Z1DA--554-21-700 - EHRM Infrastructure Upgrades (Const) Denver, CO (PCAC) (VA-22-00042625)

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C77622B0051
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks proposals for infrastructure upgrades at the Department of Veterans Affairs Medical Center in Denver, Colorado. Solicitation number 36C77622B0051 was issued by the VA Technology Acquisition Center in Austin, Texas, and seeks offers for Z1DA--554-21-700 - EHRM Infrastructure Upgrades (Const) Denver, CO (PCAC) (VA-22-00042625). The scope of work involves upgrading electrical, HVAC, plumbing and IT systems at various buildings on the medical center campus. Offerors must have experience performing similar construction and infrastructure upgrade projects. Proposals were initially due by October 17, 2022 but have been extended to January 13, 2023. Award is anticipated by February 10, 2023 and will be a firm-fixed price contract.

The solicitation is set aside for verified service-disabled veteran-owned small businesses. The primary NAICS code is 238210 for electrical contractors and the predominate PSC code involves construction of buildings. The place of performance is the Denver VA Medical Center located at 1055 Clermont Street in Denver, Colorado. The period of performance is 365 calendar days with a total budget estimated between $5-10 million. Multiple amendments have provided additional documentation, extended deadlines, and outlined pre-bid site visit requirements.

Notice text

8 versions

Update #8 · Latest ·

Extend IFB Due Date to Monday, October 17,2022 11:00 MDT.

To provide the Teams Meeting Phone number for the bid opening scheduled October 17, 2022, at 11:00 MDT: 1:00 PM EST

Microsoft Teams meeting

Join on your computer or mobile app

Meeting ID: 236 865 873 853

Passcode: Zdk8sa

Or call in (audio only) +1 205-235-3524,,663969821#Â United States, Birmingham

Phone Conference ID: 663 969 821#

Update #7 ·

See attached pdf site visit rosters.

Pre-Bid Walk Attendance 081622

Pre-Bid Walk Attendance 091622

End of Document

Update #6 ·

5. PROJECT NUMBER (if applicable) CODE 7. ADMINISTERED BY 2. AMENDMENT/MODIFICATION NUMBER CODE 6. ISSUED BY 8. NAME AND ADDRESS OF CONTRACTOR 4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE 9A. AMENDMENT OF SOLICITATION NUMBER 9B. DATED PAGE OF PAGES 10A. MODIFICATION OF CONTRACT/ORDER NUMBER 10B. DATED BPA NO. 1. CONTRACT ID CODE FACILITY CODE CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers E. IMPORTANT: is extended, (a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended. 12. ACCOUNTING AND APPROPRIATION DATA (REV. 11/2016) is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. 15C. DATE SIGNED B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: D. OTHER Contractor 16C. DATE SIGNED 14. DESCRIPTION OF AMENDMENT/MODIFICATION 16B. UNITED STATES OF AMERICA Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. 15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER 15B. CONTRACTOR/OFFEROR STANDARD FORM 30 PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) (Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.) (If required) (SEE ITEM 11) (SEE ITEM 13) (X) CHECK ONE 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT (Signature of person authorized to sign) (Signature of Contracting Officer) 1 10 0004 9-16-2022 554-21-700 36C776 Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 00076 Department of Veterans Affairs Program Contract Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 To all Offerors/Bidders 36C77622B0051 X X X 1 X 1 The purpose of this amendment is to provide responses to technical questions, provide associated drawings, and site visit information . . All other terms and conditions remain the same Samantha Mihaila Contracting Officer Page 10 of 10 36C776-22-AP-1581 554-21-700 RMRVAMC EHRM Upgrades Const Pre-Bid RFI Answers and Addendum Items Addendum and Pre-bid RFI s (as submitted), with answers/additions in bold red. Additional Site Visit Information is listed on page 8. The following list of revised drawings is provided with explanation: 1-CBS-A1.0 Revision showing removing VCT, leveling floor, adding epoxy coating to the floor. 10-CBS-M1.4 Revised to show new BAS style humidistats and wiring to existing controllers. 10-CBS-M1.5 Revised to show new BAS style humidistats and wiring to existing controllers. 10-CBS-M1.6 Revised to show new BAS style humidistats and wiring to existing controllers. 10-CBS-M1.7 - Revised to show new BAS style humidistats and wiring to existing controllers. 2-RES-E1.1 Added keyed notes to plan that were missing. 10-CBS-E1.7 - removing static grid requirements. 2 A technical question came in regarding the ACT / grid removal Will the contractor be able to remove the ACT / grid during normal work hours so heat pump can be replaced during off hours or Will that work have to be done outside of normal hours in conjunction with the heat pump work. ACT/grid work may be performed during the day; however, ceiling opening is not allowed to be larger than 2 tiles (unless inside ICRA containment), therefore as ACT/grid is removed, the opening will have to be systematically closed with a plastic barrier/tape.  This condition (grid/tile removed and replaced w/ plastic) is only allowed immediately before/after the mechanical work.   Need more direction on what customer wants to be done for secondary DMARC. Drawing number 01-CON E 1.3 What is the scope of work for upgrading the facilities fiber throughout the buildings to each IT closet? SOW states this is to be done but the prints provided indicate that most comm rooms only require PDU and grounding upgrade. Is there missing prints, was the work completed or was this taken out of the SOW on a later date? The following phrase shall be stricken from the second paragraph of 2.0 SOW:  The project shall include but is not limited to, upgrading the facilities fiber throughout the buildings to each IT closet, provide a redundant fiber run throughout the facility to each IT closet, provide a new main fiber line coming into the building from the provider point   If equipment needs to be removed other than the existing PDU and UPS, is government, or contractor responsible for removal? RFI is unclear as to what potential equipment is being questioned.  Contractor is responsible for removal or removal & replacement of the equipment and items as specified in the scope/drawings/specs (heat pumps with fan coils, ACT/grid removal/replacement, replace PDUs etc.).  Any incidental work required to complete the specified work is included.     For the new 30-amp circuits. Is the requirement to install new 30-amp circuits with new conduit, then install new 30-amp UPS, cut over equipment to new 30-amp UPS from 20-amp UPS , and then demo old 20-amp circuits and conduit, or can a 20-amp UPS be taken down, demo 20-amp circuit, install new 30-amp circuit through existing conduit and install new 30-amp UPS and plug in equipment?  Just trying to understanding phasing requirements and if there can be selected down time for UPS while new circuit and new UPS are being installed utilizing existing conduits Contractor shall install A-side conduit, wiring and connections as specified for all locations. B-side re-use can be evaluated and negotiated on a case-by-case basis, post-award.      Question #1 - ROOM Q1-124 shows OCCUPANCY SENSOR, 180° CAMERA, DUAL FACTOR AUTHENTICATION PAC, are these to be included as the contractor scope? If so please provide system information, front end locations and POC for the specialty trades that maintain these system. Occupancy sensor can be omitted; camera and PACS are included. Basis of design for camera is Axis M4308-PLE Panoramic, and for PACS is Veridt Stealth Dual model PN 900W2036. Connection to be made within Q1-124. PACS software is Lenel OnGuard (HSPD-12 compliant). The video software is Milestone, which integrates with the OnGuard. Any new additions need to be compatible and incorporated with current system. Question #2 The new FCU s reflect the electrical circuit they are on. Can the VA provide the room number where each of the panels are located? 10-EQH13 is located in A1-203 10-EQH2 is located in A2-327A 10-EQH3 is located in A3-347A 10-EQH4 is located in A4-329   Question #3 - SECTION 09 65 19 refer to Section 09 06 00, SCHEDULE FOR FINISHES for Color, Pattern and Texture for Resilient Tile Flooring and Accessories. Can the VA provide this specification or the basis of design for the flooring/cove base needed? Sheet # 1-CBS-A1.0 is reissued with Aug 31, 2022, date for new instructions for finishes.  Question #4 The electrical drawing has the following general note:  AT ALL CABINETS WITH DOORS, PROVIDE A BONDING JUMPER BETWEEN CABINET & DOOR. The drawings do not indicate which cabinets have doors. Can the VA provide this information? There are 10 total cabinets that require bonding jumpers, all in telecom rooms in Bldg. A.   Question #5 Drawing sheet 2-RES E1.1 does not have specific notes for each room as the other sheets do. Can the VA provide these notes? Sheet # 2-RES-E1.1 is reissued with Aug 31,2022 date indicating keyed notes for each room   Question #6 Many of the drawing sheets has a General Note stating to see Detail 1 for equipment and wiring configuration on sheet 13-E1.1. I doesn t appear this sheet was provided. Can the VA provide this detail? Contractor to observe the General Note on existing plans sheets for Detail 1 on 13-E1.1 to reference information located on sheet 13-PVS-E1.1 (upper right of sheet)  Question #7 Just to confirm there is no horizontal cabling and or data outlets requirements for this project correct? This is not otherwise clearly specified; however, the following is REQUIRED: Horizontal cabling is required in Bldg10(CBS/Bldg.).  All existing building data cabling to be replaced with Cat6A; 48-port patch-panels in telecom rooms to be replaced with Cat6A compatible (78 total).  Additional drawings 10-TA-301 through 304 are provided for reference to give bidders an idea of building layout/function, however some ports have been added/reconfigured since these drawings.  Contractor can expect to provide approximately 3600 total runs.  Cabling exits the telcom-room via fire rated penetration, generally runs via J-hook to/from cable tray spine and enters walls via existing conduit (conduit to remain.   No conduit installation/removal included in this scope) or power poles.  Contractor to terminate all connections in/provide new stainless 2/4/6 port labeled stainless faceplates (picture below).  Contractor required to test, label, and certify all cabling per VA naming convention (i.e., A1-345 D1-23/24). All replaced cabling to be demo ed (can be used to pull new) and disposed of by contractor. All work for this scope to be accomplished during regular business hours. Question #8 The HVAC notes state to EXISTING HEAT PUMP. RE-USE EXISTING DUCTING, POWER, CONTROLS, AND CONDENSATE PIPING AS POSSIBLE. Can the VA confirm that any modifications to extend power and/or communication (BMS) raceways in order to install the new FCUs is the responsibility of the contractor? Confirmed   Question #9 The HVAC demo notes say to re-use controls. The existing controllers on the existing HP s are obsolete, can the VA confirm we are to provide new controllers and if so are they to be The FCU s will be controlled by external Metasys controllers? If the existing controllers cannot be reused, replace with BACnet controller.  Can be stand-alone / does not have to be programed into building automation system, as a follow-on project will convert the entire building controls.    Question #10 Reference Drawing 10-CBS M 0.1/ details 4 &5. The equipment schedule for the new FCUs appear to all be the same. Can the VA clarify which of the FCUs have 2-WAY PRESSURE INDEPENDENT CONTROL VALVE and which have 3-WAY PRESSURE INDEPENDENT CONTROL VALVE? There is no Detail 5 on this page.  All FCU shall be 2-way per Detail 4.  Detail 3 shall be ignored.   Question #11 Reference SOW document.   The project shall include but is not limited to, upgrading the facilities fiber throughout the buildings to each IT closet, provide a redundant fiber run throughout the facility to each IT closet, provide a new main fiber line coming into the building from the provider point Can the VA clarify the extent of fiber work required as there is no riser diagram that indicates a redundant fiber run throughout the facility as described in the SOW above? Per question above, this statement shall be stricken from the SOW    The SOW states to upgrade the facilities fiber throughout the buildings to each IT closet, provide a redundant fiber run throughout the facility to each IT closet, provide a new main fiber line coming into the building from the provider point , although the drawings do not reflect that. Can a drawing be made available to reflect what is stated in the drawings?   Per question above, this statement shall be stricken from the SOW VA issued Addendum item to SOW: #1 - Contractor to provide new Johnson Controls humidity sensor model NS-AHB7003-0, or equivalent with BacNet MSTP capabilities, and to install at every TR shown in Electrical Plans.  New sensor to be added via network inside each room, integrated into existing BAS, commissioned by the Contractor, and added to front end operator graphics.  At Contractor option, provide combination temp sensor/humidity sensor that will display both at sensor, and replace existing temperature sensor at each TR location shown on Electrical Plans.  Add humidity sensors to all CBS building TR locations (total of 8), on new junction box, conduit connecting new humidity sensor to new fan coil, and integrate to existing controller.  If existing CBS controller does not accept BacNet MSTP network, add sensor to existing universal or analog port on each controller, and add to existing graphics interface for that building.  Contractor to provide BacNet capable network wiring from new humidistat and installed in CBS building to each new fan coil and include a 10 service loop for future installation if network is not being used initially.  No new plans are issued for this added scope of work, except to clarify new locations inside CBS building TR. #2 See answer to Question #7 above regarding Horizontal Cabling. This requirement is not otherwise specified. Additional Questions The following questions are in regards to the Denver EHRM Infrastructure Upgrades: Reference Attachment 00 SOW EHRM 554-21-700 Paragraph 2.0 Statement of Work: The project shall include but is not limited to, upgrading the facilities fiber throughout the buildings to each IT closet, provide a redundant fiber run throughout the facility to each IT closet, provide a new main fiber line coming into the building from the provider point, install additional IT outlets, install new electrical outlets throughout the facility, provide additional outlets in each IT closet, electrical UPS, Building Management System interfaces, assess for new and upgrades for existing HVAC and upgrade facility power distribution as required. Drawings do not show upgrading the facilities fiber throughout the building to each IT closet. Please provide drawings showing the new fiber pathways to each IT closet. Per question above, this statement shall be stricken from the SOW Per drawing 19 of 45 01-CON E 1.3 the redundant fiber line is existing please confirm the contractor is to disconnect the existing Demarc Device and re-run existing redundant fiber line to the new location of the relocated Demarc Device. The notes on 01-CON-E 1.3 that indicate Existing AT&T WAN Service Demarc Device relocated from/To GP-103A/CS-103 are stricken. These devices and the fiber connections do not require work under this contract. Please provide drawings showing the new main fiber line location and pathways through the buildings. Not Required. Please provide drawings showing the location and quantities of the additional IT outlets. Statement of work was prepared generically prior to the drawings. The drawings & specs and this addendum show/govern all required work. Please provide drawings showing the location and quantities of the new electrical outlets throughout the facility. Statement of work was prepared prior to the drawings. The drawings & specs and this addendum show/govern all required work Please provide the locations and quantities of the additional outlets in each IT closet. Statement of work was prepared prior to the drawings. The drawings & specs, and this addendum show/govern all required work Please provide detailed drawings showing the required facility power distribution upgrades. Statement of work was prepared prior to the drawings. The drawings & specs and this addendum show/govern all required work Please specify any required building management interfaces. See answers above. BAS is JCI-Metasys. Added scope requires humidity monitoring in every indicated telecom room connected and programmed into Metasys. HVAC controls scope for Building 10(A/CBS) indicated above. Please confirm the project drawings show the new upgrades for the existing facility HVAC. Confirmed Reference Attachment 00 SOW EHRM 554-21-700 Paragraph 3.0 General: VA reserves the right to reject a bid from a contractor who did not attend the pre-bid walkthrough. Will the VA consider issuing an additional site visit time and date to meet the SOW attendance requirement? An additional site visit will be held on September 21, 2022, 1:00 PM. The location is 1700 North Wheeling Street, Aurora, Co. 80045. Contractors shall meet at the north end of the main concourse outside of the patriot brew coffee shop. This is also outside of the concourse entry to Building K. Please provide the site visit sign-in sheet from August 3, 2022, 9AM. See below Will the VA be issuing an amendment with answers to contractor questions? See attached document: EHRM 554-21-700 - REV 1. See attached document: 10 -TA-301 - 304. End of Document

Update #5 ·

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the

offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY

is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not,

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter

or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to

the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print)

(Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign)

(Signature of Contracting Officer)

1

10

0004

9-16-2022

554-21-700

36C776

Department of Veterans Affairs

Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490

Independence OH 44131

00076

Department of Veterans Affairs

Program Contract Activity Central

6100 Oak Tree Blvd, Suite 490

Independence OH 44131

To all Offerors/Bidders

36C77622B0051

X

X

X

1

X

1

The purpose of this amendment is to provide responses to technical questions, provide associated drawings,

and site visit information

. .

All other terms and conditions remain the same

Samantha Mihaila

Contracting Officer

Page 10 of 10

36C776-22-AP-1581

554-21-700 RMRVAMC EHRM Upgrades Const

Pre-Bid RFI Answers and Addendum Items

Addendum and Pre-bid RFI s (as submitted), with answers/additions in bold red.

Additional Site Visit Information is listed on page 8.

The following list of revised drawings is provided with explanation:

1-CBS-A1.0 Revision showing removing VCT, leveling floor, adding epoxy coating to the floor.

10-CBS-M1.4 Revised to show new BAS style humidistats and wiring to existing controllers.

10-CBS-M1.5 Revised to show new BAS style humidistats and wiring to existing controllers.

10-CBS-M1.6 Revised to show new BAS style humidistats and wiring to existing controllers.

10-CBS-M1.7 - Revised to show new BAS style humidistats and wiring to existing controllers.

2-RES-E1.1 Added keyed notes to plan that were missing.

10-CBS-E1.7 - removing static grid requirements.

2 A technical question came in regarding the ACT / grid removal

Will the contractor be able to remove the ACT / grid during normal work hours so heat pump can be replaced during off hours or

Will that work have to be done outside of normal hours in conjunction with the heat pump work.

ACT/grid work may be performed during the day; however, ceiling opening is not allowed to be larger than 2 tiles (unless inside ICRA containment), therefore as ACT/grid is removed, the opening will have to be systematically closed with a plastic barrier/tape. This condition (grid/tile removed and replaced w/ plastic) is only allowed immediately before/after the mechanical work.

Â

Need more direction on what customer wants to be done for secondary DMARC. Drawing number 01-CON E 1.3

What is the scope of work for upgrading the facilities fiber throughout the buildings to each IT closet? SOW states this is to be done but the prints provided indicate that most comm rooms only require PDU and grounding upgrade. Is there missing prints, was the work completed or was this taken out of the SOW on a later date?

The following phrase shall be stricken from the second paragraph of 2.0 SOW:Â The project shall include but is not limited to, upgrading the facilities fiber throughout the buildings to each IT closet, provide a redundant fiber run throughout the facility to each IT closet, provide a new main fiber line coming into the building from the provider point

Â

If equipment needs to be removed other than the existing PDU and UPS, is government, or contractor responsible for removal?

RFI is unclear as to what potential equipment is being questioned. Contractor is responsible for removal or removal & replacement of the equipment and items as specified in the scope/drawings/specs (heat pumps with fan coils, ACT/grid removal/replacement, replace PDUs etc.). Any incidental work required to complete the specified work is included. Â

Â

For the new 30-amp circuits. Is the requirement to install new 30-amp circuits with new conduit, then install new 30-amp UPS, cut over equipment to new 30-amp UPS from 20-amp UPS , and then demo old 20-amp circuits and conduit, or can a 20-amp UPS be taken down, demo 20-amp circuit, install new 30-amp circuit through existing conduit and install new 30-amp UPS and plug in equipment? Â Just trying to understanding phasing requirements and if there can be selected down time for UPS while new circuit and new UPS are being installed utilizing existing conduits

Contractor shall install A-side conduit, wiring and connections as specified for all locations. B-side re-use can be evaluated and negotiated on a case-by-case basis, post-award.Â

Â

Â

Question #1 - ROOM Q1-124 shows OCCUPANCY SENSOR, 180° CAMERA, DUAL FACTOR AUTHENTICATION PAC, are these to be included as the contractor scope? If so please provide system information, front end locations and POC for the specialty trades that maintain these system.

Occupancy sensor can be omitted; camera and PACS are included. Basis of design for camera is Axis M4308-PLE Panoramic, and for PACS is Veridt Stealth Dual model PN 900W2036. Connection to be made within Q1-124. PACS software is Lenel OnGuard (HSPD-12 compliant). The video software is Milestone, which integrates with the OnGuard. Any new additions need to be compatible and incorporated with current system.

Question #2 The new FCU s reflect the electrical circuit they are on. Can the VA provide the room number where each of the panels are located?

10-EQH13 is located in A1-203

10-EQH2 is located in A2-327A

10-EQH3 is located in A3-347A

10-EQH4 is located in A4-329

Â

Question #3 - SECTION 09 65 19 refer to Section 09 06 00, SCHEDULE FOR FINISHES for Color, Pattern and Texture for Resilient Tile Flooring and Accessories. Can the VA provide this specification or the basis of design for the flooring/cove base needed?

Sheet # 1-CBS-A1.0 is reissued with Aug 31, 2022, date for new instructions for finishes.

 Question #4 The electrical drawing has the following general note: AT ALL CABINETS WITH DOORS, PROVIDE A BONDING JUMPER BETWEEN CABINET & DOOR. The drawings do not indicate which cabinets have doors. Can the VA provide this information?

There are 10 total cabinets that require bonding jumpers, all in telecom rooms in Bldg. A.

Â

Question #5 Drawing sheet 2-RES E1.1 does not have specific notes for each room as the other sheets do. Can the VA provide these notes?

Sheet # 2-RES-E1.1 is reissued with Aug 31,2022 date indicating keyed notes for each roomÂ

 Question #6 Many of the drawing sheets has a General Note stating to see Detail 1 for equipment and wiring configuration on sheet 13-E1.1. I doesn t appear this sheet was provided. Can the VA provide this detail?

Contractor to observe the General Note on existing plans sheets for Detail 1 on 13-E1.1 to reference information located on sheet 13-PVS-E1.1 (upper right of sheet)

 Question #7 Just to confirm there is no horizontal cabling and or data outlets requirements for this project correct?

This is not otherwise clearly specified; however, the following is REQUIRED:

Horizontal cabling is required in Bldg10(CBS/Bldg.). All existing building data cabling to be replaced with Cat6A; 48-port patch-panels in telecom rooms to be replaced with Cat6A compatible (78 total). Additional drawings 10-TA-301 through 304 are provided for reference to give bidders an idea of building layout/function, however some ports have been added/reconfigured since these drawings.  Contractor can expect to provide approximately 3600 total runs. Cabling exits the telcom-room via fire rated penetration, generally runs via J-hook to/from cable tray spine and enters walls via existing conduit (conduit to remain.  No conduit installation/removal included in this scope) or power poles. Contractor to terminate all connections in/provide new stainless 2/4/6 port labeled stainless faceplates (picture below). Contractor required to test, label, and certify all cabling per VA naming convention (i.e., A1-345 D1-23/24). All replaced cabling to be demo ed (can be used to pull new) and disposed of by contractor.

All work for this scope to be accomplished during regular business hours.

Question #8 The HVAC notes state to EXISTING HEAT PUMP. RE-USE EXISTING DUCTING, POWER, CONTROLS, AND CONDENSATE PIPING AS POSSIBLE. Can the VA confirm that any modifications to extend power and/or communication (BMS) raceways in order to install the new FCUs is the responsibility of the contractor?

Confirmed

Â

Question #9 The HVAC demo notes say to re-use controls. The existing controllers on the existing HP s are obsolete, can the VA confirm we are to provide new controllers and if so are they to be The FCU s will be controlled by external Metasys controllers?

If the existing controllers cannot be reused, replace with BACnet controller. Can be stand-alone / does not have to be programed into building automation system, as a follow-on project will convert the entire building controls.Â

Â

Question #10 Reference Drawing 10-CBS M 0.1/ details 4 &5. The equipment schedule for the new FCUs appear to all be the same. Can the VA clarify which of the FCUs have 2-WAY PRESSURE INDEPENDENT CONTROL VALVE and which have 3-WAY PRESSURE INDEPENDENT CONTROL VALVE?

There is no Detail 5 on this page. All FCU shall be 2-way per Detail 4. Detail 3 shall be ignored.

Â

Question #11 Reference SOW document.

Â

The project shall include but is not limited to, upgrading the facilities fiber throughout the buildings to each IT closet, provide a redundant fiber run throughout the facility to each IT closet, provide a new main fiber line coming into the building from the provider point

Can the VA clarify the extent of fiber work required as there is no riser diagram that indicates a redundant fiber run throughout the facility as described in the SOW above?

Per question above, this statement shall be stricken from the SOW

 Â

The SOW states to upgrade the facilities fiber throughout the buildings to each IT closet, provide a redundant fiber run throughout the facility to each IT closet, provide a new main fiber line coming into the building from the provider point , although the drawings do not reflect that. Can a drawing be made available to reflect what is stated in the drawings? Â

Per question above, this statement shall be stricken from the SOW

VA issued Addendum item to SOW:

#1 -

Contractor to provide new Johnson Controls humidity sensor model NS-AHB7003-0, or equivalent with BacNet MSTP capabilities, and to install at every TR shown in Electrical Plans. New sensor to be added via network inside each room, integrated into existing BAS, commissioned by the Contractor, and added to front end operator graphics. At Contractor option, provide combination temp sensor/humidity sensor that will display both at sensor, and replace existing temperature sensor at each TR location shown on Electrical Plans. Add humidity sensors to all CBS building TR locations (total of 8), on new junction box, conduit connecting new humidity sensor to new fan coil, and integrate to existing controller. If existing CBS controller does not accept BacNet MSTP network, add sensor to existing universal or analog port on each controller, and add to existing graphics interface for that building. Contractor to provide BacNet capable network wiring from new humidistat and installed in CBS building to each new fan coil and include a 10 service loop for future installation if network is not being used initially. No new plans are issued for this added scope of work, except to clarify new locations inside CBS building TR.

#2

See answer to Question #7 above regarding Horizontal Cabling. This requirement is not otherwise specified.

Additional Questions

The following questions are in regards to the Denver EHRM Infrastructure Upgrades:

Reference Attachment 00 SOW EHRM 554-21-700 Paragraph 2.0 Statement of Work: The project shall include but is not limited to, upgrading the facilities fiber throughout the buildings to each IT closet, provide a redundant fiber run throughout the facility to each IT closet, provide a new main fiber line coming into the building from the provider point, install additional IT outlets, install new electrical outlets throughout the facility, provide additional outlets in each IT closet, electrical UPS, Building Management System interfaces, assess for new and upgrades for existing HVAC and upgrade facility power distribution as required.

Drawings do not show upgrading the facilities fiber throughout the building to each IT closet. Please provide drawings showing the new fiber pathways to each IT closet. Per question above, this statement shall be stricken from the SOW

Per drawing 19 of 45 01-CON E 1.3 the redundant fiber line is existing please confirm the contractor is to disconnect the existing Demarc Device and re-run existing redundant fiber line to the new location of the relocated Demarc Device. The notes on 01-CON-E 1.3 that indicate Existing AT&T WAN Service Demarc Device relocated from/To GP-103A/CS-103 are stricken. These devices and the fiber connections do not require work under this contract.

Please provide drawings showing the new main fiber line location and pathways through the buildings. Not Required.

Please provide drawings showing the location and quantities of the additional IT outlets. Statement of work was prepared generically prior to the drawings. The drawings & specs and this addendum show/govern all required work.

Please provide drawings showing the location and quantities of the new electrical outlets throughout the facility. Statement of work was prepared prior to the drawings. The drawings & specs and this addendum show/govern all required work

Please provide the locations and quantities of the additional outlets in each IT closet. Statement of work was prepared prior to the drawings. The drawings & specs, and this addendum show/govern all required work

Please provide detailed drawings showing the required facility power distribution upgrades. Statement of work was prepared prior to the drawings. The drawings & specs and this addendum show/govern all required work

Please specify any required building management interfaces. See answers above. BAS is JCI-Metasys. Added scope requires humidity monitoring in every indicated telecom room connected and programmed into Metasys. HVAC controls scope for Building 10(A/CBS) indicated above.

Please confirm the project drawings show the new upgrades for the existing facility HVAC. Confirmed

Reference Attachment 00 SOW EHRM 554-21-700 Paragraph 3.0 General: VA reserves the right to reject a bid from a contractor who did not attend the pre-bid walkthrough.

Will the VA consider issuing an additional site visit time and date to meet the SOW attendance requirement? An additional site visit will be held on September 21, 2022, 1:00 PM. The location is 1700 North Wheeling Street, Aurora, Co. 80045. Contractors shall meet at the north end of the main concourse outside of the patriot brew coffee shop. This is also outside of the concourse entry to Building K.

Please provide the site visit sign-in sheet from August 3, 2022, 9AM. See below

Will the VA be issuing an amendment with answers to contractor questions?

See attached document: EHRM 554-21-700 - REV 1.

See attached document: 10 -TA-301 - 304.

End of Document

Update #4 ·

All other Terms and Conditions remain the same.

End of Document

Update #3 ·

All other terms and conditions remain the same

Update #2 ·

See SF30 Box 14

Update #1 ·

See attachment 00 SOW

Files

Show all 23

Notice history

Notice Type Posted
Z1DA--36C77623C0004 - EHRM Upgrade - Denver Faith Enterprises, Inc. Award Award Notice
This notice Latest solicitation Solicitation
Z1DA--554-21-700 - EHRM Infrastructure Upgrades (Const) Denver, CO (PCAC) (VA-22-00042625) Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
613-22-700 | EHRM Infrastructure Upgrades Construction | Martinsburg, WV West Virginia 25405, United States · NAICS 236220 VA Technology Acquisition Center No set-aside
Y1DA--561-26-103 Upgrade Electrical and Plumbing in Building 18B East Orange, New Jersey 07018, United States · NAICS 236220 Veterans Integrated Service Network 2 Service-Disabled Veteran-Owned Small Business
Y1DA--512A5-22-700 | EHRM Infra Upgrades | Perry Point, MD CO: Samantha Mihaila CS: Ric Sochor Perry Point Vamc · NAICS 236220 VA Technology Acquisition Center Service-Disabled Veteran-Owned Small Business
554-27-117 Conduct Concrete and Civil Site Repairs. Aurora, Colorado 80045, United States · NAICS 238110 Veterans Integrated Service Network 19 Service-Disabled Veteran-Owned Small Business
Z2DA--652-24-101 Improve Electrical Distribution Department of Veterans Affairs Richmond, Virginia 23249, United States · NAICS 236220 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business