 00410

FORM FOR GENERAL BID

PROJECT IDENTIFICATION:

Keyes Road Over Wilder Brook Culvert Replacement

IFB 2027-011

TABLE OF ARTICLES

1. Bid Recipient

2. Bidder’s Acknowledgements

3. Bidder’s Representations

4. Bidder’s Certifications

5. Basis of Bid

6. Time of Completion

7. Attachments to This Bid

8. Bid Submittal

ARTICLE 1 BID RECIPIENT

1.1 This Bid is submitted to:

City of Gardner

Purchasing Agent

95 Pleasant Street - Room 217

Gardner, Massachusetts 01440

1.2 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2 BIDDER’S ACKNOWLEDGEMENTS

2.1 Bidder accepts all of the terms and conditions of the Advertisement for Bids and Instructions to

Bidders, including without limitation, those dealing with the disposition of Bid deposit. The Bid will remain subject to acceptance for 30 days after the bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.

2.2 The Work under this Contract shall be subject to the provisions of Chapter 30, Section 39M of the Massachusetts General Laws.

ARTICLE 3 BIDDER’S REPRESENTATIONS

G-0384-060 _10/29/26 00410-2 Form for General Bid

3.1 In submitting this Bid, Bidder represents, as set forth in the Agreement, that:

A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents and hereby acknowledges the receipt of all Addenda.

B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local and

Site conditions that may affect cost, progress, and performance of the Work.

C. Bidder is familiar with and has satisfied itself as to all federal, state and local Laws and

Regulations that may affect cost, progress and performance of the Work.

D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the

Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings.

E. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs.

F. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required and in accordance with the other terms and conditions of the Bidding Documents.

G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.

H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and confirms that the written resolution thereof by Engineer is acceptable to Bidder.

I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work.

J. The submission of this Bid constitutes an incontrovertible representation by Bidder that

Bidder has complied with every requirement of this Article, and that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

K. Bidder is aware that the estimated quantities on the Bid form are subject to Article 13.03 of the General Conditions (Section 00700).

G-0384-060 _10/29/26 00410-3 Form for General Bid

ARTICLE 4 BIDDER’S CERTIFICATION

4.1 Bidder hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed in the work, that all employees to be employed at the Site will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee, and that Bidder will comply fully with all laws and regulations applicable to awards made subject to MGL Chapter 30, Section 39M.

4.2 Bidder certifies that, under penalty of perjury, Bidder is not presently debarred from doing public construction work in the Commonwealth under the provisions of MGL Chapter 29, Section 29F or any other applicable debarment provisions of any other chapter of the General

Laws or any rule or regulation promulgated thereunder; and is not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency.

4.3 Bidder hereby certifies under the penalties of perjury, to the best of Bidder’s knowledge and belief, that Bidder has filed all State tax returns and paid all State taxes required by law.

4.4 Bidder certifies under penalties of perjury that this Bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used herein the word “person” shall mean any natural person, joint venture, partnership, corporation or other business or legal entity.

4.5 Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;

4.6 Bidder certifies that Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;

4.7 Bidder certifies that Bidder has not solicited or induced any individual or entity to refrain from bidding; and

4.8 Bidder certifies that Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this paragraph:

A. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;

B. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of the Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;

C. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and

D. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.

G-0384-060 _10/29/26 00410-4 Form for General Bid

ARTICLE 5 BASIS OF BID

5.1 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):

G-0384-060 _10/29/26 00410-5 Form for General Bid

Item

Number

Item Name and Unit Bid Prices

Written in Words and Figures

Estimated Quantity Total Amount of Item

(in figures)

101. Clearing and Grubbing, per acre, the price of:

x 0.3 A =

113.1 Demolition of Culvert No 1., per lump sum, the

price of:

lump sum =

120. Earth Excavation, per cubic yard, the price of:

x 800 c.y. =

140 Bridge Excavation, per cubic yard, the price of:

x 1500 c.y. =

144 Class B Rock Excavation, per cubic yard, the price of:

x 25 c.y. =

150 Ordinary Borrow, per cubic yard, the price of:

x 100 c.y. =

151 Gravel Borrow, per cubic yard, the price of:

x 300 c.y. =

151.2 Gravel Borrow for Backfilling Structures and

Pipes, per cubic yard, the price of:

x 700 c.y. =

G-0384-060 _10/29/26 00410-6 Form for General Bid

156.1 Crushed Stone for Bridge Foundation, per ton, the

x 260 ton =

170 Fine Grading and Compacting – Subgrade Area, per square yard, the price of:

x 900 s.y. =

302.12 12-inch Ductile Iron Water Pipe (rubber gasket) per linear foot, the price of:

x 130 l.f. =

345.61 6-inch Temporary Service Pipe, per lump sum, the

350.12 12-inch Gate and Gate Box, each, the price of:

x 2 each =

373.12 12-Inch Water Pipe Insulation, per linear foot, the x 70 l.f. =

376 Hydrant Assembly, each, the price of:

x 2 each =

G-0384-060 _10/29/26 00410-7 Form for General Bid

415.2 Pavement Fine Milling, per square yard, the price

x 150 s.y. =

440 Calcium Chloride for Roadway Dust Control, per pound, the price of:

x 1350 lb =

450.23 Superpave Surface Course – 12.5 (SSC- 12.5), per

ton, the price of:

x 100 ton =

450.32 Superpave Intermediate Course – 19.0 (SIC –

19.0), per ton, the price of:

x 150 ton =

452 Asphalt Emulsion for Tack Coat, per gallon, the x 60 gal =

453 HMA Joint Adhesive, per linear foot, the price of:

x 950 l.f. =

472 Temporary Asphalt Patching, per ton, the price of:

x 165 ton =

482.3 Sawcutting Asphalt Pavement, per linear foot, the

x l50 l.f. =

G-0384-060 _10/29/26 00410-8 Form for General Bid

504 Granite Curb Type VA4, per linear foot, the price x 40 l.f. =

570.2 Hot Mix Asphalt Curb – Type 2, per linear foot, the price of:

x 200 l.f. =

627.82 Guardrail Tangent End Treatment TL-2, each, the

x 4 each =

628.24 Transition to Bridge Rail, each, the price of:

x 4 each =

702 Hot Mix Asphalt Sidewalk or Driveway, per ton, x 15 ton =

715 Rural Mailbox Removed and Reset, each, the price x 1 each =

734 Sign Removed and Reset, each, the price of:

G-0384-060 _10/29/26 00410-9 Form for General Bid

748 Mobilization, per lump sum, the price of:

*not to exceed 3% of total bid amount

*lump sum =

751 Loam for Road Sides, per cubic yard, the price of:

x 150 c.y. =

765 Seeding, per square yard, the price of:

x 1000 s.y. =

767.121 Sediment Control Barrier, per linear foot, the price

x 300 l.f. =

769 Pavement Milling Mulch Under Guardrail, per linear foot, the price of:

x 260 l.f. =

816.81 Temporary Traffic Control Signal, per lump sum, 850 Traffic Controls for Construction Operations, per lump sum, the price of:

G-0384-060 _10/29/26 00410-10 Form for General Bid

880. Traffic Police for Construction Operations, the

Thirty-Five Thousand Dollars and Zero Cents

($35,000.00 )

Allowance =

$35,000.00_________

953.1 Temporary Support of Excavation, per lump sum,

983. Dumped Riprap, per ton, the price of:

x 270 ton =

983.4 Streambed Material, per cubic yard, the price of:

x 200 c.y. =

986. Modified Rockfill, per ton, the price of:

x 250 ton =

991.1 Control of Water- Structure No G-01-025 (CD5), per lump sum, the price of:

995.01 Bridge Structure – Bridge No G-01-025 (CD5), each, the price of:

G-0384-060 _10/29/26 00410-11 Form for General Bid

998.1 Monthly Price Adjustment for HMA Mixtures, the

One Thousand Dollars and Zero Cents

($1,000.00 )

$1,000.00__________

998.2 Monthly Price Adjustment for Diesel Fuel, the

998.3 Monthly Price Adjustment for Gasoline, the price

998.4 Monthly Price Adjustment for Portland Cement,

998.5 Monthly Price Adjustment for Steel, the price of:

998.6 Utility Pole Relocation, allowance, the price of:

Twenty-Five Thousand Dollars and Zero Cents

($25,000.00 ) allowance =

$25,000.00_________

TOTAL AMOUNT OF BID – Items 101 through 998.6 dollars

(words)

(figures)

5.2 This Bid includes Addenda numbered .

G-0384-060 _10/29/26 00410-12 Form for General Bid

ARTICLE 6 TIME OF COMPLETION

6.1 Bidder agrees that the Work will be substantially completed and ready for final payment in accordance with paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.

6.2 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times as stated in the Agreement.

ARTICLE 7 ATTACHMENTS TO THIS BID

7.1 The following documents are attached to and made a condition of this Bid:

A. Bid deposit in the amount of dollars ($ ), consisting of a bid bond in the amount of five percent of the total amount of Bid

B. Evidence of authority to sign

C. List of Project References

D. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such license within the time for acceptance of Bids

E. Evidence of Bidder's qualifications in accordance with Article 3 of Section 00112 –

Information for Bidders

F. City of Gardner Department of Community Development and Planning “Qualification

Statement”

G-0384-060 _10/29/26 00410-13 Form for General Bid

ARTICLE 8 BID SUBMITTAL

BIDDER: [Indicate correct name of bidding entity]

By:

[Signature]

[Printed name]

(If Bidder is a corporation, a limited liability company, a partnership, or a joint venture, attach evidence of authority to sign.)

Attest:

[Signature]

[Printed name]

Title:

Submittal Date:

Address for giving notices:

Telephone Number:

Fax Number:

Contact Name and e-mail address:

Bidder’s License No.:

(where applicable)

END OF SECTION

\\TIGHEBOND.COM\DATA\DATA\PROJECTS\G\G0384 GARDNER\T60 - KEYES ROAD CULVERT REPLACEMENT\DESIGN\SPECIFICATIONS\DIVISION

0\00410 - FORM FOR GENERAL BID.DOCX

G0384-060/09/16/26 SP-1 Special Provisions

SPECIAL PROVISIONS

CITY OF GARDNER

DEPARTMENT OF COMMUNITY DEVELOPMENT AND PLANNING

CULVERT REPLACEMENT

KEYES ROAD OVER WILDER BROOK

SCOPE OF WORK

All work under this Contract shall be done in conformance with the 2026 Standard Specifications for Highways and

Bridges, the Construction Standard Details in effect as of January 2026, the 1990 Standard Drawings for Signs and

Supports, the 2015 Overhead Signal Structure and Foundation Standard Drawings, the 11th Edition of the Manual on Uniform Traffic Control Devices (MUTCD) and the January 2026 Massachusetts Amendments to the MUTCD, the 1968 Standard Drawings for Traffic Signals and Highway Lighting, the latest edition of The American Standard for Nursery Stock, the Plans and these Special Provisions.

All Massachusetts Department of Transportation (MassDOT) documents can be found online at:

https://www.mass.gov/massdot-highway-division-manuals-and-publications

DISPOSAL OF SURPLUS MATERIALS

Surplus material obtained from any type of excavation, and not needed for further use as determined by the Engineer shall become the property of the Contractor and shall be removed from the site during the construction period and disposed of legally. The removal and disposal of surplus material shall adhere to the regulations and requirements of local authorities governing the disposal of such materials, at no additional compensation. Suitable materials obtained from other work items shall be incorporated into the work as fill material at appropriate locations as determined by the Engineer. Suitable materials from other work items will not be measured for payment under appropriate fill items.

MATERIAL REMOVED AND STACKED

The Contractor shall carefully remove, transport and stack all material that, in the opinion of the Engineer or Owner is salvageable. The material shall be stacked at the Department of Public Works yard. The Contractor shall coordinate with the City of Gardner to schedule drop-off time.

DRAINAGE

It shall be the Contractor's responsibility to maintain drainage functioning properly in the areas under construction prior to the time when the final system is put into use. All pipes and structures within the limits of this Contract shall be left in a clean and operable condition at the completion of the work. All work shall be included under the relevant drainage items without additional compensation. Any adjustments made to new drainage structures will be included under the Contract unit price for each respective structure.

https://www.mass.gov/massdot-highway-division-manuals-and-publications

G0384-060/09/16/26 SP-2 Special Provisions

BORROW MATERIAL TESTING

In accordance with MassDOT requirements and the following:

Contractor shall provide representative samples of borrow materials taken from the source. Tag, label, and package the Samples as requested by Engineer. Provide access to the borrow site for field evaluation and inspection.

Provide sieve analysis (ASTM C136) from certified soils testing laboratory for all borrow materials. Take and test a sample, at no additional cost to the Owner for each 500 CY of borrow material placed. The Engineer reserves the right to require more frequent testing than that which is specified above should the borrow characteristics change.

Contractor shall provide modified proctor analysis (ASTM D1557) and soil classification (ASTM D2487) from certified soils testing laboratory for all borrow or backfill materials at the frequency specified above at no additional cost to the Owner.

COMPACTION TESTING

In accordance with MassDOT requirements and the following:

Contractor shall provide compaction test results (i.e. ASTM D6938 or ASTM D1556) at a frequency of one test for every 100 cubic yards of material backfilled or at a minimum of one test per lift. The Engineer will determine the locations and lifts to be tested. Additional compaction testing may be required when there is evidence of a change in the quality of moisture control or the effectiveness of compaction.

EROSION/SEDIMENTATION CONTROL

All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the Contractor or his/her designee shall inspect the erosion controls daily and shall remove accumulated sediments as needed. The Contractor shall immediately control any erosion problems that occur at the site and shall also immediately notify the Engineer who reserves the right to require additional erosion and/or damage prevention controls s/he may deem necessary.

DIVISION 0 AND DIVISION 1 WORK INCIDENTAL TO THE CONTRACT PRICE

As noted in Section 01270, no separate measurement or payment will be made for Work called for in Division 0 or

Division 1 of the Project Manual, unless specifically covered under a Bid item in the Contract. All costs associated with this Work will be considered incidental to the Contract Bid price. This includes but not limited to testing, construction facilities, site security, and field engineering.

G0384-060/09/16/26 SP-3 Special Provisions

ITEM 113.1 DEMOLITION OF CULVERT NO. 1 LUMP SUM

The work under this Item shall conform to the applicable provisions of Subsection 112 of the Standard

Specifications and the following:

GENERAL

The work under this Item includes furnishing all labor, materials, equipment and tools necessary to perform the removal and satisfactory disposal of the entire existing structure as shown on the plans and/or as directed by the Engineer. All materials and debris shall become the property of the Contractor and shall be properly disposed of from the work site.

The existing structure is defined as all culvert elements at the crossing including, but not limited to corrugated metal pipes, stone headwalls, asphalt wearing surface, and any other miscellaneous material incidental to structure demolition.

The City does not guarantee or represent that the structure materials will actually coincide with any descriptions contained herein or represented on drawings. The Contractor must visit the culvert site prior to submitting bids to get familiar with the scope of work and culvert condition.

No additional compensation, other than the LUMP SUM price bid for this Item, shall be made if the materials or work provided is different than that inferred or described herein or shown in the drawings.

Demolition of the existing structure shall be performed in phases as shown on the Drawings to maintain traffic on the portion of the existing structure designated to remain in service. The Contractor shall plan and sequence demolition operations such that the portion of the existing structure remaining in service is continuously maintained in a stable and safe condition and is not damaged or undermined by demolition or construction activities. The Contractor shall provide all temporary supports, bracing, protection, and other measures necessary to maintain the structural integrity of the portion of the existing structure carrying traffic throughout each phase of construction.

The Contractor’s demolition method shall take into account any utilities and drainage structures near the culvert. Work under this Item may not commence until the Engineer has given written approval. The

Contractor shall be solely responsible for maintaining the stability of the existing structure at all times during the demolition and construction operations. Damage to portions of the existing structure designated to remain in service resulting from the Contractor’s operations shall be repaired or replaced to the satisfaction of the

Engineer at no additional cost to the Owner.

G0384-060/09/16/26 SP-4 Special Provisions

SUBMITTALS

The Contractor shall prepare and submit a plan indicating their proposed method of demolition including equipment, tools, devices, shielding design, etc. The demolition procedure and any necessary calculations and drawings shall bear the stamp of a Professional Engineer registered in the Commonwealth of

Massachusetts certifying that all existing structural members are suitably braced and supported throughout the demolition process. Work shall not commence until the Engineer has given written approval of the method of demolition.

CONSTRUCTION METHODS

During the prosecution of this work, the Engineer may reject the use of any method or equipment that causes undue vibration or possible damage to the surrounding area. The noise and dust created by demolition operations must be reduced to the maximum extent possible. Blasting will not be allowed without written permission from the City. The Contractor shall note that it is very unlikely that permission for blasting will be granted.

No demolition work shall be started until any and all utility companies involved have been notified (not less than seven (7) days prior to the start of demolition) and the Contractor has received approval from the

Engineer as to the equipment, procedures and schedule of operation to be used during the demolition and reconstruction periods. The Contractor shall carry on his work concurrently and in conjunction with the utility companies involved at the project site, so as to provide for all possible cooperation toward the satisfactory completion of the work with a minimum of delay and inconvenience. The Contractor shall be responsible for protecting any existing utility lines during his operations. If any utilities are damaged due to the Contractor's negligence, the Contractor shall make repairs at his/her own expense.

The Contractor shall make adequate provisions to prevent any debris, tools or incidental items from falling into the waterway below or onto areas where vehicular or pedestrian traffic exist. Such provisions shall provide for the protection of traffic, private property and pedestrians from damage and injury during all phases of the demolition process.

METHOD OF MEASUREMENT AND BASIS OF PAYMENT

Payment for this Item shall be at the contract lump sum bid price for Items 113.1, Demolition of Culvert

No. 1, which price shall include all materials, tools, equipment, disposal and labor incidental thereto that is required to complete the work in a satisfactory manner.

G0384-060/09/16/26 SP-5 Special Provisions

ITEM 156,1 CRUSHED STONE FOR BRIDGE FOUNDATION TON

The work under this item shall conform to the relevant provisions of Section 150 of the Standard specifications and the following:

METHOD OF MEASUREMENT

Crushed stone for bridge foundation will be measured and paid for per ton, complete in place. Only crushed stone installed as directed by the Engineer shall be measured for payment under Item 156.1. Any additional crushed stone shall be considered inclusive to other items and will not be measured for payment under Item

156.1.

BASIS OF PAYMENT

Crushed stone for bridge foundation will be measured and paid for at the Contract unit price per ton, which price shall include all labor, materials, equipment, and incidental costs required to complete the work.

No separate payment will be made for excavation (excluding rock), crushed stone, or geotextile fabric, but all costs in connection therewith shall be included in the Contract unit price bid.

Rock excavation shall be measured and paid for separately under Class B Rock Excavation, Item 144.

G0384-060/09/16/26 SP-6 Special Provisions

ITEM 302.12 12-INCH DUCTILE IRON WATER PIPE (RUBBER GASKET) FOOT

ITEM 350.12 12-INCH GATE AND GATE BOX EACH

ITEM 373.12 12-INCH WATER PIPE INSULATION FOOT

Work performed under these items shall conform to the relevant provisions of Section 300 and the following:

MATERIALS

Ductile Iron Pipe

Ductile iron pipe shall be designed in accordance with AWWA C150 and shall be manufactured in accordance with

AWWA C151. Fittings and other materials referenced in this section shall conform to the latest edition of the references listed in Paragraph 1.2 of this section.

Unless otherwise indicated or specified in the Contract Documents, buried ductile iron pipe and fittings shall be Class

52 with push-on joints and a cement-mortar lining with a bituminous seal coat in accordance with applicable ANSI standards.

Unless otherwise indicated or specified, buried pipe shall have an exterior bituminous coating of coal-tar or asphalt base in accordance with AWWA C110, C151, or C153, as applicable.

Unless otherwise indicated or specified in the Contract Documents, buried fittings shall be ductile iron or gray iron with mechanical joints. Fittings from 8 through 16 inches shall be cement lined and tar coated.

Pipe Joints

Push-on-joints and mechanical joints shall conform to ANSI/AWWA C111/A21.11.

Flanged joints shall be assembled with bolts and nuts, bolt studs with nut on each end, or studs with nuts in tapped flanges. Bolts and nuts shall be manufactured in accordance with ASTM A325, Type 1, Grade 5, hot-dipped galvanized finish, heavy hex head, 120,000 psi minimum tensile strength with X-Heavy nuts. Nuts and bolts shall be provided with an anti-seize, thread lubricating compound.

Gaskets for flanged joints shall be full face, 1/8 inch red rubber. Ring gaskets shall be provided for piping 14 inches in diameter and larger.

Where indicated on the Drawings, provide restrained joints. Gaskets shall meet the material requirements of

ANSI/AWWA A21.11/C111 for mechanical joint gaskets.

Restrained gasketed joints for rubber push-on joint pipe shall be Fast-Grip® by American Cast Iron Pipe Company, Field Lok 350® by US Pipe and Foundry Co., or equal. Contractor is to supply the Owner with four new gasket disassembly drive shims as a part of the project.

Water mains shall be a minimum of 8 inches in diameter.

Insulated Water Main Pipe

Insulated water main pipe shall be as follows:

Fero Therm, as manufactured by Thermacor Process, L.P.; 1670 Hicks Field Road East; Fort Worth, TX 76179-

5248; (817) 847-7300; “Insul-Tek Ductile Iron System”, as manufactured by Preinsulated Piping Systems, Inc.;

Tricon Ductile Iron Pipe System, as manufactured by Tricon, Inc. or equal.

G0384-060/09/16/26 SP-7 Special Provisions

Insulation

Insulation shall be polyurethane foam either spray applied or injected with one shot into the annular space between carrier pipe and jacket, and shall be bonded to both.

Insulation shall be rigid, 90-95% closed cell polyurethane with a 2.0 to 3.0 pounds per cubic foot density per ASTM

D1622 and ASTM D2856.

The coefficient of thermal conductivity (K-Factor) of 0.14 to 0.16 BTU/hr. in/sf/oF @ 73oF per ASTM C518, and also conforming to ASTM C591.

Maximum operating temperature shall not exceed 250°F.

Insulation thickness shall be 2.16” inches, giving the piping system a nominal overall outside diameter of 17.83 inches.

The unit weight per foot of the pre-insulated piping with HDPE jacket shall not be less than 16.01 pounds.

Pipe Gland Outer Casing

Outer casing jacketing material shall be high density polyethylene (HDPE). FRP and tape jacket will not be allowed.

The thickness of the HDPE jacket is 0.554 inches for 18 inch piping.

Black HDPE resin Type III, Grade P34 under ASTM D1248

Tensile yield strength of 3,300 psi per ASTM D638

Ultimate elongation of 850% per ASTM D638

Tangent flexural modulus of 175,000 psi per ASTM D790

Pipe Fittings

Fittings shall be ductile iron or gray iron.

Fittings less than or equal to 12 inches in size shall conform to ANSI/AWWA C110/A21.10 or ANSI/AWWA

C153/A21.53 and shall have a 350 psi pressure rating.

Fittings greater than 12 inches in size shall conform to ANSI/AWWA C110/A21.10 or ANSI/AWWA C153/A21.53 and shall have the following pressure ratings:

Fittings greater than 12 inches and less than or equal to 24 inches - 350 psi

Fittings greater than 24 inches - 250 psi

Mechanical joint retainer glands shall be installed on all mechanical joints. Retainer glands shall be specifically designed to fit standard mechanical joint bells with corrosion resistant, high strength, low-alloy T-head bolts conforming to ANSI/AWWA A21.11/C-111 and ANSI/AWWA A21.53/C-153. Retainer glands shall be manufactured of ductile iron conforming to ASTM A536-80, grade 60-42-10. Wedges shall be of hardened ductile iron and require the same torque in all sizes. These devices shall have a minimum 250 psi pressure rating with a minimum safety factor of 2:1 and shall be EBAA IRON, Inc., Megalug® series 1100 or equal. Glands shall be listed with Underwriters Laboratories and/or approved by Factory Mutual.

Anchoring tees shall have main run ends as indicated on the Drawings or as required for the installation. The branch shall have a plain end with an integral gland and rotating mechanical joint gland to provide a restrained connection with the adjacent valve or fitting (typically used for hydrant branches).

G0384-060/09/16/26 SP-8 Special Provisions

Tapping sleeves and valves from 6 through 16 inches shall be two-piece cast-iron mechanical-joint heavy pattern, as manufactured by Clow or approved equal.

Couplings

Solid sleeves shall have long body type (12 inches min.) and mechanical joints with retainer glands.

Couplings and transitional couplings for pipe less than or equal to 12 inches in diameter shall consist of a long body cast iron sleeve and shall have gaskets suitable for the pipe being joined. The bolts and nuts shall be corrosion resistant high strength, low alloy steel such as Cor-Ten steel or an approved equal. Couplings shall be Romac style

501, Dresser style 153, Rockwell type 441, or equal. Transition couplings for pipe less than or equal to 12 inches in diameter shall be Dresser Style 162, Rockwell Type 441, Smith Blair Omni Style 442, or equal.

Couplings and transitional couplings for pipe greater than 12 inches in diameter shall consist of a steel sleeve with gaskets suitable for the pipe being joined. The bolts and nuts shall be corrosion resistant high strength, low alloy steel such as Cor-Ten steel or an approved equal. Couplings shall be Dresser Style 38, Smith Blair Style 311, Romac

Style 400, or equal. Transition couplings for pipe greater than 12 inches in diameter shall be Dresser Style 62, Smith

Blair Style 413, Romac Style TC400, or equal.

Provide couplings with an exterior epoxy coating.

Gaskets, Glands, Nuts, and Bolts

Gaskets, glands, nuts, bolts and accessories shall conform to ANSI/AWWA C111/A21.11 or C153/A21.53, as appropriate.

Gaskets shall be of plain tipped rubber, suitable for exposure to the liquid within the pipe.

Lubricants must be suitable for the type of fluid to be carried by the pipeline and shall be NSF approved for water service.

Glands shall be ductile or cast iron.

Bolts shall be high strength, low alloy.

Thrust Blocks/Anchor Blocks/Joint Restraints

Joint restraints shall be used at all bends, fittings, hydrants, valves and piping as specified in the paragraphs mentioned below and in accordance with restraint as indicated on the Drawings. Where indicated on the Drawings, provide restrained joints suitable for a 200-psi working pressure. Gaskets shall meet the material requirements of

ANSI/AWWA A21.11/C111 for mechanical joint gaskets

Restrained joints for rubber-type push-on joint pipe shall be Lok-Ring® Joint by American Cast Iron Pipe Company, TR FLEX® by US Pipe and Foundry Co., Snap-Lok® by Griffin Pipe Products Co., or equal.

Mechanical joint retainer glands shall be installed on all mechanical joints, except where rodding is used. Retainer glands shall be specifically designed to fit standard mechanical joint bells with corrosion resistant, high strength, low-alloy T-head bolts conforming to ANSI/AWWA A21.11/C-111 and ANSI/AWWA A21.53/C-153. Retainer glands shall be manufactured of ductile iron conforming to ASTM A536-80 grade 60-42-10. Wedges shall be of hardened ductile iron and require the same torque in all sizes. These devices shall have a minimum 250 psi pressure rating with a minimum safety factor of 2:1 and shall be EBAA IRON, Inc., series 1100 or equal. Glands shall be listed with Underwriters Laboratories and/or approved by Factory Mutual.

G0384-060/09/16/26 SP-9 Special Provisions

Evidence of joint restraint materials shall be the manufacturer’s certification or certified test results indicating conformance with the requirements of these Specifications.

Rods, clamps with washers, straps and other harnessing hardware shall be stainless steel type 304 or 316 and installed in accordance with the manufacturer’s recommended installation procedures, as approved.

After each “locking” joint is assembled, the pipe shall be extended until the locking system “bottoms out” in order to avoid accumulated joint movement when the system is pressurized.

Retainer glands, such as Megalugs, shall be installed in accordance with the manufacturers’ written instructions.

Thrust blocks and anchor blocks, shall be installed in addition to the above-mentioned joint restraints and shall be used behind bends, hydrants, tees, and dead ends, and at new mains tapped into existing mains. A minimum of 1/3 cubic yard of concrete shall be used for each thrust block. Minimum bearing area of thrust blocks shall be as indicated on the Drawings. Anchor block sizes shall be as shown on the Drawings. Felt roofing paper shall be placed to protect pipe joints. Concrete shall not be placed over bolts, nuts, or in a manner that prevents removal of joints.

Concrete for thrust blocks and anchor blocks shall have a minimum strength of 3,000 psi. All cement concrete must be from an approved ready-mix producer listed on the QCML. Transit mix concrete may be used subject to approval.

Straps and anchors shall be cold-rolled steel, painted with bitumastic.

Test Connections

Install air release, test connections, and blow offs in the piping for pressure testing and disinfection at locations to be determined by the Contractor and approved by the Engineer.

Corporation cocks shall be in accordance with ANSI/AWWA C800 and shall be ¾ inch diameter with CC thread on inlet by iron pipe thread flare on outlet as manufactured by Mueller, Ford, McDonald or equal.

Copper tubing shall be annealed Type K soft tubing and shall conform to the requirements of ASTM B88.

Upon completion of testing and disinfection, remove the corporation cock and replace with a brass plug and the copper tubing removed. Field swab the brass plug for disinfection in accordance with AWWA C651.

Damaged/Defective Pipe

Defective pipe or fittings will be rejected for use on this project. Defective pipe is classified as follows:

Damage to interior lining

Insufficient lining thickness

Pipe out of round

Damaged pipe barrel area

Damaged pipe bells or spigots

Missing, misplaced or illegible marking and identification

Outside pipe diameter exceeding allowable tolerance

If defective pipe is discovered after it has been installed, it shall be removed and replace with sound pipe, at no additional cost to the Owner.

G0384-060/09/16/26 SP-10 Special Provisions

Valves General

Valves, hydrants, and appurtenances shall conform to the standards of the City of Gardner Department of Public

Works, located in Section 00800.

Pressure and temperature ratings shall be as scheduled.

Valve sizes shall be the same size as the upstream pipe, unless otherwise indicated.

Provide accessories including bolts, nuts, glands, and gaskets.

Extended Stems - Where insulation is indicated or specified, provide extended stems arranged to receive insulation.

Valves shall have the same end connections as the pipeline in which it is installed

Provide 125# ANSI B16.1, ANSI/AWWA C115/21.15 standard flange drilling for valves with flanged ends inside buried structures. Provide 1/8 inch full-face red rubber gaskets at all flanged connections.

Buried valves shall have mechanical joint ends compatible with the piping systems in which they are installed in accordance with ANSI/AWWA C111/A21.11-85 and Mega-Lug type retainer glands. Provide mechanical joint accessories, including glands, SBR rubber gaskets, tee head bolts, and nuts with the valves. Provide stainless steel bolts and nuts.

Mechanical joint ends shall be compatible with ductile iron O.D. pipe.

Valves and appurtenances shall be of the size shown on the Contract Drawings.

Equipment of the same type shall be from one manufacturer, unless otherwise approved.

Valves, hydrants, and appurtenances shall have the name of the manufacturer, flow directional arrows, and the working pressure for which they are designed cast in raised letter upon some appropriate part of the body.

Valves for water distribution systems shall be certified to NSF 61 and NSF 372.

Bolts shall be 304 stainless steel with hex heads and hex nuts in accordance with ASTM A-307 and A-563, respectively.

Provide buried valves with standard valve box with tee-handle operator.

Gate Valve

Gate valves shall be mechanical-joint, resilient-wedge type suitable for underground service and shall comply with

AWWA C509. Gate valves shall be cast iron or ductile iron.

Gate valves shall be designed to be bubble tight for 250 psig water working pressure with no leakage past the seat from either side of the disc, and shall be hydrostatically tested to 500 psig.

Gate valves shall be of the non-rising stem (N.R.S.) design.

Valves 12 inches and smaller shall be resilient-wedge gate valves set vertically (spur gearing).

Gate valves shall open left.

Buried gate valves shall be furnished with 2 inch square operating nuts.

Open-left valves shall have a yellow-painted operating nut.

Cast iron shall meet the specifications of ASTM A126, Class B. Castings shall be clean and sound without defects that will impair their service. No plugging or welding of such defects will be allowed. Ductile iron shall meet the standards of ASTM A536.

G0384-060/09/16/26 SP-11 Special Provisions

The resilient-seated disc wedge shall be of the resilient wedge fully supported type, either cast iron or ductile iron.

Solid guide lugs shall travel within channels in the body of the valve. The disc and guide lugs shall be fully encapsulated in SBR (styrene butadiene rubber) or EPDM rubber. Disc wedges that are not 100% fully encapsulated shall not be acceptable. Provide guide caps of an acetal copolymer bearing material to protect the rubber-encapsulated solid guide lugs from abrasion for long life and ease of operation.

The seat shall be SBR or EPDM rubber, matching the disc encasement. The seating surface (rubber) shall be specially designed so as to provide a smooth waterway, without depressions or cavities, which might trap debris and interfere with tight closures.

The body, bonnet, and gate shall be cast/ductile iron, constructed in accordance with AWWA C509. The bonnet to body seal shall incorporate a flat neoprene gasket. Bonnet and body flanges shall be fully machined to assure proper sealing of the gasket.

Gate valve stems shall be stainless steel equivalent to AISI 420 and conforming to ASTM A276, and shall have a forged thrust collar. The thrust collar shall be factory lubricated, and the thrust collar and its lubrication shall be isolated by the O-rings from the waterway and from outside contamination, providing permanent lubrication for long-term ease of operation. An anti-friction thrust washer shall be provided above and below the thrust collar for ease of operation.

Gate valves shall have O-Ring sealed stems with one O-Ring located below the thrust collar and two O-Rings located above the thrust collar. The two O-Rings located above the thrust collar shall be replaceable with the valve still in service in the fully open position.

Coat internal and external exposed ferrous surfaces of the valve with a fusion-bonded, thermosetting powder epoxy coating suitable for potable water service conforming to AWWA C550. Coating shall be non-toxic and shall impart no taste to water. Coating thickness shall be nominal 10 mils. Gate valves for water distribution systems shall be certified to NSF 61.

Gate valves shall be American AVK resilient wedge, Clow resilient wedge, Waterous Series 500 resilient wedge, or approved equal.

Valve Boxes

Provide a valve box of the adjustable heavy pattern, constructed of cast iron and provided with a 5-1/2 inch cast-iron cover marked "WATER" for each buried valve.

Valve boxes shall be manufactured by Mueller Co., Bingham & Taylor, or approved equal.

Valve boxes shall be round, two-piece, sliding-type cast iron with a 48-inch bottom and 24-inch top. The upper section shall have a flange with sufficient bearing area to prevent settling. The bottom of the lower section shall be belled to enclose the valve operating nut. The barrel shall be 5-1/2 inches O.D. minimum.

Boxes shall be of lengths consistent with pipe depths. Boxes shall be adjustable, with a lap of at least 6 inches when in the most extended position.

Slot covers for easy removal.

Covers for valve boxes on water mains shall have the word “WATER” cast in the top.

Coat valve boxes with coal-tar pitch enamel or other approved coating.

G0384-060/09/16/26 SP-12 Special Provisions

Valve boxes shall be suitable for the size valve on which they are used, and the lower section shall be long enough for trench adjustment.