UT FTFW OURA 11(1), Auto Tour Route
Closed Solicitation Posted
- Solicitation number
- 6982AF20B000030
- Agency
- Federal Highway Administration Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- UT 84026 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation from the Department of Transportation Federal Highway Administration seeks roadway rehabilitation and resurfacing services along segments of the Auto Tour Route within Ouray National Wildlife Refuge in Utah. The work includes resurfacing approximately 3.16 miles of roadway segments and installing 982 feet of new roadway realignment. Bids were due by August 13, 2020 and will be evaluated based on price. The contract is a firm fixed-price agreement and has a completion date tied to notice to proceed.
There is no set-aside designation. The project involves road construction estimated between $644,000-894,882. Key bidders included KW Trucking with the apparent low bid of $384,457.50 and Stubbs and Stubbs Oilfield Construction at $888,402. The work is to take place along segments of the Auto Tour Route totaling 4.19 miles within Ouray National Wildlife Refuge located near Gusher, Utah and must be completed by specified deadline to avoid liquidated damages.
Notice text
THIS IS AN INVITATION FOR BID, PLANS AND SPECS ARE AVAILABLE AT THIS
TIME.
Ouray National Wildlife Refuge is managed as part of the Lower Green River
Complex as a sanctuary for migratory birds, threatened and endangered
species, and species of special concern. The Auto Tour Route (RTE 011) is a
4.7 mile loop road that provides access to the southwest portion of the
refuge which primarily consists of riparian, wetland, and grassland habitat.
During periods of high flows in the Green River, primarily during peak spring
runoff, large portions of the southern segment of the roadway inundates
with flood water, requiring a full road closure.
The purpose of the project is to improve access to this portion of the refuge
by providing turn around locations that allow the east and west segments of
the Auto Tour Route (RTE 011) to remain open during periods of high flows.
The project also improves safety and provides for longer term access at one
location by shifting the roadway alignment away from an area of river bank
erosion.
The project consists of roadway rehabilitation and aggregate surface course
resurfacing of approximately 1.64 miles of the northwest segment and 1.51 miles of the
northeast segment of the Auto Tour Route (RTE 011) and 0.04 miles of an
adjacent Fishing Access spur. The northeast segment also includes 982 feet
of roadway realignment away from an area of embankment instability along
the Green River bank and realignment of the intersection at the Refuge
Entrance Road to a standard “T” intersection. The project also includes
installation of new gates, bollards, and signs.
Attachments
| File | Type | Posted |
|---|---|---|
| UT FTFW OURA 11(1) Auto Tour Route Amended Bid Opening Summary.pdf | ||
| UT FTFW OURA 11(1) Auto Tour Route Bid Opening Summary.pdf | ||
| Amendment A002.pdf | ||
| Amendment A001.pdf | ||
| UT FTFW OURA 11-1 Signed 100 AD Plans SS.PDF | ||
| IFB UT FTFW OURA 11-1 Auto Tour Route.pdf | ||
| UT FTFW OURA 11-1 Auto Tour Route - V1 PM tech memo rev. 07-10-19a.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| UT FTFW OURA 11(1), Auto Tour Route | Solicitation | |
| UT FTFW OURA 11(1), Auto Tour Route | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity