UT FTFW OURA 11(1), Auto Tour Route

Closed Solicitation Posted

Solicitation number
6982AF20B000030
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
UT 84026 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation from the Department of Transportation Federal Highway Administration seeks roadway rehabilitation and resurfacing services along segments of the Auto Tour Route within Ouray National Wildlife Refuge in Utah. The work includes resurfacing approximately 3.16 miles of roadway segments and installing 982 feet of new roadway realignment. Bids were due by August 13, 2020 and will be evaluated based on price. The contract is a firm fixed-price agreement and has a completion date tied to notice to proceed.

There is no set-aside designation. The project involves road construction estimated between $644,000-894,882. Key bidders included KW Trucking with the apparent low bid of $384,457.50 and Stubbs and Stubbs Oilfield Construction at $888,402. The work is to take place along segments of the Auto Tour Route totaling 4.19 miles within Ouray National Wildlife Refuge located near Gusher, Utah and must be completed by specified deadline to avoid liquidated damages.

Notice text

THIS IS AN INVITATION FOR BID, PLANS AND SPECS ARE AVAILABLE AT THIS
TIME.
Ouray National Wildlife Refuge is managed as part of the Lower Green River
Complex as a sanctuary for migratory birds, threatened and endangered
species, and species of special concern. The Auto Tour Route (RTE 011) is a
4.7 mile loop road that provides access to the southwest portion of the
refuge which primarily consists of riparian, wetland, and grassland habitat.
During periods of high flows in the Green River, primarily during peak spring
runoff, large portions of the southern segment of the roadway inundates
with flood water, requiring a full road closure.


The purpose of the project is to improve access to this portion of the refuge
by providing turn around locations that allow the east and west segments of
the Auto Tour Route (RTE 011) to remain open during periods of high flows.
The project also improves safety and provides for longer term access at one
location by shifting the roadway alignment away from an area of river bank
erosion.


The project consists of roadway rehabilitation and aggregate surface course
resurfacing of approximately 1.64 miles of the northwest segment and 1.51 miles of the
northeast segment of the Auto Tour Route (RTE 011) and 0.04 miles of an
adjacent Fishing Access spur. The northeast segment also includes 982 feet
of roadway realignment away from an area of embankment instability along
the Green River bank and realignment of the intersection at the Refuge
Entrance Road to a standard “T” intersection. The project also includes
installation of new gates, bollards, and signs.

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
UT FTFW OURA 11(1), Auto Tour Route This notice · Latest solicitation Solicitation
UT FTFW OURA 11(1), Auto Tour Route Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity