S02 - Att3 Final SOW - 585-25-103.docx

DOCX document 31 KB Posted

Attached to
Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction Federal contract opportunity
Solicitation number
36C25226B0003
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This is a Statement of Work (SOW) for a construction project to upgrade the facility generator control systems at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan. The project (585-25-103) requires contractors to upgrade the control system for three Cummins 1250kW diesel-powered generators by installing modernized PCC3.3 Controllers at each unit, replacing the legacy Digital Master Controller (DMC) with Cummins' modern DMC 8000, and installing new control wiring to the MV switchgear. The contractor must also provide a temporary 480V generator (1000kW minimum) and 480V/13.8kV step-up transformer to maintain backup power availability during the upgrade work, and upgrade and program fifteen communication cards in existing facility Automatic Transfer Switch (ATS) units for compatibility with the DMC8000 V3.3 software.

The contractor is responsible for furnishing all labor, superintendence, materials, tools, equipment, transportation, licenses, certificates, insurance, temporary protection, and other items necessary to complete the project as detailed in the contract specifications and drawings. The period of performance is 430 calendar days from the Notice to Proceed (NTP). The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 12, under Solicitation Number 36C25226B0003, and includes references to project specifications, project drawings, and infection control requirements as attachments to the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction, newest first.
File Type Posted
S05 - Att 1_36C25226B0003_3 RFI Updates.pdf PDF
36C25226B0003 0002.docx DOCX document
S06 - 36C25226B0003 A0001.docx DOCX document
S06 - 36C25226B0003 A0001.docx DOCX document
36C25226B0003 0001.docx DOCX document
S02 - Att5 JA 585-25-103 - Redacted.pdf PDF
S02 - Att1 Combined Bid Drawings - 585-25-103.pdf PDF
36C25226B0003_3.docx DOCX document
S02 - Att4 Wage Rate MI20260117_1.2.26.pdf PDF
S02 - Att2 Combined Bid Spec -585-25-103.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Upgrade Facility Generator Controls 585-25-103

VAMC IRON MOUNTAIN, MI 11 September 2025

Project Data PROJECT TITLE: Upgrade Facility Generator Controls

PROJECT NO: 585-25-103

PROJECT LOCATION: Oscar G. Johnson VA Medical Center, Iron Mountain, MI

SCOPE OF WORK

This project includes upgrading the control system for three (3) Cummins 1250kW diesel powered generators. This entails installing modernized PCC3.3 Controllers at each generator, replacing the legacy Digital Master Controller (DMC) with Cummins’ modern DMC 8000, and installing new control wiring to the MV switchgear. A temporary 480V generator (1000kW minimum) and 480V/13.8kV step up transformer will be needed to maintain backup power availability to the Facility. Additionally, to complete the upgrade to the DMC8000 V3.3 software, fifteen (15) communication cards in existing facility ATS units will need to be upgraded and programmed for operation.

The contractor shall provide for and furnish all labor, superintendence, materials, tools, equipment, transportation, licenses, certificates, insurance, temporary protection, and other items required under the provisions of this project – Upgrade Facility Generator Controls, Project # 585-25-103, at the Oscar G. Johnson VA Medical Center located in Iron Mountain, Michigan as outlined in the contract specifications and as shown on the contract drawings.

Period of Performance will be 430 calendar days from the Notice to Proceed (NTP)

Attachments:

· Project Specifications

· Project Drawings

· Infection Control Requirements