2026 Overlay Project
Closed State & local contract opportunity Posted
- Solicitation number
- WJPW26052601
- State
- Utah
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 76596 Recycled Road And Highway Equipment And Supplies (Not Otherwise Classified)
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 750 Road And Highway Building Materials, Non Asphaltic
- 59540 Nursery, Greenhouse And Floral Supplies: Labels, Planters, Pots, Tags, Trellises, Etc.
- 91327 Construction, Highway And Road
Opportunity details come from utah.bonfirehub.com. Updated .
About this opportunity
The City of West Jordan, Utah is soliciting bids for milling, overlaying, and associated utility and sidewalk work on five collector streets under the 2026 Roadway Overlay Project (CRD 26-02), with bids due June 16, 2026 at 2:00 p.m. Mountain Time through the Utah Public Procurement Place. Work on Old Bingham Highway and Gardner Lane carries a school-calendar constraint: it must commence after school ends in June and be completed before school begins in August.
The scope covers milling and asphalt overlay of portions of 5600 West, 7800 South, Prosperity Road, Old Bingham Highway, and Gardner Lane; lowering and raising utility manholes, valves, and monuments; replacing ADA ramps; repairing or replacing curb and sidewalk; and installing traffic markings and striping per plans. The contract includes four separate bid schedules with unit pricing for asphalt milling (square yards), asphalt concrete overlay courses (tons), utility adjustments (per each), and concrete sidewalk and curb work (linear feet and square feet). General contractor supervision, quality control, mobilization and demobilization, and traffic control are required as lump-sum bid items for each schedule.
Bidders must possess a Utah General Contractor License with E100 classification and provide performance and payment bonds. Contractors must obtain all required permits, including UTA and UDOT permits, and comply with Utah prevailing wage rates. Work must be completed by the earlier of 90 calendar days after commencement or September 30, 2026. Liquidated damages are assessed daily, ranging from $560 per day for contracts up to $100,000 to $2,430 per day for contracts between $5,000,000 and $10,000,000. Retainage of five percent is withheld from monthly progress payments. A non-mandatory pre-bid meeting is scheduled for June 3, 2026 at 10:00 a.m. at West Jordan Public Works headquarters. The City reserves the right to reject any or all bids and award to the lowest responsive, responsible bidder.
Opportunity text
The work that is the subject of the bid comprises the overlay of up to five collector streets (the "Work") for the 2026 West Jordan Roadway Overlay Project. The Work includes milling and overlaying portions of 5600 West, 7800 South, Prosperity Road, Old Bingham Highway, and Gardner Lane; the lowering and raising of utility manholes, valves, and monuments; replacing ADA ramps; repairing or replacing curb and sidewalk; and installing traffic markings and striping per plans. Work on Old Bingham Highway and Gardner Lane must be conducted after school ends in June and be complete before school begins in August. The Contractor shall obtain all required and necessary permits to perform the work, including obtaining and following UTA and UDOT requirements under such permit(s).
Files
| File | Type | Posted |
|---|---|---|
| 1-WJPW26052601 2026 Overlay Project.pdf | ||
| 2-COI Guide for Contractors.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity