About this opportunity

Glades Electric Cooperative, Inc. (GEC) is requesting proposals to establish one or more master services agreements for debris cleanup in post-disaster environments across its service territory in Glades, Hendry, Highlands, and Okeechobee counties, Florida, with proposals due August 28, 2026 at 5:00 p.m. Eastern Time. Work will be activated through task orders with specific locations and details to be issued by GEC following storm events through December 31, 2027. Questions must be submitted in writing by August 20, 2026.

The scope includes utility pole pick-up and disposal, utility transformer pick-up with area cleanup and spill assessment, and general utility material disposal and recycling (metal hardware, wire scraps, packaging material) at designated bulk locations and along assigned roadways. The contractor must provide personnel (typically two per crew: operator and assistant), pickup trucks, flatbed trailers, and skid steers, with additional equipment proposed as needed. The contractor bears all responsibility for environmental compliance, chain-of-custody documentation, material-quantity tracking, and daily reporting by close of business with cumulative data.

Compensation is time and materials with hourly rates proposed by the contractor for labor (Supervisor, Operator, Laborer, Laborer Assistant at straight time, overtime, and double time) and equipment for 2026 and 2027 separately. Lodging, meals, and fuel are pass-through costs with no markup to maintain FEMA compliance. Payment is due within 30 days of invoice receipt and approval, with GEC retaining up to 10 percent pending task completion. The agreement is funded in whole or in part by FEMA Public Assistance and subject to 2 C.F.R. Part 200 federal cost principles; cost-plus-percentage structures are prohibited.

Proposals are evaluated on completeness (0–5 points), firm qualifications and technical approach (0–45 points), cost effectiveness (0–30 points), and similar projects and references (0–20 points), for a total of 100 points. The contractor must obtain and maintain Commercial General Liability ($1 million per occurrence, $5 million aggregate), Automotive Liability ($1 million per person/occurrence), and Workers' Compensation at statutory limits, with GEC named as additional insured.

Opportunity text

I. General The scope of services under this RFP includes debris cleanup for major storm restoration activities (the Services). GEC will activate the MSA through a Notice to Proceed, Task Order, or Task Release (Authorization) with the specific details of the work, including exact locations within its territory requiring assessments. The Services described below are non-exhaustive examples of services that may be requested; however, GEC may request less than all the services described, or additional services not specifically listed below but within the general scope of the RFP. II. Services Scope • Utility Pole Pick-up and Disposal o Contractor shall coordinate with GEC to pick up utility poles at designated bulk locations or along assigned roadways where poles have been left for pickup. o Contractor shall be responsible for disposing in a manner that meets all applicable environmental regulations and maintaining records for establishing chain of custody of removed and disposed of material. o Contractor will maintain records establishing quantity of material disposed of and corresponding landfill costs. All charges will be backed up with appropriate record and based on contract pricing. o Contractor shall handle any situations where poles are transferred to the property owner where damaged pole was located. Proper chain of custody will be maintained. • Utility Transformer Pick-up, Area Cleanup, Disposal o Contractor shall coordinate with GEC to pick up utility transformers at designated bulk locations or along assigned roadways where transformer have been left for pickup. o Contractor shall be responsible for disposing in a manner that meets all applicable environmental regulations and maintaining records for establishing chain of custody of removed and disposed of material. o Contractor will be responsible for assessing any transformer clean-up needs and carrying out proper spill cleanup as regulations require. o Contractor will maintain records establishing quantity of material disposed of and corresponding costs. All charges will be backed up with appropriate record and based on contract pricing. • General Utility Material Disposal and Recycling o Contractor shall coordinate with GEC to pick up general utility material (metal hardware, wire scraps, packaging material, misc) at designated bulk locations or along assigned roadways where transformer have been left for pickup. o Contractor shall be responsible for disposing in a manner that meets all applicable environmental regulations and maintaining records for establishing chain of custody of removed and disposed of material. o Contractor may provide containers where needed for project need. o Contractor will maintain records establishing quantity of material disposed of and corresponding costs. Personnel • Contractor shall provide the necessary personnel to complete the scope. This is typically 2 people per rig. An operator and an assistant. However, please provide all necessary labor rates. Equipment • Pickup • Flatbed Trailer • Skid Steer • The above equipment is what is typically needed to complete this scope of work. If more equipment will be used, please include those rates in the excel template provided. Contract Terms In addition to compliance with applicable Federal, State, and local rules and regulations, Contractor must also comply with the MSA and the terms and conditions in the Authorization, which will dictate the anticipated effort needed to complete the Services and include applicable terms and conditions for the Services. Fee Structure Given the uncertain nature of the quantity of work required and the percentage of service territory that will be impacted by the disaster, Contractor will have a time and materials fee structure at the rates proposed in response to this RFP. Please provide an hourly rate of the services. Documentation Management & Support Contractor shall provide data management and support as a part of the Services, including use of a compatible system for clearly tracking and documenting all elements identified above. Contractor must also substantiate its costs. Contractor must maintain all records pertaining to work performed consistent with the requirements set forth in the MSA and Authorization. Contractor shall submit a report by close of business each day with, at a minimum, the following information: • Contractor's Name; • Contract Number; • Daily and cumulative hours for personnel, by position, if appropriate; • Other operational and complaint tracking information, as requested. Failure to provide audit quality information by 5:00 p.m. of the following day of operation may result in financial penalty to the Contractor.