Z2DA--Replace Electrical Panels (436-24-101)

Closed Solicitation Posted

Solicitation number
36C25923R0053
Agency
Veterans Integrated Service Network 19 Veterans Health Administration, Department of Veterans Affairs
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2DA Repair Or Alteration Of Hospitals And Infirmaries

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks electrical panel replacement services at the Department of Veterans Affairs Montana Healthcare System facility in Fort Harrison, Montana. The contractor will replace two existing electrical panels and one additional panel as an option, constructing a new electrical room and installing new panels with a minimum of 42 circuit breakers each. The contractor must also evaluate arch flash protection and commission the completed system. Proposals are due by April 13, 2023, and the contract will be awarded on a firm-fixed price basis to the responsible offeror providing the best value.

This is a 100% set-aside for verified Service-Disabled Veteran-Owned Small Businesses. The projected NAICS code is 238210 and PSC code R499. The period of performance is 90 days with work taking place at the VA facility in Fort Harrison, Montana. The government estimates the contract value to be between $250,000 to $500,000.

Notice text

Statement of Work

Replace Electrical Panels in the Patriot Store VA Montana Project 436-24-101

GENERAL

A site walk-through is highly recommended to be performed prior to submitting a proposal. Offerors shall not visit the site without prior approval from the Contracting Officer and an escort from the Engineering Department.

The contractor shall ensure to follow VA Master Specifications as found in the website link provided. Additionally, the Contractor is required to meet all applicable laws and regulation not explicitly stated in this document as considered best practice for the State of Montana. As-built drawings shall be conducted and produced in compliance with VA Publications including Master Construction Specifications, Electrical Design Manual, and automated drawing standards (http://www.cfm.va.gov/TIL). Compliance with public law regarding energy utilization is required. If two or more requirements conflict, notify the Contracting Officer immediately and the more stringent requirement shall apply.

Should a conflict exist between VA requirements and VA adopted nationally recognized codes and standards, the conflict shall be brought to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for the VA to ensure a consistency system-wide.

PERIOD OF PERFORMACE

The period of performance is 90 days from issuance of the notice to proceed.

AS-BUILT DRAWINGS

The contractor shall maintain, As-built construction drawings on-site. The contractor shall visually identify any red line changes in person with the VAMC Ft Harrison COR. Within 10 days from construction completion, the contractor shall furnish As-built Constructed Record drawings in the latest AutoCAD version. Autodesk Revit © drawings shall NOT BE submitted. All drawings shall comply with VA s PG-18-4 Standard Details and CAD Standards.

SCOPE OF WORK

The VA Montana Healthcare System requires the services of a qualified Electrical engineering firm and Registered Electrical contractor in the State of Montana to provide services to build out an electrical room in the Canteen. The project consists of the replacement two (2) existing electrical panels supporting the patriot store, kitchen, and other locations as well as one bid alternate (Appendix D, Panel 106-A Replacement). The feeder for Panel 106-A comes directly from the switch gear. Confirmation of circuits and a balanced load per this Scope of Work. This will include the installation of a separate switched light in the electrical room, and the relocation/ replacement of a camera and a fire sprinkler head.

Contractor shall confirm existing conditions for construction. The new electrical panels will need to support a minimum of 42 new circuit breakers each as determined by the electrical engineer. Panels, circuit breakers and other parts will be offered to the facility maintenance staff prior to disposal. The existing panels have out of date panel schedules and the new schedules should reflect the current use. The contractor will be responsible for tracing the current usage and what each breaker is servicing. The Electrical Engineer will evaluate Arch Flash study and provide for considerations for this application and submit remediation requirements as needed. See Appendix F for the Bullet Point Scope of Work document.

Information provided by the Electrical Engineer shall require verification by the contractor who receives a contract for this project.

Contractor shall completely prepare the site for building operations, including demolition, infection control and replacement of existing electrical panels, wiring, and associated equipment, to include all labor and

materials required to perform the work for this project as required.

The project is an electrical modernization project. Contractor to determine the best engineering solution (Value Engineering) to install the new panels for Ft Harrison approval. The contractor shall provide full coordination drawings (existing and new as-built constructed drawings) as part of this project.

CURRENT CONDITIONS

The Canteen panels are currently served from building 154, room 144 (DEE panel) at the VA hospital, Ft. Harrison. There is a 2500A 208Y/120-volt distribution board located on the room, the main distribution board is in fair condition. The main distribution board feeds equipment that ranges in age from original construction in 1961 to equipment that has been installed within the past few years. This information must be confirmed by the Contractor.

Although some of the electrical distribution is nearing the end of its useful life, no additional electrical distribution equipment replacement is anticipated because of this project. The new meter shall be provided by the contractor, the current metering system the Square D Power logic, which is monitored and recorded by the facility.

The emergency power for Building 154 is provided by a 500-kW generator that was installed in 2000. The generator feeds four ASCO 7000 transfer switches serving Life Safety, Critical and Equipment loads.

PHASING PLAN

Since the affected areas are occupied Monday-Friday the contractor will be required to submit a detailed phasing plan to the COR for approval to the government prior to starting any work. The phasing plan should have as a minimum, an option to keep the impacts limited as much as possible. Working nights and/or weekends may be necessary to facilitate the continuous operation of services throughout the project.

SITE INVESTIGATION

The Contractor is responsible to conduct appropriate site investigation to obtain all information necessary to complete project activities. The VA will provide reference documents to the extent possible but does not guarantee the accuracy of such documents. The responsibility to verify all necessary information to complete Construction services belongs to the Contractor. Accuracy of existing drawings will be ascertained, and a conditional assessment of existing equipment/ material will be determined. Incomplete and fragmented site investigation by the contractor shall not be a justification to reduce the scope or increase contract price. Change orders will not be issued for increases to contract price.

DELIVERABLES

The Contractor will provide all equipment, manpower, sub-contractors, and materials necessary to produce a quality finished product, as-built constructed drawings, training, and spare equipment, tools and parts as defined in the specifications and or drawings. The construction work schedule will be modified or accelerated to meet government goals for delivery dates as defined in the contract at no additional cost to the government. All work must meet all infection control regulations, applicable codes, regulations, and standards. A construction safety plan is also required for this effort.

PROJECT SCHEDULE

The contractor will submit the proposed work schedule for approval within the time period specified during the pre-construction meeting. The contractor is responsible to supply all equipment, materials, manpower and Insurance and Bonding required to perform the work.

PRIVACY STATEMENT

Information Security: The C&A requirements do not apply, a Security Accreditation Package is not required. Incidental exposure to protected health information may occur from accessing the work site. Staff will follow all Privacy & Security policies and procedures.

APPENDIX/ SUPPORTING DOCUMENTATION

Panel Directory 154-106 (1)/Photos

Panel Directory 154-106 (2)/Photos

Panel Directory 154-DEE/Photos

Photo - Alternate #1, Panel 106A Replacement

Control Room 145, Motor controls breaker

Scope of work bullet point list

Electrical Panel Replacement-154-106 (1)- Appendix A

Panel Directory Last updated 7.6.2020

Panel Description: 154 106(1)

Location: BLGD 154 Room 162

Blank

0

Blank

0

0

Dishwasher & Garbage Disp. In Kit

50

00

Air Conditioner

50

000

2 Door Refrig. Kitchens

20

1

Refer over & under Door

20

2

Kitchen Outlets

20

3

Outlet Behind Front Bar

20

4

Outlets Gift shop

20

5

Outlet Behind Front Bar

20

6

Rang Hood Lt.

20

7

Clock Refer in Kitchen Exh. Fan Telephone office

20

8

Fire Sprinkler Control

20

9

Reger in Kitchen

20

10

Fire Sprinkler Control

20

11

Exh Fan, Telephone office

20

12

Fire Sprinkler Contol

20

13

Dishwasher & Garbage Disp. In Kit

20

14

Outlets Gift shop

20

15

Freezer in Kitchen

20

16

Outlets Gift shop

20

17

Refer. By Coffee Pots

20

18

Slicer

20

19

Vending Machines

20

20

Storage rm. Freezer

20

21

Vending Machines

20

22

Outlets Canteen

20

23

Vending Machines

20

24

Garbage Disp. in Dishwash Rm

20

25

Vending Machines

20

26

Garbage Disp. in Dishwash Rm

20

27

Vending Machines

20

28

Garbage Disp. in Dishwash Rm

20

*See Engineering department if updates to this card are required*

Electrical Panel Replacement-154-106 (2)- Appendix B

Panel Directory Last updated 7.6.2020

Panel Description: 154 106(2)

Location: BLGD 154 Room 162

29

Lights Office

20

30

Cantten Lights

20

31

Light PX&E31 Store Exhaust

20

32

Isolation Transformer

20

33

Lights Dishroom

20

34

Outlets Kitchen

20

35

Outlets Kitchen

20

36

Lights Canteen microwave

20

37

Coffee Pot

30

38

Outlets office

20

39

40

Vending machines

20

41

Cash Regasiter Cannten

20

42

Outlet Cutting table

20

43

Water Cooler

20

44

Pass thru Warmer

20

45

Ice cube dish

20

46

Pass thru Warmer

20

47

Front bar freezer, Outlet on Drink Table

20

48

Ice machine

20

49

Outlet under trash

20

50

Outside Microwave

20

51

Salad line

20

52

Outlets Kitchen

20

53

Lighted display case

20

54

Lights Kitchen

20

55

Gift shop outlets

20

56

Omelette

30

57

Beastro

90

58

59

60

Microwave in kitchen

20

*See Engineering department if updates to this card are required*

Note: The intent is to replace these panels from the current wall to the inside of a newly constructed electrical room. The new panels will be piano hinged with the space of the new electrical room and if possible, avoid rerunning new service wire to the new panels.

Panel 154-DEE, Room 144-Appendix C

Panel Directory Last updated 7.6.2020

Panel Description: 154 DEE

Location: BLGD 154 Room 144

1

Elevators

300

2

MCC 2 B 100 Basement

200

3

PNL BEE1 Canteen Store

225

4

PNL 1EE1 RM 118 X Ray

225

5

PNL 106 Canteen Store

225

6

PNL 154 PEE4 Penthouse

100

7

Pharmacy EE1 Equipment Panel

100

8

PNL 154 2EE1 Rm 238, PNL 3EE1 Rm 332

100

9

Morgue Elevator

60

10

Spare

150

11

Spare

100

12

PNL E209A RM 238 PAD

30

13

Panel 154 2EE3 225A

150

14

Spare

20

15

X Ray Rm 125

400

16

Nuclear Medicine

20

17

Panel EC5 BLDG 154A

100

18

Spare

20

19

Blank

20

20

Ambulance Bay Head

30

*See Engineering department if updates to this card are required*

Appendix D Alternate #1, Panel 106-A Replacement

Appendix E, Motor Controls spare parts- (3)

Appendix F, Scope of work bullet point list:

Demolition of the existing panels and removal and relocation of the display boards currently at this location.

The installation of steel studs, sheetrock and paint required to construct a code compliant electrical room.

The construction of an electrical room with trim and an operable commercial door and locking hardware as shown in the drawing.

Provide advanced utility metering connected to the existing Building automation system coordinated by Schneider Electric.

Confirmation of the correct wire size feeding the panels as well as branch circuit wire sizes. Evaluation of the arch flash potential for this arrangement by the Electrical Engineer. Electrical demolition of unused breakers/ wire and the removal of the existing panels. Deliver breakers to the Maintenance facility staff for the first right of refusal. Demolition/ replacement of any cloth covered wiring circuits. Installation of any new electrical conductors as required by the Electrical Engineer. Replacement of all the breakers.

Replacement of the panels with (2) 225-amp panels (42 spaces each) with piano hinges and locking devices, grounding, and bonding as required. One of the panels may be required to be constructed so that the conductors can feed through the first panel to service the second panel.

The contractor to provide spare motor controls breakers (3) in the event of the failure located at Room 145 sized and specified by the electrical engineer. (Appendix E, pictured above)

Commissioning of the electronic grounding, metering, bonding and backup generator power of the system when complete.

Attachments

Show all 11

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Z2DA--Replace Electrical Panels (436-24-101) This notice · Latest solicitation Solicitation
Z2DA--Replace Electrical Panels (436-24-101) Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity