Upgrade 480V Electrical System
Closed Pre-Solicitation Posted
- Solicitation number
- 36C24921R0084
- Agency
- Veterans Integrated Service Network 9 Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- Place of performance
- Louisvi KY 40206, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 is seeking to upgrade the 480V electrical system at the Robley Rex VA Medical Center in Louisville, Kentucky. The contractor will be required to install a new 1150 KVA outdoor transformer with pad and barrier walls, upgrade the 480V switchgear, correct wiring deficiencies for two CAT scan rooms, and move several air handlers and associated chilled water pumps and controls to emergency power circuits. Proposals will be evaluated based on technical qualifications, past performance, and price/cost. Amendments to the solicitation extended the response deadline to June 1, 2021.
This opportunity is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 238210 - Electrical Contractors and Other Wiring Installation Contractors, with an estimated value between $500,000 and $1,000,000. The period of performance is 210 days. Key details include installing a new 1150 KVA transformer, upgrading the 480V electrical system at the medical facility, and relocating specific air handlers and associated equipment to emergency power circuits per the specifications and drawings provided.
Notice text
5 versions
Update #5 · Latest ·
This post has been updated with the Wage Determination included as an attachment
Amendment 0003 incorporated answers to all RFIs, adds the specification attachment, and states 36C24921R0084_1 is the solicitation document.
Amendment 0002 incorporates the following changes, and replaces the original solicitation in it's entirety: adds S02-Price Schedule attachment, removes Past Performance Questionnaire attachment and requirement, adds due date/time for RFIs, changes the POC to Matt Durbin, removes fire alarm verbiage from Factor 3, adds requirement that only emailed proposals will be accepted, adds requirement for hard copy bid bonds, and removes the provision that facsimile proposals will be accepted.
Amendment 0001 changes the site visit time to 1:00 PM ET, includes the construction magnitude, and extends the proposal due date to June 1 at 12:00 PM ET.
The contractor shall furnish all material, equipment and labor necessary to install the new 1150 KVA transformer with pad and barrier walls, and upgrade the 480V electrical system per specifications and drawings. It is the intent of these drawings and specification to install a new outdoor 480V transformer to feed the 480V switchgear in sub-basement 1, to correct wiring deficiencies for CAT Scan rooms, and to move the electrical feeds for several air handlers and their associated chilled water pumps and controls to emergency power circuits.
Update #4 ·
Amendment 0003 incorporated answers to all RFIs, adds the specification attachment, and states 36C24921R0084_1 is the solicitation document.
Amendment 0002 incorporates the following changes, and replaces the original solicitation in it's entirety: adds S02-Price Schedule attachment, removes Past Performance Questionnaire attachment and requirement, adds due date/time for RFIs, changes the POC to Matt Durbin, removes fire alarm verbiage from Factor 3, adds requirement that only emailed proposals will be accepted, adds requirement for hard copy bid bonds, and removes the provision that facsimile proposals will be accepted.
Amendment 0001 changes the site visit time to 1:00 PM ET, includes the construction magnitude, and extends the proposal due date to June 1 at 12:00 PM ET.
The contractor shall furnish all material, equipment and labor necessary to install the new 1150 KVA transformer with pad and barrier walls, and upgrade the 480V electrical system per specifications and drawings. It is the intent of these drawings and specification to install a new outdoor 480V transformer to feed the 480V switchgear in sub-basement 1, to correct wiring deficiencies for CAT Scan rooms, and to move the electrical feeds for several air handlers and their associated chilled water pumps and controls to emergency power circuits.
Update #3 ·
Amendment 0002 incorporates the following changes, and replaces the original solicitation in it's entirety: adds S02-Price Schedule attachment, removes Past Performance Questionnaire attachment and requirement, adds due date/time for RFIs, changes the POC to Matt Durbin, removes fire alarm verbiage from Factor 3, adds requirement that only emailed proposals will be accepted, adds requirement for hard copy bid bonds, and removes the provision that facsimile proposals will be accepted.
Amendment 0001 changes the site visit time to 1:00 PM ET, includes the construction magnitude, and extends the proposal due date to June 1 at 12:00 PM ET.
The contractor shall furnish all material, equipment and labor necessary to install the new 1150 KVA transformer with pad and barrier walls, and upgrade the 480V electrical system per specifications and drawings. It is the intent of these drawings and specification to install a new outdoor 480V transformer to feed the 480V switchgear in sub-basement 1, to correct wiring deficiencies for CAT Scan rooms, and to move the electrical feeds for several air handlers and their associated chilled water pumps and controls to emergency power circuits.
Update #2 ·
Amendment 0001 changes the site visit time to 1:00 PM ET, includes the construction magnitude, and extends the proposal due date to June 1 at 12:00 PM ET.
The contractor shall furnish all material, equipment and labor necessary to install the new 1150 KVA transformer with pad and barrier walls, and upgrade the 480V electrical system per specifications and drawings. It is the intent of these drawings and specification to install a new outdoor 480V transformer to feed the 480V switchgear in sub-basement 1, to correct wiring deficiencies for CAT Scan rooms, and to move the electrical feeds for several air handlers and their associated chilled water pumps and controls to emergency power circuits.
Update #1 ·
The contractor shall furnish all material, equipment and labor necessary to install the new 1150 KVA transformer with pad and barrier walls, and upgrade the 480V electrical system per specifications and drawings. It is the intent of these drawings and specification to install a new outdoor 480V transformer to feed the 480V switchgear in sub-basement 1, to correct wiring deficiencies for CAT Scan rooms, and to move the electrical feeds for several air handlers and their associated chilled water pumps and controls to emergency power circuits.
Attachments
Show all 50
This notice has more attachments on GovTribe.
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity