00.00_GI000 - COVER SHEET AND SHEET INDEX.pdf
PDF 1 MB Posted
- Attached to
- Upgrade 480V Electrical System Federal contract opportunity
- Solicitation number
- 36C24921R0084
About this file
This document package includes construction drawings and specifications for an electrical system upgrade project. The project scope involves installing a new 1150 KVA outdoor transformer to feed 480V switchgear in the sub-basement, correcting wiring deficiencies for CAT scan rooms, and relocating electrical feeds for several air handlers and associated chilled water pumps and controls to emergency power circuits. The drawings and specifications provide requirements for furnishing material, equipment, and labor to complete the work at the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 facility located at 800 Zorn Ave., Louisville, KY 40206. Relevant details include plans for a new transformer pad and barrier walls, upgrading the entire 480V electrical system, and relocating specific mechanical equipment to emergency power circuits. Completion is required per the specifications, drawings, and stated codes and standards.
View the file
Other files for this federal contract opportunity
Show all 50
Upgrade 480V Electrical System has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR WORK WITHIN THE EXISTING FACILITY.
2. THE CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE CONTRACTOR SHALL CAREFULLY
EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE ARCHITECT AND C.O.R.
3. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION AND CONSTRUCTION.
4. MAINTAIN EXIT EGRESS PATHS TO EXISTING EXIT DOORS DURING CONSTRUCTION.
5. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE ROUTES MUST BE RETURNED TO THEIR ORIGINAL
CONDITION AT THE END OF THE PROJECT.
6. MAINTAIN THE BUILDING IN A WEATHERTIGHT CONDITION AT ALL TIMES.
7. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE C.O.R. TO MINIMIZE DISRUPTIONS OF NORMAL FUNCTIONS OF THE VA'S OCCUPIED AREAS.
8. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R. 48 HOURS BEFORE THE SCHEDULED TIME OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL
BE DONE WITHOUT THE WRITTEN APPROVAL OF THE C.O.R. THE C.O.R. RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT ANY TIME. NO RADIOS SHALL BE PERMITTED
AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED SPACES.
9. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO ADJACENT DEPARTMENTS OR AREAS THAT ARE IN OPERATION AND SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES WITH THE C.O.R. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE C.O.R.'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR UTILITIES DURING INTERRUPTIONS AS REQUIRED AND APPROVED BY THE C.O.R.
10. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE VA'S OCCUPIED AREAS ADJACENT TO NEW CONSTRUCTION OR OCCUPIED AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR EXTENSIONS ARE REQUIRED. IN THESE AREAS, THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY LACK OF SUFFICIENT PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF ALL CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO DUST AND WATER.
11. THE CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE C.O.R. BEFORE GRINDING, USING OPEN FLAMES, WELDING RODS AND TORCHES. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS TO PROHIBIT THE MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF THE EXISTING BUILDING
AND FOR OBTAINING ALL REQUIRED PERMITS RELATED TO HOT WORK.
12. PROVIDE FIRE PROTECTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE GOVERNING AUTHORITY.
13. IT IS THE CONTRACTORS RESPONSIBILITY TO PATCH ALL SPRAY-ON FIRE PROTECTION AT REMOVALS, AT ANY EXISTING LOCATIONS WHICH ARE VOID OF PROTECTION WITHIN THE
AREA OF WORK AND AT NEW CONSTRUCTION WHICH DISTURBS EXISTING FIRE PROTECTION. FIREPROOFING MUST BE CONTINUOUS AND UNOBSTRUCTED.
14. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL INTEGRITY OF ALL STRUCTURAL FRAMING MEMBERS AND SYSTEMS AT ALL TIMES.
15. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED BY THE ARCHITECT OR THE C.O.R. FOR RETENTION, SHALL BECOME THE PROPERTY OF THE
CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING FROM WORK SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK. THE WEIGHT AND COST OF DISPOSAL FOR ALL CONTROLLED SUBSTANCES SUCH AS LEAD AND ASBESTOS SHALL BE TRACKED AND REPORTED. THE CONTRACTOR SHALL NOT USE THE VA TRASH
COMPACTOR.
16. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES
INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL AND PLUMBING.
17. WHERE CEILINGS ARE SHOWN TO BE REMOVED, ALL UNUSED SUSPENDED EQUIPMENT, WIRES, ANGLES, ETC. SHALL BE REMOVED. SEE DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING LIGHTS MAY BE MAINTAINED AS TEMPORARY CONSTRUCTION LIGHTING.
18. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED AS REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED IN THE FINAL
CONSTRUCTION.
19. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH
SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.
20. ALL EXISTING OPENINGS IN CEILINGS, FLOORS AND WALLS DISCOVERED IN THE EXISTING STRUCTURE SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH. USE ONE FIRE STOPPING SYSTEM FOR ALL SUB-CONTRACTORS.
21. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE OR ALTER THE EXISTING SURFACES AS NECESSARY TO PROPERLY ACCOMMODATE THE NEW MATERIALS.
22. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK. DETERMINE THE SIZE AND LOCATION THE PENETRATIONS FROM THE EXISTING
UTILITIES WITHIN THE NEW WORK. SEAL TIGHT TO ALL PENETRATIONS AND CAULK.
23. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFE'D TO ACHIEVE THE PROPER FIRE RATING BY THE END OF
CONSTRUCTION OPERATIONS FOR EACH DAY.
24. NEW HOLES IN EXISTING ELEVATED FLOOR AND ROOF STRUCTURES FOR NEW WORK MUST BE COORDINATED WITH THE EXISTING STRUCTURE SO THAT CRITICAL STRUCTURAL
MEMBERS ARE NOT DAMAGED.
25. UNLESS OTHERWISE NOTED, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING SALVAGED STOCK BEFORE ORDERING NEW MATERIAL.
G E N E R A L N O T E S F O R E X I S T I N G F A C I L I T I E S :
PROJECT EXTENT
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL AUTHORITIES, CODES, RULES AND REGULATIONS.
2. THESE DOCUMENTS SHOW THE MINIMUM CONSTRUCTION REQUIREMENTS AND THE MINIMUM QUALITY OF WORK EXPECTED. MORE STRINGENT
REQUIREMENTS STIPULATED WITHIN RELEVANT MANUFACTURER’S INSTALLATION INSTRUCTIONS WILL SUPERSEDE.
3. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED TO THE COR AND ARCHITECT PRIOR TO PROCEEDING WITH WORK.
4. ANY CONFLICTS WITHIN THE DRAWINGS, BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, OR BETWEEN THE DRAWINGS AND THE ACTUAL
CONDITIONS AT THE SITE, ARE TO BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR AND ARCHITECT. THE CONTRACTOR SHALL NOT PROCEED
WITH WORK UNTIL WRITTEN CLARIFICATION FROM THE COR AND ARCHITECT IS RECEIVED.
5. UNLESS OTHERWISE NOTED, ALL MATERIALS AND EQUIPMENT ARE TO BE INSTALLED PER THE APPLICABLE PROVISIONS OF THESE DOCUMENTS AND THE
MANUFACTURER’S INSTRUCTIONS.
6. ALL MATERIALS USED ARE REQUIRED TO BE NEW UNLESS OTHERWISE NOTED AND/OR OF A QUALITY TO MEET OR EXCEED ALL APPLICABLE INDUSTRY STANDARDS. WHERE SPECIFIED PRODUCTS OR MANUFACTURERS ARE NOT NOTED, THE CONTRACTOR IS REQUIRED TO NOTIFY THE COR AND
ARCHITECT TO OBTAIN A MINIMUM STANDARD OF QUALITY.
7. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR CONSTRUCTION.
8. THE CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY INCLUDING BUT NOT LIMITED TO THE ADHERENCE TO OSHA REGULATIONS.
9. ALL ELECTRICAL AND MECHANICAL WORK SHALL BE PERFORMED BY PERSONNEL LICENSED IN THE STATE WHERE THIS PROJECT IS LOCATED.
10. REMOVE ALL DEBRIS PROPERLY FROM THE SITE. LOAD DEBRIS DIRECTLY ONTO TRUCKS OR INTO DUMPSTERS FOR REMOVAL. DISPOSE OF DEBRIS
LEGALLY. DO NOT BURN DEBRIS ON THE SITE. DO NOT ALLOW DEBRIS TO ENTER SEWERS. DO NOT ALLOW PILED DEBRIS TO ENDANGER STRUCTURES, BLOCK EXISTS OR ROADWAYS. COMBUSTIBLE WASTE WHICH COULD CREATE A FIRE HAZARD SHALL NOT BE PERMITTED TO ACCUMULATE IN OR AROUND THE CONSTRUCTION SITE. DEBRIS FROM OTHER LOCATIONS SHALL NOT BE BROUGHT ONTO VA PROPERTY.
11. COORDINATE ALL WORK WITH ALL OTHER DISCIPLINES, INCLUDING, BUT NOT LIMITED TO MECHANICAL, ELECTRICAL, PLUMBING & SITE DRAWINGS. EXACT SIZE AND LOCATION OF ALL ROOF AND FLOOR OPENINGS SHOWN ON ARCHITECTURAL DRAWINGS SHALL BE VERIFIED WITH THE ASSOCIATED SUB-
CONTRACTORS PRIOR TO CONSTRUCTION.
12. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN. ALL PLAN DIMENSIONS ARE TAKEN TO FINISH FACE OF CONSTRUCTION.
13. LAYOUT AND VERIFY ALL PARTITION LOCATIONS PRIOR TO CONSTRUCTION FOR CLEARANCES AND DIMENSIONS. NOTIFY ARCHITECT OF ANY
DISCREPANCIES.
14. WITHIN ALL METAL STUD PARTITIONS, THE CONTRACTOR IS TO PROVIDE BLOCKING FOR ALL WALL MOUNTED EQUIPMENT AND ACCESSORIES INCLUDING
BUT NOT LIMITED TO: MECHANICAL, ELECTRICAL AND PLUMBING DEVICES, FURNITURE, CASEWORK, MILLWORK AND ALL OTHER WALL MOUNTED ACCESSORIES AND ITEMS. THE LOCATIONS, MOUNTING HEIGHTS AND BLOCKING REQUIREMENTS SHOWN HEREON ARE GIVEN FOR INFORMATIONAL PURPOSES ONLY AND IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THIS INFORMATION WITH THE ASSOCIATED SUB-CONTRACTORS, MANUFACTURERS, OR EQUIPMENT SUPPLIERS.
15. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.
16. THE CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL AND PLUMBING, TO
DETERMINE THE SIZE AND LOCATION OF ALL PENETRATIONS IN NEW CONSTRUCTION. COORDINATE AND PROVIDE ALL OPENINGS. SEAL CONSTRUCTION
TIGHT TO ALL PENETRATIONS AND CAULK.
17. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION MUST BE FIRE SAFE'D IN ACCORDANCE WITH THE SPECIFICATIONS.
18. PROVIDE CONTROL JOINTS IN GYPSUM WALLBOARD INTERIOR PARTITIONS AT 30 FEET ON CENTER MAXIMUM. WHERE POSSIBLE, LOCATE AT CORNERS
ABOVE OPENINGS. VERIFY LOCATIONS WITH ARCHITECT. SEE THE ASSOCIATED TYPICAL DETAILS INCLUDED IN THESE DOCUMENTS.
19. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND VERIFYING ALL REQUIRED ROUGH OPENINGS, AND ROUGH-
IN DIMENSIONS WITH THE EQUIPMENT MANUFACTURER, OWNER AND ARCHITECT PRIOR TO CONSTRUCTION.
G E N E R A L N O T E S F O R N E W W O R K :
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD FFE Inc Engineering and Technical Services 110 Boggs Lane, Suite 170 Springdale, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
603-20-505
Louisville, KY
UPGRADE 480V
ELECTRICAL SYSTEM
C :\U se rs
\J ac k\ D oc um en ts
\L ou is vi lle
U pg ra de
V El ec S ys te m (2
8)
_j ac k.
bo nb rig ht T4
3D B.
rv t
3/
/2
2:
:4
PM
GI000
COVER SHEET AND SHEET INDEX
03/01/21 PH DB
D R A W I N G I N D E X ROBLEY REX VAMC
UPGRADE 480V ELECTRICAL SYSTEM
DEPARTMENT OF VETERANS AFFAIRS
603-20-505
800 ZORN AVE.
LOUISVILLE, KY 40206
VICINITY MAP SITE LOCATION MAPSITE MAP NTSNTS
Sheet # Sheet Name
GENERAL
GI000 COVER SHEET AND SHEET INDEX
ARCHITECTURAL
AE101 SCREEN WALL DETAILS
ELECTRICAL
E001 LEGEND
E500 SCHEDULES, DETAILS AND SINGLE-LINE DIAGRAM
E501 PARTIAL MEDIUM VOLTAGE SINGLE-LINE DIAGRAM
E600 PANEL SCHEDULES
ES100 ELECTRICAL SITE PLAN
EP0000 OVERALL SUB-BASEMENT PLAN
EP0001 SUB-BASEMENT ELECTRICAL PLAN
EP000 OVERALL BASEMENT ELECTRICAL PLAN
EP001A BASEMENT ELECTRICAL PLAN-A
EP001B BASEMENT ELECTRICAL PLAN-B
EP100 OVERALL FIRST FLOOR PLAN
EP101 FIRST FLOOR ELECTRICAL PLAN
EP200 OVERALL SECOND FLOOR PLAN
EP201 SECOND FLOOR ELECTRICAL PLAN
EP300 OVERALL THIRD FLOOR PLAN
EP400 OVERALL FOURTH FLOOR PLAN
EP500 OVERALL FIFTH FLOOR PLAN
EP600 OVERALL SIXTH FLOOR PLAN
EP700 OVERALL SEVENTH FLOOR PLAN
EP800 OVERALL EIGHT FLOOR PLAN
EP900 OVERALL NINTH FLOOR PLAN
Revisions: Date:
SCHEMATIC DESIGN 25% 11/06/20
BID DOCUMENTS 100% 03/12/21
10/11/2019
03/12/2021
| Sheets |
| AE101 - SCREEN WALL DETAILS |
| E001 - LEGEND |
| E500 - SCHEDULES, DETAILS AND SINGLE-LINE DIAGRAM |
| E501 - PARTIAL MEDIUM VOLTAGE SINGLE-LINE DIAGRAM |
| E600 - PANEL SCHEDULES |
| EP000 - OVERALL BASEMENT ELECTRICAL PLAN |
| EP0000 - OVERALL SUB-BASEMENT PLAN |
| EP0001 - SUB-BASEMENT ELECTRICAL PLAN |
| EP001A - BASEMENT ELECTRICAL PLAN-A |
| EP001B - BASEMENT ELECTRICAL PLAN-B |
| EP100 - OVERALL FIRST FLOOR PLAN |
| EP101 - FIRST FLOOR ELECTRICAL PLAN |
| EP200 - OVERALL SECOND FLOOR PLAN |
| EP201 - SECOND FLOOR ELECTRICAL PLAN |
| EP300 - OVERALL THIRD FLOOR PLAN |
| EP400 - OVERALL FOURTH FLOOR PLAN |
| EP500 - OVERALL FIFTH FLOOR PLAN |
| EP600 - OVERALL SIXTH FLOOR PLAN |
| EP700 - OVERALL SEVENTH FLOOR PLAN |
| EP800 - OVERALL EIGHT FLOOR PLAN |
| EP900 - OVERALL NINTH FLOOR PLAN |
| ES100 - ELECTRICAL SITE PLAN |
| GI000 - COVER SHEET AND SHEET INDEX |
File details come from the government source that posted it. Updated .