Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 36C25226B0003
- Agency
- Veterans Integrated Service Network 12 Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- Points of contact
-
- Donita Grace donita.grace@va.gov (414) 844-4860
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 12, through the Great Lakes Acquisition Center, is soliciting sealed bids for construction services to upgrade facility generator controls at Oscar G Johnson VA Medical Center in Iron Mountain, Michigan (Solicitation 36C25226B0003, Project 585-25-103). The project involves upgrading control systems for three existing Cummins 1250kW diesel generators by installing modernized PCC3.3 Controllers, replacing the legacy Digital Master Controller with a Cummins DMC 8000, installing new control wiring to medium voltage switchgear, upgrading fifteen communication cards in existing facility automatic transfer switches, and providing a temporary 480V generator (1000kW minimum) with step-up transformer to maintain backup power during upgrades. The contract is classified as NAICS 238210 (Electrical Contractors and Other Wiring Installation Contractors) and is open to full and open competition with no set-aside restrictions. Award will be made to the responsible bidder submitting the lowest responsive bid based on a firm-fixed-price evaluation. Critical deadlines include a Request for Information deadline of March 10, 2026 at 3:00 p.m. CST, a mandatory pre-bid conference on February 25, 2026 at 10:00 a.m. CST at the facility, and a final proposal due date of March 26, 2026 at 1:00 p.m. CST.
The procurement carries an estimated contract value range of $1,000,000 to $2,000,000 and is not restricted to any particular business set-aside category. The project performance period spans 430 calendar days from the Notice to Proceed, with work phased over approximately 90 days for submittals and scheduling (Phase 0) and 340 calendar days for equipment lead time, demolition, and construction (Phase 1). Contractors must submit a bid guarantee of at least 20 percent of the bid price not to exceed $200,000, and the awarded contractor must furnish performance and payment bonds equal to the contract value. The work must comply with prevailing wage rate requirements as established in Michigan General Decision wage determination MI20260117 and must adhere to Buy American domestic preference requirements for construction materials, with all work performed at the Oscar G Johnson VA Medical Center located in Iron Mountain, Michigan. All contractor inquiries must be directed in writing to Contracting Officer Donita Grace at Donita.Grace@va.gov, with the Great Lakes Acquisition Center located at 115 S. 84th Street, Suite 101, Milwaukee, WI 53214-1476.
Notice text
6 versions
Update #6 · Latest ·
SOLICITATION 36C25226B0003
AMENDMENT A0002
March 17, 2026
Project: Upgrade Facility Generator Construction
Project Number: 585-25-103
Location: Oscar G Johnson VAMC Hospital
Amendment 0002 hereby incorporates the following clarifications/change(s) into the solicitation package.
RFI Questions
RFI Response - Upgrade Facility Generator Construction
36C25226B0003
585-25-103
Date
CONTRACTOR QUESTION
REFERENCE
VA RESPONSE
2/16/2026
Clarification on the period of performance time length from the NTP
Information on Bid Schedule is correct. (430 calendar days from NTP)
2/18/2026
After review with MJE chief engineer there is some concern using a Delta to Wye stepdown transformer as a step-up transformer. Using this configuration would create an un-grounded 13.8KV Delta source. This would appear to not be equipped with code-required monitoring. Would a Wye to Wye transformer be an acceptable alternate? This would allow the 13.8KV side of the transformer to be grounded at H0. These also are more commonly available for rental.
Drawing EP101, Keynote 16, specifies 3 - #3/0 15kV MV cables, shielded with concentric neutrals to be used in addition to a #3 THHN EGC. The tape shields on the #3/0 cables provide a grounding path for bonding between equipment the Generator 13.8KV switchgear as well as the transformer. Fault current clears through the primary side (480V) system which would be the primary path for fault clearance from the generator. All tape shields and ground conductors from both primary and secondary sides will be bonded at the transformer ground and ultimately also bonded to the XO of the primary wye. A fault clears through the primary wye connected to the temp generator breaker. Keynote 21 requires a ¾ x 10 copper rod to be driven into the ground by the temporary transformer. The interior of the enclosure shall be bonded to this rod which would act as a redundant fault path.
If a Wye-to-Wye transformer is more readily available, it is acceptable. Please note that the switchgear is configured in Delta, so there is no neutral bus in the switchgear, only a ground bus. The concentric neutrals and tape shields would then be bonded to the switchgear ground bus and transformer high side XO.
2/19/2026
In the solicitation there is no box checked under VAAR 852.219-75. Is this solicitation for General Construction or Special Trade Construction (or Services)? The major materials for this solicitation are specified, but their origin is unknown. Could the Contracting Officer please list the applicable excepted materials, or indicate None per FAR 52.225-9? Â
852.219-75 page 27 52.225-9 Page 19
Page 27 Inserted "X"
Page 19 Inserted "None"
See attachments
3/10/2026
In Part 2, it states that the Cummins equipment required for the controls upgrade includes, but is not limited to, a new Cummins Power Group Digital Master Control 8000 enclosure with associated hardware, Cummins DMC 8000 Version 3.3 system network controls software, Cummins DMC 8000 Version 3.3 generator controllers with cabinets, and Cummins Automatic Transfer Switch network communication cards.
We intend to quote ComAp controls for both the generators and the DMC, so I want to confirm whether non Cummins controllers will be accepted as part of the bid.
Lastly, to ensure an accurate proposal, we would like to perform a brief site visit to gather some additional information. Would it be possible to have a technician stop by on Monday in the late morning?
The phrase "is not limited to" is included because there may be additional Cummins equipment required to complete the project than what is listed. It does not mean that equipment from additional manufacturers is authorized.
No, additional site visits will be scheduled at this time.
Bid Opening Time Changed: (Date remains unchanged)
PROPOSAL DUE DATE / TIME: MARCH 26, AT 2:00 P.M. CST.
Great Lakes Acquisition Center (GLAC)
115 S. 84th Street, Suite 101
Milwaukee, WI 53214-1476
ALL QUESTIONS REGARDING THIS SOLICITATION SHALL BE SENT TO THE FOLLOWING INDIVIDUALS:
Donita Grace -- Donita.Grace@va.gov
All bidders are responsible for monitoring and downloading any amendments from Contract Opportunities at the following website: https://sam.gov/content/opportunities
Contractors shall ensure all amendments are acknowledged on Page 2 of the SF-1442.
Update #5 ·
SOLICITATION 36C25226B0003 AMENDMENT A0001 February 18, 2026 Project: Upgrade Facility Generator Construction Project Number: 585-25-103 Location: Oscar G Johnson VAMC Hospital Amendment 0001 hereby incorporates the following clarifications/change(s) into the solicitation package. Site Visit Date/Time 2nd SITE VISIT SCHEDULED: The pre-bid conference will take place on Wednesday, February 25, 2026, CST @ 10:00am. at Oscar G Johnson VA Hospital - B077 Engineering Conference room. Question: On the bid form the period of performance is 180 days after NTP, on the bid schedule the period of performance is 430 days after NTP. Response: Clarification - 430 calendar days from the NTP RFIs date Extended: due no later than 3:00 pm local CST, March 10, 2026 Bid Opening Date extended from 3/17/2026 to: PROPOSAL DUE DATE / TIME: MARCH 26, AT 1:00 P.M. CST. Great Lakes Acquisition Center (GLAC) 115 S. 84th Street, Suite 101 Milwaukee, WI 53214-1476 ALL QUESTIONS REGARDING THIS SOLICITATION SHALL BE SENT TO THE FOLLOWING INDIVIDUALS: Donita Grace -- Donita.Grace@va.gov All bidders are responsible for monitoring and downloading any amendments from Contract Opportunities at the following website: https://sam.gov/content/opportunities Contractors shall ensure all amendments are acknowledged on Page 2 of the SF-1442.
Update #4 ·
SOLICITATION 36C25226B0003 AMENDMENT A0001 February 18, 2026 Project: Upgrade Facility Generator Construction Project Number: 585-25-103 Location: Oscar G Johnson VAMC Hospital Amendment 0001 hereby incorporates the following clarifications/change(s) into the solicitation package. Site Visit Date/Time 2nd SITE VISIT SCHEDULED: The pre-bid conference will take place on Wednesday, February 25, 2026, CST @ 10:00am. at Oscar G Johnson VA Hospital - Signs will be posted RFI Question: On the bid form the period of performance is 180 days after NTP, on the bid schedule the period of performance is 430 days after NTP. Response: Clarification - 430 calendar days from the NTP RFIs date Extended: due no later than 3:00 pm local CST, March 10, 2026 Bid Opening Date extended from 3/17/2026 to: PROPOSAL DUE DATE / TIME: MARCH 26, AT 1:00 P.M. CST. Great Lakes Acquisition Center (GLAC) 115 S. 84th Street, Suite 101 Milwaukee, WI 53214-1476 ALL QUESTIONS REGARDING THIS SOLICITATION SHALL BE SENT TO THE FOLLOWING INDIVIDUALS: Donita Grace -- Donita.Grace@va.gov All bidders are responsible for monitoring and downloading any amendments from Contract Opportunities at the following website: https://sam.gov/content/opportunities Contractors shall ensure all amendments are acknowledged on Page 2 of the SF-1442.
Update #3 ·
SOLICITATION 36C25226B0003
AMENDMENT A0001
February 18, 2026
Project: Upgrade Facility Generator Construction
Project Number: 585-25-103
Location: Oscar G Johnson VAMC Hospital
Amendment 0001 hereby incorporates the following clarifications/change(s) into the solicitation package.
Site Visit Date/Time
2nd SITE VISIT SCHEDULED:
The pre-bid conference will take place on Wednesday, February 25, 2026, CST.Â
At Oscar G Johnson VA Hospital - Signs will be posted
RFI Question: On the bid form the period of performance is 180 days after NTP, on the bid schedule the period of performance is 430 days after NTP.
Response: Clarification - 430 calendar days from the NTP
RFIs date Extended: due no later than 3:00 pm local CST, March 10, 2026
Bid Opening Date extended from 3/17/2026 to:
PROPOSAL DUE DATE / TIME: MARCH 26, AT 1:00 P.M. CST.
Great Lakes Acquisition Center (GLAC)
115 S. 84th Street, Suite 101
Milwaukee, WI 53214-1476
ALL QUESTIONS REGARDING THIS SOLICITATION SHALL BE SENT TO THE FOLLOWING INDIVIDUALS:
Donita Grace -- Donita.Grace@va.gov
All bidders are responsible for monitoring and downloading any amendments from Contract Opportunities at the following website: https://sam.gov/content/opportunities
Contractors shall ensure all amendments are acknowledged on Page 2 of the SF-1442.
Update #2 ·
ATTACHMENTS
Update #1 ·
ATTACHMENTS
Attachments
| File | Type | Posted |
|---|---|---|
| S05 - Att 1_36C25226B0003_3 RFI Updates.pdf | ||
| 36C25226B0003 0002.docx | DOCX document | |
| S06 - 36C25226B0003 A0001.docx | DOCX document | |
| S06 - 36C25226B0003 A0001.docx | DOCX document | |
| 36C25226B0003 0001.docx | DOCX document | |
| S02 - Att5 JA 585-25-103 - Redacted.pdf | ||
| S02 - Att4 Wage Rate MI20260117_1.2.26.pdf | ||
| S02 - Att3 Final SOW - 585-25-103.docx | DOCX document | |
| S02 - Att2 Combined Bid Spec -585-25-103.pdf | ||
| S02 - Att1 Combined Bid Drawings - 585-25-103.pdf | ||
| 36C25226B0003_3.docx | DOCX document |
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction (VA-26-00020767) | Award Notice | |
| Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction | Solicitation | |
| Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction | Pre-Solicitation | |
| Z1DA--Upgrade Facility Generator Controls Construction 585-25-103 | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity