36C25923R0053.docx
DOCX document 789 KB Posted
- Attached to
- Z2DA--Replace Electrical Panels (436-24-101) Federal contract opportunity
- Solicitation number
- 36C25923R0053
About this file
This solicitation is for electrical panel replacement services at the Veterans Affairs Montana Healthcare System facility in Fort Harrison. The contractor will replace two existing electrical panels in the Canteen building that support areas such as the patriot store, kitchen, and other locations. An alternate to also replace Panel 106A will be considered. The work includes constructing an electrical room, installing new panels with a minimum of 42 breakers each, and related electrical upgrades. The performance period is 90 days from notice to proceed. Offerors must be verified as service-disabled veteran-owned small businesses by the VA Center for Verification and Evaluation. Proposals are due by April 3, 2023 and the contract will be a firm-fixed-price award between $250,000 to $500,000. The selected contractor must provide as-built drawings, spare equipment, and ensure all work meets infection control standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S05 - QNA (Replace Electrical Panels).pdf | ||
| P09 - SOW - Replace Electrical Panels (436-21-101) 04.04.23.pdf | ||
| 36C25923R0053 0002.docx | DOCX document | |
| ICRA 2.0 - template approved by CSC March 2022.Patriot Store Panel Replacement (002).pdf | ||
| 36C25923R0053 0001.docx | DOCX document | |
| S02 - 36C25923R0053.docx | DOCX document | |
| Past Performance Questionnaire.docx | DOCX document | |
| S02 - SPECS (ELECTRICAL PANELS) 436-24-101.pdf | ||
| S02 - DWG.1 Replace Electrical Panels (436-24-101) Flr Plns CONCEPT.pdf | ||
| S02 - Electrical Design Manual.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C25923R0053 X -2023 436-24-101 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 Jared.Detton@va.gov
Jared Detton 303-283-5307 The contractor shall furnish all labor, equipment, materials, and supervision to complete the roofing project located at 1101 Honor Heights Dr., Muskogee, OK 74401: 623-20-126 (Roofing Project Muskogee).
Project magnitude: between $ 0,000 and $ 00,000 The NAICS code is 236220 - Small Business size standard is $45 M
In accordance with P.L. 109-461, this acquisition is 100% set aside for Service-Disabled Veteran Owned Small Businesses concerns. See VAAR 852.219-10, Notice of Total Service-Disabled Veteran Owned Small Business Set-Aside of this solicitation for information in regard to requirements in order to be considered. Offerors must be both VISIBLE and VERIFIED by the Department of Veterans Affairs Center for Verifications Evaluation (CVE) prior to proposal receipt.
Failure to be both VERIFIED by CVE and VISIBLE on VetBiz prior to contract award will result in the offerors proposal being deemed non-compliant. All offerors are urged to contact the CVE and submit the aforementioned required documents to obtain CVE verification of their SDVOSB status if they have not already done so.
In accordance with FAR 52.204-7, System for Award Management (SAM), Prospective contractors shall be registered in the SAM database prior to close of solicitation.
A site visit will be held on March 13th, 2023, at 10:00 AM Mountain Time (MT). Please meet at Building 141, Room 208.
All questions in relation to this solicitation must be submitted in writing via e-mail to Jared.Detton@va.gov and received no later than March 16th, 2023, at 12:00 PM (NOON) Mountain Time (MT).
Instructions, Conditions, and Notices to Offerors. All submitted proposals must be received in email by the closing date and time. This solicitation closes April 3rd, 2023, at 2:00 P.M. MT.
Proposals shall be submitted via e-mail in accordance with Part I/Section B, to be considered for this project.
Proposals received in any other format will result in the offeror's proposal not receiving further consideration.
X X 52.211-10 X
2:00 PM
MDT
04-03-2023 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 Department of Veterans Affairs Financial Service Center PO Box 149971 Austin TX 78714-9971
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| A.3 PRICE/COST SCHEDULE | 5 |
| ITEM INFORMATION | 5 |
| A.4 STATEMENT OF WORK | 6 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 11 |
| 2.1 52.216-1 TYPE OF CONTRACT (APR 1984) | 16 |
| 2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 16 |
| 2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 16 |
| 2.4 52.233-2 SERVICE OF PROTEST (SEP 2006) | 17 |
| 2.5 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 18 |
| 2.6 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 18 |
| 2.7 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 19 |
| 2.8 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 19 |
| REPRESENTATIONS AND CERTIFICATIONS | 20 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2022) | 20 |
| 3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 23 |
| 3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 26 |
| 3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021) | 27 |
| GENERAL CONDITIONS | 29 |
| 4.1 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021) | 29 |
| 4.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) | 30 |
| 4.3 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022) | 30 |
| 4.4 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (OCT 2022) | 32 |
| 4.5 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022) | 34 |
| 4.6 SUPPLEMENTAL INSURANCE REQUIREMENTS | 39 |
| 4.7 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 39 |
| 4.8 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022) | 42 |
| 4.9 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 42 |
| 4.10 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020) | 42 |
| 4.11 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR VERIFIED SERVICE-DISABLED VETERAN OWNED SMALL BUSINESSES (NOV 2022) | 42 |
| 4.12 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUB-CONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (NOV 2022) | 45 |
| 4.13 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 47 |
| 4.14 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 47 |
| 4.15 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018) | 47 |
| 4.16 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 50 |
| 4.17 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 51 |
| 4.18 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 52 |
| 4.19 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) ALTERNATE I (APR 2019) | 52 |
| 4.20 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 53 |
| 4.21 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 54 |
| 4.22 WAGE DETERMINATION | 55 |
| 4.23 LIST OF ATTACHMENTS | 62 |
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
Base Pricing (See Statement of Work for Details)
Provide all work as described by attached plans, specifications, and Wage Determinations for Veterans Administration project VA Project 436-24-101 Replace Electrical Panels at the Ft. Harrison VAMC as described in the attached statement of work. Price includes all costs for construction. Cost shall include but not be limited to direct and indirect costs including profit, overhead, general and administration, insurance, labor, bonds, taxes, necessary for 100% completion of the project as indicated in the attached SOW. The construction performance period is 90 calendar days from receipt of notice to proceed.
Contract Period: Base POP End: 90 days from NTP PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z2DA - Repair or Alteration of Hospitals and Infirmaries
| GRAND TOTAL |
| __________________ |
A.4 STATEMENT OF WORK
Replace Electrical Panels in the Patriot Store VA Montana Project 436-24-101
GENERAL
A site walk-through is highly recommended to be performed prior to submitting a proposal. Offerors shall not visit the site without prior approval from the Contracting Officer and an escort from the Engineering Department.
The contractor shall ensure to follow VA Master Specifications as found in the website link provided. Additionally, the Contractor is required to meet all applicable laws and regulation not explicitly stated in this document as considered best practice for the State of Montana. As-built drawings shall be conducted and produced in compliance with VA Publications including Master Construction Specifications, Electrical Design Manual, and automated drawing standards (http://www.cfm.va.gov/TIL).Compliance with public law regarding energy utilization is required. If two or more requirements conflict, notify the Contracting Officer immediately and the more stringent requirement shall apply.
Should a conflict exist between VA requirements and VA adopted nationally recognized codes and standards, the conflict shall be brought to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for the VA to ensure a consistency system-wide.
PERIOD OF PERFORMACE
The period of performance is 90 days from issuance of the notice to proceed.
AS-BUILT DRAWINGS
The contractor shall maintain, As-built construction drawings on-site. The contractor shall visually identify any red line changes in person with the VAMC Ft Harrison COR. Within 10 days from construction completion, the contractor shall furnish As-built Constructed Record drawings in the latest AutoCAD version. Autodesk Revit © drawings shall NOT BE submitted. All drawings shall comply with VA’s PG-18-4 Standard Details and CAD Standards.
SCOPE
The VA Montana Healthcare System requires the services of a qualified Electrical engineering firm and Registered Electrical contractor in the State of Montana to provide services to build out an electrical room in the Canteen. The project consists of the replacement two (2) existing electrical panels supporting the patriot store, kitchen, and other locations as well as one bid alternate (Appendix D, Panel 106-A Replacement). The feeder for Panel 106-A comes directly from the switch gear. Confirmation of circuits and a balanced load per this Scope of Work. This will include the installation of a separate switched light in the electrical room, and the relocation/ replacement of a camera and a fire sprinkler head.
Contractor shall confirm existing conditions for construction. The new electrical panels will need to support a minimum of 42 new circuit breakers each as determined by the electrical engineer. Panels, circuit breakers and other parts will be offered to the facility maintenance staff prior to disposal. The existing panels have out of date panel schedules and the new schedules should reflect the current use. The contractor will be responsible for tracing the current usage and what each breaker is servicing. The Electrical Engineer will evaluate Arch Flash study and provide for considerations for this application and submit remediation requirements as needed. See Appendix F for the Bullet Point Scope of Work document.
Information provided by the Electrical Engineer shall require verification by the contractor who receives a contract for this project.
Contractor shall completely prepare the site for building operations, including demolition, infection control and replacement of existing electrical panels, wiring, and associated equipment, to include all labor and Materials required to perform the work for this project as required.
The project is an electrical modernization project. Contractor to determine the best engineering solution (Value Engineering) to install the new panels for Ft Harrison approval. The contractor shall provide “full” coordination drawings (existing and new as-built constructed drawings) as part of this project.
CURRENT CONDITIONS
The Canteen panels are currently served from building 154, room 144 (DEE panel) at the VA hospital, Ft. Harrison. There is a 2500A 208Y/120-volt distribution board located on the room, the main distribution board is in fair condition. The main distribution board feeds equipment that ranges in age from original construction in 1961 to equipment that has been installed within the past few years. This information must be confirmed by the Contractor.
Although some of the electrical distribution is nearing the end of its useful life, no additional electrical distribution equipment replacement is anticipated because of this project. The new meter shall be provided by the contractor, the current metering system – the Square D Power logic, which is monitored and recorded by the facility.
The emergency power for Building 154 is provided by a 500-kW generator that was installed in 2000.The generator feeds four ASCO 7000 transfer switches serving Life Safety, Critical and Equipment loads.
PHASING PLAN
Since the affected areas are occupied Monday-Friday the contractor will be required to submit a detailed phasing plan to the COR for approval to the government prior to starting any work. The phasing plan should have as a minimum, an option to keep the impacts limited as much as possible. Working nights and/or weekends may be necessary to facilitate the continuous operation of services throughout the project.
SITE INVESTIGATION
The Contractor is responsible to conduct appropriate site investigation to obtain all information necessary to complete project activities. The VA will provide reference documents to the extent possible but does not guarantee the accuracy of such documents. The responsibility to verify all necessary information to complete Construction services belongs to the Contractor. Accuracy of existing drawings will be ascertained, and a conditional assessment of existing equipment/material will be determined. Incomplete and fragmented site investigation by the contractor shall not be a justification to reduce the scope or increase contract price. Change orders will not be issued for increases to contract price.
DELIVERABLES
The Contractor will provide all equipment, manpower, sub-contractors, and materials necessary to produce a quality finished product, as-built constructed drawings, training, and spare equipment, tools and parts as defined in the specifications and or drawings. The construction work schedule will be modified or accelerated to meet government goals for delivery dates as defined in the contract at no additional cost to the government. All work must meet all infection control regulations, applicable codes, regulations, and standards. A construction safety plan is also required for this effort.
PROJECT SCHEDULE
The contractor will submit the proposed work schedule for approval within the time period specified during the pre-construction meeting. The contractor is responsible to supply all equipment, materials, manpower and Insurance and Bonding required to perform the work.
PRIVACY STATEMENT
Information Security: The C&A requirements do not apply, a Security Accreditation Package is not required. Incidental exposure to protected health information may occur from accessing the worksite. Staff will follow all Privacy & Security policies and procedures.
APPENDIX / SUPPORTING DOCUMENTATION
A.) Panel Directory 154-106(1)/Photos B.) Panel Directory 154-106(2)/Photos C.) Panel Directory 154-DEE/Photos D.) Photo - Alternate#1, Panel 106A Replacement E.) Control Room 145, Motor controls breaker F.) Scope of work bullet point list
ElectricalPanelReplacement-154-106(1)-AppendixA
Panel Directory ‐ Last updated 7.6.2020
| Panel Description: 154‐106(1) |
| Location: BLGD 154 Room 162 |
| Blank |
| 0 |
| Blank |
| 0 |
Dishwasher & Garbage Disp. In Kit
| 00 |
| Air Conditioner |
| 50 |
| 000 |
| 2 Door Refrig. Kitchens |
| 20 |
| 1 |
| Refer over & under Door |
| 20 |
| 2 |
| Kitchen Outlets |
| 20 |
| 3 |
| Outlet Behind Front Bar |
| 20 |
| 4 |
| Outlets Gift shop |
| 20 |
| 5 |
| Outlet Behind Front Bar |
| 20 |
| 6 |
| Rang Hood Lt. |
| 20 |
Clock Refer in Kitchen Exh. Fan Telephone office
Fire Sprinkler Control
| 9 |
| Reger in Kitchen |
| 20 |
| 10 |
| Fire Sprinkler Control |
| 20 |
| 11 |
| Exh Fan, Telephone office |
| 20 |
| 12 |
| Fire Sprinkler Contol |
| 20 |
| 13 |
| Dishwasher & Garbage Disp. In Kit |
| 20 |
| 14 |
| Outlets Gift shop |
| 20 |
| 15 |
| Freezer in Kitchen |
| 20 |
| 16 |
| Outlets Gift shop |
| 20 |
| 17 |
| Refer. By Coffee Pots |
| 20 |
| 18 |
| Slicer |
| 20 |
| 19 |
| Vending Machines |
| 20 |
| 20 |
| Storage rm. Freezer |
| 20 |
| 21 |
| Vending Machines |
| 20 |
| 22 |
| Outlets Canteen |
| 20 |
| 23 |
| Vending Machines |
| 20 |
| 24 |
| Garbage Disp. in Dishwash Rm |
| 20 |
| 25 |
| Vending Machines |
| 20 |
| 26 |
| Garbage Disp. in Dishwash Rm |
| 20 |
| 27 |
| Vending Machines |
| 20 |
| 28 |
| Garbage Disp. in Dishwash Rm |
| 20 |
*See Engineering department if updates to this card are required*
ElectricalPanelReplacement-154-106(2)-AppendixB PanelDirectory‐Lastupdated7.6.2020
| PanelDescription:154‐106(2) |
| Location:BLGD154Room162 |
| 29 |
| LightsOffice |
| 20 |
| 30 |
| CanttenLights |
| 20 |
| 31 |
| LightPX&E31Store Exhaust |
| 20 |
| 32 |
| IsolationTransformer |
| 20 |
| 33 |
| Lights‐Dishroom |
| 20 |
| 34 |
| OutletsKitchen |
| 20 |
| 35 |
| Outlets‐Kitchen |
| 20 |
| 36 |
| LightsCanteenmicrowave |
| 20 |
| 37 |
| CoffeePot |
| 30 |
| 38 |
| Outletsoffice |
| 20 |
| 40 |
| Vendingmachines |
| 20 |
| 41 |
| Cash Regisiter Cannten |
| 20 |
| 42 |
| Outlet Cutting table |
| 20 |
| 43 |
| Water Cooler |
| 20 |
| 44 |
| Pass thru Warmer |
| 20 |
| 45 |
| Ice cube dish |
| 20 |
| 46 |
| Pass thru Warmer |
| 20 |
| 47 |
| Front bar freezer, Outlet on Drink Table |
| 20 |
| 48 |
| Ice machine |
| 20 |
| 49 |
| Outlet under trash |
| 20 |
| 50 |
| Outside Microwave |
| 20 |
| 51 |
| Salad line |
| 20 |
| 52 |
| Outlets Kitchen |
| 20 |
| 53 |
| Lighted display case |
| 20 |
| 54 |
| Lights Kitchen |
| 20 |
| 55 |
| Gift shop outlets |
| 20 |
| 56 |
| Omelette |
| 30 |
| 57 |
| Beastro |
| 90 |
| 58 |
| 60 |
| Microwave in kitchen |
| 20 |
*See Engineering department if updates to this card are required*
Note: The intent is to replace these panels from the current wall to the inside of a newly constructed electrical room. The new panels will be piano hinged with the space of the new electrical room and if possible, avoid rerunning new service wire to the new panels.
Panel 154-DEE, Room 144-Appendix C Panel
Directory
Last updated
7.6.2020 Panel
Description:
DEE
Location:
BLGD
Room
Elevators
MCC
B
Basement
PNL
BEE1
Canteen
Store
PNL
1EE1
RM
X Ray
PNL
Canteen
Store
PNL
PEE4
Penthouse Pharmacy
EE1
Equipment Panel
PNL
EE1Rm
238, PNL 3EE1 Rm 332 Morgue
Elevator Spare Spare
PNL
E209A
RM
PAD
Panel
2EE3
225A Spare X Ray
Rm
Nuclear
Medicine Panel
EC5
BLDG
154A Spare Blank Ambulance
Bay
Head *See
Engineering department if updates to this card are required*
Appendix D Alternate#1, Panel 106-A Replacement Appendix E, Motor Controls spare parts-(3)
Appendix F, Scope of work bullet point list:
· Demolition of the existing panels and removal and relocation of the display boards currently at this location.
· The installation of steel studs, sheetrock and paint required to construct a code compliant electrical room.
· The construction of an electrical room with trim and an operable commercial door and locking hardware as shown in the drawing.
· Provide advanced utility metering connected to the existing Building automation system coordinated by Schneider Electric.
· Confirmation of the correct wire size feeding the panels as well as branch circuit wire sizes. Evaluation of the arch flash potential for this arrangement by the Electrical Engineer. Electrical demolition of unused breakers/wire and the removal of the existing panels. Deliver breakers to the Maintenance facility staff for the first right of refusal. Demolition/ replacement of any cloth covered wiring circuits. Installation of any new electrical conductors as required by the Electrical Engineer. Replacement of all the breakers.
· Replacement of the panels with (2) 225-amp panels (42 spaces each) with piano hinges and locking devices, grounding, and bonding as required. One of the panels may be required to be constructed so that the conductors can feed through the first panel to service the second panel.
· The contractor to provide spare motor controls breakers (3) in the event of the failure located at Room 145 sized and specified by the electrical engineer. (Appendix E, pictured above)
· Commissioning of the electronic grounding, metering, bonding and backup generator power of the system when complete.
END OF STATEMENT OF WORK
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
PART I - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
PART I/SECTION A – REQUEST FOR PROPOSAL
I.1A JOINT VENTURES
If submitting an offer as a joint venture as defined by P.L. 109-461 AND Department of Veterans Affairs I.L. 049-06-4, http://www.vetbiz.gov/library/jtventure.pdf , an offeror must provide a copy of the joint venture agreement specific to the project that is consistent with the percentage of required work and net proceed. Additionally, the offeror must provide a breakdown or labor of which is to be performed by the SDVOSB firm and that which is performed by the small business joint venture firm and that which is sub-contracted. All Joint Ventures will be required to be registered and verified as an entity in VETBIZ prior to award.
I.2A SELECTION PROCEDURES
This acquisition will be a competitive acquisition utilizing FAR Part 15 source selection employing tradeoff source selection procedures. By submission of its offer, the offeror accedes to all solicitation requirements, including terms and conditions, representations, and certifications. All such offers shall be treated equally except for their prices and performance records. Failure to meet a requirement may result in an offer being determined non-compliant. It is the intent of the Government to award without discussions; however, the Government will reserve the right to have discussions if such are needed.
I.3A PRE-PROPOSAL SITE VISIT
See SF 1442, Block 10 and FAR Provision 52.236-27, Site Visit (Construction) of this solicitation. Please leave extra time to complete COVID-19 screening process when entering the building. Masks are required to be worn by all employees and contractors while on VA property.
I.4A SELECTION CRITERIA
This acquisition will utilize the tradeoff process in accordance with FAR 15.101-1. This process permits tradeoffs between non-cost factors and cost/price and allows the Government to accept other than the lowest priced proposal or other than the highest rated proposal to achieve a best value contract award based on established evaluation criteria. Inherent in this process is the necessity to make tradeoffs considering the non-cost strengths and weaknesses, risks, and the cost (or price) offered in each proposal.
The source selection process will be conducted utilizing FAR part 15.101-1 Trade-off Process Source Selection Procedures with Special Standards of Responsibility. Offers will be evaluated using the following evaluation factors:
Factor 1 – Past Performance Factor 2 – Price
In addition to the general standards of responsibility found at FAR 9.104-1, in accordance with FAR 9.104-2, the special standards of responsibility described below apply to this procurement. Offerors who fail to meet any special standard of responsibility may not be eligible to receive contract award.
Past performance will be evaluated on a basis of significantly more important than, cost or price.
Past Performance Evaluation For Factor 1, based on the evaluation of all recent and relevant past performance for an offeror, an overall performance confidence rating shall be assigned. The performance confidence ratings are defined below:
| ASSESSMENT |
| DESCRIPTION |
| Substantial Confidence | |
| Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort. |
| Satisfactory Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort. |
| Limited Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort. |
| No Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort. |
| Unknown Confidence (Neutral) |
| No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. |
Note: In the case of an offeror without a record of past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall receive an unknown confidence (neutral) performance confidence rating.
(a) Aspects of Past Performance Evaluation. The past performance evaluation is an assessment based on the offeror’s record of relevant and recent past performance information that pertain to the products and/or services outlined in the solicitation requirements. There are two aspects of the past performance evaluation.
| (1) The first is to evaluate whether the offeror’s present/past performance is relevant or not relevant to the effort to be acquired. The criteria to establish what is relevant is unique to each source selection. | |
| (2) The second aspect of the past performance evaluation is to determine how well the contractor performed on the contracts. The past performance evaluation performed in support of a current source selection does not establish, create, or change the existing record and history of the offeror’s past performance on past contracts; rather, the past performance evaluation process gathers information from customers on how well the offeror performed those past contracts. In addition, the Government reserves the right to obtain information for use in the evaluation of past performance from all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror. |
(b) Source Selection Evaluation Board (SSEB) members will review past performance information to determine the quality and usefulness as it applies to the performance confidence assessment.
Adverse past performance is defined as past performance information that supports a less than satisfactory rating on any evaluation element or any unfavorable comments received from sources without a formal rating system.
Factor 1-Past Performance:
(a) Solicitation Submittal Requirements:
Offerors shall provide a maximum of four (4) recent and relevant projects (as defined below) to demonstrate their ability to perform the proposed work identified within the Specifications, drawings, and Statement of Work. If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted. The Government will evaluate past performance based upon sources available to the contracting officer that may include Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS) and Electronic Subcontract Reporting System (eSRS). IF THERE IS NOT A PAST PERFORMANCE EVALUATION IN PPIRS or FAPPIIS, then the offeror shall submit Past Performance Questionnaires (PPQ) for each project. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Jared Detton, Jared.Detton@va.gov.
Recency – a recent project is defined as being completed within five years of the due date of this solicitation.
Relevant – includes performance of efforts in a project of replacing electrical panels in an active medical facility that are similar or greater in scope, magnitude, and complexity than the effort described in this solicitation.
Offerors are cautioned to submit enough information in the format specified in the solicitation. Offerors may be asked to clarify certain aspects of their proposal (for example, the relevance of past performance information) or respond to adverse past performance information to which the offeror has not previously had an opportunity to respond. Adverse past performance is defined as past performance information that supports a less than satisfactory rating on any evaluation element or any unfavorable comments received from sources without a formal rating system. Communication conducted to resolve minor or clerical errors will not constitute discussions and the contracting officer reserves the right to award a contract without the opportunity for proposal revision.
(b) – Basis of Evaluation:
The contracting officer shall review recent and relevant performance information on each offeror based on past efforts provided by the offeror and may obtain data independently from other government and commercial sources. Past performance regarding predecessor companies, key personnel who have relevant experience, or sub-contractors that will perform major or critical aspects of the requirement will not be considered as highly as past performance information for the principal offeror. Offerors with no past performance history or the offeror’s performance record is so limited that no confidence assessment rating can be reasonably assigned shall receive the rating "Unknown Confidence," meaning the rating is treated neither favorably nor unfavorably.
The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the offeror’s past performance will be used as a means of evaluating the offeror’s probability to successfully meet the requirements of the RFP.
Initially offers shall be ranked according to price, including any option prices if applicable. The lowest price offer’s past performance shall be evaluated to determine its performance confidence rating.
If the lowest priced evaluated offer is judged to have a Substantial Confidence performance assessment, that offer represents the best value for the government and the evaluation process stops at this point. Award shall be made to that offeror without further consideration of any other offers.
If the lowest price offer does not receive a Substantial Confidence performance confidence rating, the past performance evaluation continues until an offeror’s past performance is judged to have a Substantial Confidence performance rating. The Government reserves the right to award a contract to other than the lowest priced offeror if the lowest priced offeror is judged to have a performance confidence assessment of "Satisfactory Confidence" or lower. In that event, the Source Selection Authority shall make an integrated assessment best value award decision.
Factor 2 – Price:
(a) Solicitation Submittal Requirements:
· Standard Form 1442, Solicitation Offer and Award
· All pages of the SF1442 Continuation Sheet
(b) Basis of Evaluation: The Government will evaluate price based on the total price. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
· Comparison of proposed prices received in response to the RFP
· Comparison of proposed prices with the IGCE.
· Comparison of proposed prices with available historical information.
Special Standard of Responsibility Solicitation Submittal Requirements:
The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each Contractor who is part of the partnership or joint venture and for the entity itself. EMR shall not be submitted for subcontractors.)
1. OSHA or EPA Violation(s):
Offerors shall provide Summary of Work-Related Injuries and Illnesses, affirming that the Offeror has no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years.
2. Experience Modification Rate (EMR):
Offerors shall provide documentation to show that the offeror has an Experience Modification Rate (EMR) of equal to or less than 1.0. If an offeror’s EMR is above 1.0, the offeror must submit a written explanation of the EMR from its insurance carrier on the insurance carrier’s letterhead, describing the reasons for the EMR and the anticipated date the EMR may be reduced to 1.0 or below.
Offerors who fail to meet any special standard of responsibility may not be eligible to receive contract award.
PART I/SECTION B - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
I.1B COST RANGE: Between $250,000.00 and $500,000.00
I.2B GENDER: Wherever the masculine gender is used in this solicitation and contract documents, it shall be considered to include both masculine and feminine.
I.3B METRIC PRODUCTS:
Products manufactured to metric dimensions will be considered on an equal basis with those manufactured using inch-pound units, providing they fall within the tolerance specified using conversion tables contained in the latest revision of Federal Standard No. 376, and all other requirements of this document are met.
If a product is manufactured to metric dimensions and those dimensions exceed the tolerance specified in the inch-pound units, a request should be made to the Contracting Officer to determine if the product is acceptable. The Contracting Officer, in concert with the Contracting Officer’s Representative (COR), will accept or reject the product.
I.4B REQUESTS FOR INFORMATION:
All requests for information must be submitted in writing to the Contracting Officer for action no later than the date shown in Block 10 of the Standard Form 1442, Solicitation, Offer and Award.
I.5B PROPOSAL REQUIREMENTS
General – Both past performance information and price proposal shall be submitted in response to this solicitation. Proposals shall be submitted via email Jared.Detton@va.gov. Emails are limited to 15 MB. The proposal, in its entirety, shall be one email (one attachment for price proposal, one attachment for LOS certification, and one attachment for past performance information) not to exceed 15MB. Failure to submit in the format required and clearly address those factors may result in rejection of the offer. An original Bid Bond, in the amount of twenty (20%) percent (but not to exceed $3,000,000) of the bid price shall be mailed to the address listed in block 8 of the SF1442 and be received at the address no later than the closing date and time. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for due date, will require rejection of the proposal in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then. SEE FAR Provision 52.228-1, Bid Guarantee, of this Solicitation. Electronic copies of the proposals will be time/date stamped by Microsoft Outlook upon receipt of email. Further details on electronic submission are outlined below.
Proposals shall be received by 2:00 P.M. Mountain Time on April 3rd, 2023. There will be no public opening of the proposals. Submit proposals to: Jared.Detton@va.gov.
Submit bid bonds to:
Department of Veterans Affairs
NCO 19
ATTN: Jared Detton 6162 S Willow Dr., Ste 300 Greenwood Village, CO 80111
Past performance information and price sections of the offeror’s proposal will be evaluated independently. Offerors shall include all required Representations and Certifications and complete their registration in System for Award Management (SAM). See FAR 52.204-7 and 52.204-8, of this solicitation.
Important Notice: Apparent successful offerors must apply for and receive verification from the Department of Veterans Affairs Center for Verification and Evaluation (CVE) in accordance with 38 CFR Part 74 and VAAR 819.70 by submission of documentation of Veteran status, ownership and control enough to establish appropriate status. Offerors must be both VISIBLE and VERIFIED by the Department of Veteran Affairs CVE at the time of offer submission. Failure to be both VERIFIED by CVE and VISIBLE on VetBiz at the time of offer submission and contract award will result in the offeror’s proposal being deemed non-compliant. All offerors are urged to contact the CVE and submit the required documents to obtain CVE verification of their SDVOSB status if they have not already done so.
I.6B PROPOSAL REVISIONS
If it is determined to be necessary, proposal revisions will be requested from the offers received. The Contracting Officer may identify those offerors, whose proposals are within the competitive range based upon the selection criteria identified in this solicitation. Negotiations may be conducted with those firms falling within the competitive range, after which proposal revisions may be requested. Offerors submitting proposal revisions will not be required to re-submit any documents which are unchanged from their proposals. They should provide necessary changes to individual paragraphs, as briefly as possible, together with the Table of Contents that clarifies where within the initial proposal the additional information and/or changed document would be placed. A new bid bond shall be submitted only if the final cost proposal revisions are greater than its initial cost proposal.
1.7B REQUIREMENTS FOR ELECTRONIC SUBMISSION OF OFFER
Unless paper offers are specifically authorized in an individual solicitation, all responses to solicitations must be submitted electronically as described below. Responses submitted in a paper form are unacceptable. Failure to comply with this requirement may jeopardize the possibility of receiving an award for the contract due to noncompliance with the terms of the solicitation. You must submit your electronic offer, and any supplemental information (such as spreadsheets, backup data, technical information), using any of the electronic formats and media described below.
In addition, contractors are notified of the award via an electronic Notice of Award e-mail. The award document will be attached to the Notice of Award e-mail.
Acceptable Electronic Formats (Software) for Submission of Offers
1. Files readable using the current Microsoft© Office version Products: Word, Excel, PowerPoint, or Access. Please see security note below for caution regarding use of macros. When submitting construction drawings contractors are required to submit one set in AutoCAD and one set in Adobe PDF. (purpose: contracting can open the PDF version and engineering can open AutoCAD files).
2. Files in Adobe© PDF (Portable Document Format) Files: When scanning documents scanner resolution should be set to 200 dots per inch, or greater.
3. Another electronic format. If you wish to submit an offer using another format other than described in these instructions, e-mail the Contracting Officer who issued the solicitation. Please submit your request at least ten (10) calendar days before the scheduled closing date of the solicitation. Request a decision as to the format acceptability and make sure you receive approval of the alternate format before using it to send your offer.
4. Please note that we can no longer accept .zip files due to increasing security concerns.
E-mail Submission Procedures: For simplicity in this guidance, all submissions in response to a solicitation will be referred to as offers.
a. Subject Line: Include the solicitation number, name of company, and closing date of solicitation. Use only one of the terms Quotation, Offer, Proposal, or Bid depending on the solicitation type.
b. Size: Maximum size of the e-mail message shall not exceed five (5) megabytes. Only one email is permitted unless otherwise stated in this solicitation or in writing by the Contract Officer submitting the solicitation.
c. Unless approved by the contracting officer: DO NOT submit a link to your PDF documents. Please submit your request in an email for other electronic format at least ten (10) calendar days before the scheduled closing date of the solicitation. Request a decision as to the format acceptability and ensure you receive approval of the alternate format before using it to send your offer.
Each electronic offer must also include a signed and scanned SF-1442, Solicitation, Offer, and Award (Construction, Alteration, or Repair)
The Microsoft Outlook © Email time/date stamp will be used to date and time stamp offers for the official record of receipt for the submission. The date and time stamp in recipient’s “inbox” is the official record of receipt.
Security Issues, Late Bids, Unreadable Offers
1. Late submission of offers is outlined at FAR 52.215-1(c)(3). Particular attention is warranted to the portion of the provision that relates to the timing of submission.
2. Please see FAR 15.207(c) for a description of the steps the Government shall take with regard to unreadable offers.
3. To avoid rejection of an offer, vendors must make every effort to ensure their electronic submission is virus-free. Submissions or portions thereof submitted and which the automatic system detects the presence of a virus or which are otherwise unreadable will be treated as “unreadable” pursuant to FAR 15.207(c).
4. The virus scanning software used by our e-mail systems cannot always distinguish a macro from a virus. Therefore, sending a macro embedded in an e-mail message or an e-mail attachment may cause the e-mail offer to be quarantined. You may send both the spreadsheet and the spreadsheet saved in PDF format to ensure that your proposal is readable.
5. Password protecting your offer is not permitted. The Contracting Officer will file the offer electronically which will allow access only by designated individuals.
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.4 52.233-2 SERVICE OF PROTEST (SEP 2006)
Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from: