Z2DA--MCC Panel BF118 and ATS Replacement

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C25924R0103
Agency
Veterans Integrated Service Network 19 Veterans Health Administration, Department of Veterans Affairs
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
238210 Electrical Contractors and Other Wiring Installation Contractors
PSC
Z2DA Repair Or Alteration Of Hospitals And Infirmaries
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Veterans Health Administration (VA VISN 19) is seeking electrical contractors to replace the Motor Control Center (MCC) Panel BF118 and Automatic Transfer Switch (ATS) at the Oklahoma City VA Medical Center. The solicitation requires a contractor to provide comprehensive labor, equipment, materials, and supervision to remove the existing 480V, 600A, 3-phase, 3-wire Motor Control Center and install a new 480V, 600A, 3-phase, 4-wire Motor Control Center, along with a new 600A, 4-pole Automatic Transfer Switch. Proposals must be submitted by July 26, 2024, at 2:00 PM Central Time, with evaluation likely focusing on past performance, technical capabilities, and compliance with VA specifications. The contractor must develop a detailed project schedule, submit shop drawings, follow stringent safety requirements, and provide operations and maintenance manuals. Contractors will be expected to execute the work with minimal disruption to the Medical Center's ongoing operations.

The solicitation is 100% set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with the project magnitude estimated between $500,000 and $1,000,000. The work will be performed at Building 100 of the Oklahoma City VA Medical Center, with specific requirements for phased implementation and temporary power management during the transition. Contractors must adhere to strict ICRA (Infection Control Risk Assessment) containment protocols, with maximum shutdown periods limited to 30 minutes to 1 hour for power transfers. The project will require a minimum 2-week notification prior to any system shutdowns and must maintain continuous medical facility operations. Contractors will be provided a designated lay-down and staging area, and must submit comprehensive plans for construction fencing, power transfer, and operational continuity. The VA will provide the existing MCC panel equipment to be replaced, and the contract is subject to the availability of funds.

Notice text

2 versions

Update #2 · Latest ·

MCC Panel BF118 and ATS Replacement

Update #1 ·

635-21-118 | MCC Panel BF118 and ATS Replacement

Attachments

Files attached to this notice, newest first
File Type Posted
round two questions.pdf PDF
36C25924R0103 0003.docx DOCX document
36C25924R0103 0002.docx DOCX document
635-21-118_100 CD Specifications.pdf PDF
36C25924R0103 0001.docx DOCX document
36C25924R0103_1.docx DOCX document
S02-3-10-2021 Past Performance Questionnaire_Blank_Fillable PDF.pdf PDF
S22- 852.219-75 LOS Certification.docx DOCX document
00_Combined.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Z2DA--635-21-118 MCC Panel BF118 and ATS Replacement Award Award Notice
Z2DA--MCC Panel BF118 and ATS Replacement This notice · Latest solicitation Solicitation
Z2DA--MCC Panel BF118 and ATS Replacement Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity