UT FTFW OURA 11(1) Auto Tour Route Amended Bid Opening Summary.pdf

PDF 87 KB Posted

Attached to
UT FTFW OURA 11(1), Auto Tour Route Federal contract opportunity
Solicitation number
6982AF20B000030
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains an amended bid opening summary and details of a federal contract opportunity for the UT FTFW OURA 11(1) Auto Tour Route project. The amended bid opening summary shows that two additional bids were received after the opening and lists the six total bids submitted, ranging from $384,457.50 to $894,881.92. The top two bidders were KW Trucking at $384,457.50 and Stubbs and Stubbs Oilfield Construction at $888,402. The federal contract opportunity is seeking bids to improve access to a portion of the Ouray National Wildlife Refuge by providing turnaround locations on the Auto Tour Route that allow segments to remain open during high river flows, improving safety and access by shifting part of the roadway away from an eroding riverbank. The solicitation was issued by the Department of Transportation Federal Highway Administration for road rehabilitation and resurfacing work along segments of the Auto Tour Route and adjacent areas totaling approximately 4.19 miles.

View the file

Other files for this federal contract opportunity

Other files attached to UT FTFW OURA 11(1), Auto Tour Route, newest first.
File Type Posted
UT FTFW OURA 11(1) Auto Tour Route Bid Opening Summary.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
UT FTFW OURA 11-1 Signed 100 AD Plans SS.PDF PDF
IFB UT FTFW OURA 11-1 Auto Tour Route.pdf PDF
UT FTFW OURA 11-1 Auto Tour Route - V1 PM tech memo rev. 07-10-19a.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amended Bid Opening Summary Two bids were located in the mailroom after the bid opening and received by the mailroom clerk signed for at 12:16 on August 13, 2020. Bids have been accepted and added to the Summary.

Bid Opening Summary

Project Name: Auto Tour Route Project Number: UT FTFW OURA 11(1)

Bid Opening Date: 8/13/2020 Time: 2:00 p.m.

Bid Opening Location: Lakewood, CO Bid Opening Officer: Sheri Walsh

Amendments: Amendments (2)

**APPARENT LOW BIDDER**

Bidder’s Name Bid Total

1. Stubbs and Stubbs Oilfield Construction Vernal, Utah

A $ 888,402.00

2. KW Trucking Vernal, Utah

A $384,457.50

3. Staker and Parsons DBA Burdick Materials Roosevelt, Utah

A $695,272.00

4. Construction Solutions Group St. Louis, MO

A $ 894,881.92

5. Red Hand Oilfield Services Inc.

Fort Duchesne, UT

A $ 525,665.82

6.

A $

7.

8.

9.

All bids subject to verification

Bid Opening Summary
Bid Opening Date: 8/13/2020 Time: 2:00 p.m.

File details come from the government source that posted it. Updated .