UT FTFW OURA 11(1) Auto Tour Route Bid Opening Summary.pdf

PDF 132 KB Posted

Attached to
UT FTFW OURA 11(1), Auto Tour Route
Solicitation number
6982AF20B000030
Issued by

About this file

This document summarizes a bid opening for the UT FTFW OURA 11(1) Auto Tour Route federal contract opportunity. KW Trucking submitted the apparent low bid of $384,457.50 to rehabilitate and resurface approximately 1.64 miles of the northwest segment and 1.51 miles of the northeast segment of the Auto Tour Route on the Ouray National Wildlife Refuge. The project also includes 982 feet of roadway realignment, intersection realignment, and installation of new gates, bollards and signs. Engineering estimates for the project were $644,000. Bids were opened on August 13, 2020 in Lakewood, Colorado and were subject to verification by the contracting agency, the Department of Transportation Federal Highway Administration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Opening Summary

Project Number: UT FTFW OURA 11(1)

Time: 2:00 p.m.

Bid Opening Officer: Sheri Walsh

Project Name: Auto Tour Route

Bid Opening Date: 8/13/2020

Bid Opening Location: Lakewood, CO

Amendments: A001 / A002

**APPARENT LOW BIDDER**

Bidder’s Name Bid Total

1. Stubbs and Stubbs Oilfield Construction Vernal, Utah

A $ 888,402.00

2. KW Trucking Vernal, Utah

A $384,457.50

3. Staker and Parsons DBA Burdick Materials Roosevelt, Utah

A $695,272.00

4. A $

5. A $

6. A $

7. A $

8. A $

9. A $

10. Engineers Estimate: A $644,000.00

All bids subject to verification

Bid Opening Summary
Bid Opening Date: 8/13/2020 Time: 2:00 p.m.