S02-Price Schedule (Project 603-20-505) FY2021.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Upgrade 480V Electrical System
Solicitation number
36C24921R0084
Issued by

About this file

This price schedule and related federal contract opportunity provide details for an upgrade to the 480V electrical system at the Robley Rex VA Medical Center. The contractor will install a new 1150 KVA outdoor transformer with pad and barrier walls to feed the 480V switchgear in the sub-basement. The upgrade will correct wiring deficiencies for CAT scan rooms and move electrical feeds for several air handlers, chilled water pumps, and controls to emergency power circuits. The period of performance is 210 days from notice to proceed. The contractor must prepare a phasing plan to minimize electrical outages and may need to work outside normal hours. Upon completion, the contractor will provide as-built drawings and O&M manuals to the VA. The price schedule template requires the contractor to provide itemized pricing for labor, materials, equipment, taxes, overhead, profit, bonds and permits for the project divisions. Deductive alternates may be proposed to reduce the base bid scope of work. The related federal contract opportunity is solicitation number 36C24921R0084 issued by the Department of Veterans Affairs for the upgrade at the Robley Rex VA Medical Center.

View the file

Other files

File Type Posted
KY20210093 Wage Determination.pdf PDF
Pad-mount Med V Xforms.pdf PDF
RFIs May 24.docx DOCX document
36C24921R0084 0003.pdf PDF
36C24921R0084_1.pdf PDF
36C24921R0084 0002.pdf PDF
36C24921R0084 0001.pdf PDF
14.08_EP001B - BASEMENT ELECTRICAL PLAN-B.pdf PDF
312011 Earthwork.pdf PDF
14.10_EP101 - FIRST FLOOR ELECTRICAL PLAN.pdf PDF
263623 ATS.pdf PDF
260573 Overcurrent Prot Device Study.pdf PDF
024100 Demolition.pdf PDF
14.09_EP100 - OVERALL FIRST FLOOR PLAN.pdf PDF
014219 Ref Standards.pdf PDF
14.04_EP0000 - OVERALL SUB-BASEMENT PLAN.pdf PDF
078400 Firestopping.pdf PDF
14.13_EP300 - OVERALL THIRD FLOOR PLAN.pdf PDF
14.03_E600 - PANEL SCHEDULES.pdf PDF
079200 Joint Sealants.pdf PDF
260513 Med Voltage Cables.pdf PDF
14.15_EP500 - OVERALL FIFTH FLOOR PLAN.pdf PDF
14.00_E001 - LEGEND.pdf PDF
14.18_EP800 - OVERALL EIGHT FLOOR PLAN.pdf PDF
260533 Raceway and Boxes.pdf PDF
260526 Grounding and Bonding.pdf PDF
018113 Sustainable Construction Requirements.pdf PDF
265600 Ext Lighting.pdf PDF
14.12_EP201 - SECOND FLOOR ELECTRICAL PLAN.pdf PDF
14.14_EP400 - OVERALL FOURTH FLOOR PLAN.pdf PDF
264313 Surge Prot Dev.pdf PDF
013526 Safety Req.pdf PDF
Combined Drawings.pdf PDF
14.20_ES100 - ELECTRICAL SITE PLAN.pdf PDF
14.17_EP700 - OVERALL SEVENTH FLOOR PLAN.pdf PDF
0000 cover Rev 1.pdf PDF
260541 Underground Elec Const.pdf PDF
014529 Testing Laboratory Services.pdf PDF
14.16_EP600 - OVERALL SIXTH FLOOR PLAN.pdf PDF
013323 Shop Drawings.pdf PDF
260511 Req Electric.pdf PDF
033053 Cast in Place Conrete.pdf PDF
013216-15 Schedules 2.pdf PDF
262413 Distribution Switchboard.pdf PDF
040516 Masonry Grouting2.pdf PDF
14.11_EP200 - OVERALL SECOND FLOOR PLAN.pdf PDF
14.19_EP900 - OVERALL NINTH FLOOR PLAN.pdf PDF
262416 Panelboards.pdf PDF
047200 CAST STONE MASONRY.pdf PDF
14.01_E500 - SCHEDULES, DETAILS AND SINGLE-LINE DIAGRAM.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Item 1

JOB NAME: TBD LOCATION: TBDSolicitation NumberProject TitleSolicitation NumberProject NumberProposal Date
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
Infection Control Walls$0.00$0.00$0.00$0.00
Submittal Process$0.00$0.00$0.00$0.00
Supervision$0.00$0.00$0.00$0.00
Demolition$0.00$0.00$0.00$0.00
Dumpsters$0.00$0.00$0.00$0.00
Job-site Office Equipment$0.00$0.00$0.00$0.00
Safety & First Aid-ICRA$0.00$0.00$0.00$0.00
Final Cleaning$0.00$0.00$0.00$0.00
Punchlist/Closeout$0.00$0.00$0.00$0.00
DIVISION 2SITE WORK$0.00
02 41 00Demolition$0.00
DIVISION 6WOOD, PLASTICS AND COMPOSITES$0.00
06 06 00Translucent Resin Panel System$0.00$0.00$ - 0$0.00
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 72 00Roof Accessories
07 84 00Firestopping
07 92 00Joint Sealants
DIVISION 9FINISHES$0.00
09 06 00Schedule for Finishes$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 51 00Acoustical Ceilings$0.00$0.00$0.00$0.00
09 65 16Resilient Sheet Flooring$0.00$0.00$0.00$0.00
09 65 19Resilient Tile Flooring$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
DIVISION 10ACCESSORIES$0.00
10 14 00Signage$0.00$0.000.00$0.00
10 26 00Wall and Door Protection$0.00$0.000.00$0.00
DIVISION 14CONVEYING EQUIPMENT$0.00
14 21 00Electric Traction Passenger Elevators P1-P4$0.00$0.00$0.00$0.00
14 21 20Electric Traction Passenger Elevators P7-P9$0.00$0.00$0.00$0.00
14 21 30Electric Traction Service Elevators S5-S6$0.00$0.00$0.00$0.00
14 21 90Passenger Elevators Data Connection P10-P12$0.00$0.00$0.00$0.00
Division 21FIRE SUPPRESSION$0.00
21 13 13Wet-Pipe Sprinkler Systems$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
DIVISION 23HEATING, VENTILATING AND AIR CONDITIONING (HVAC)$0.00
23 05 11Common Work Results for HVAC$0.00$0.00$0.00$0.00
23 05 12General Motor Requirements for HVAC and Steam Generation Equipment$0.00$0.00$0.00$0.00
23 07 11HVAC and Boiler Plant Insulation$0.00$0.00$0.00$0.00
23 23 00Refrigerant Piping$0.00$0.00$0.00$0.00
23 81 00Decentralized VRF Equipment$0.00$0.00$0.00$0.00
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations$0.00$0.00$0.00$0.00
26 05 19Low-Voltage Electrical Power Conductors and Cables$0.00$0.00$0.00$0.00
26 05 26Grounding and Bonding for Electrical Systems$0.00$0.00$0.00$0.00
26 05 33Raceways and Boxes for Electrical Systems$0.00$0.00$0.00$0.00
26 24 16Panelboards$0.00$0.00$0.00$0.00
26 27 26Wiring Devices$0.00$0.00$0.00$0.00
26 29 21Enclosed Switches and Circuit Breakers$0.00$0.00$0.00$0.00
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations$0.00$0.00$0.00$0.00
27 05 26Grounding and Bonding for Communications Systems$0.00$0.00$0.00$0.00
27 05 33Raceways and Boxes for Communications Systems$0.00$0.00$0.00$0.00
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 31 00Fire Detection and Alarm$0.00$0.00$0.00$0.00

TOTALS

TOTAL LABOR $0.00

TOTAL MATERIALS $0.00

TAX FOR MATERIALS 6% $0.00

TOTAL EQUIPMENT$0.00
$0.00
TOTAL SUB

DIVISION GRAND TOTALS

DIVISION GRAND TOTALS$0
TAX FOR MATERIALS$0

SUBTOTAL $0

OVERHEAD0%$0
PROFIT0%$0

SUBTOTAL $0

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $0

Base Offer Item 1INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.
The contractor shall furnish all materials, equipment and labor necessary to install the new 1150 KVA transformer with pad and barrier walls, and upgrade the 480V electrical system per specifications and drawings. It is the intent of these drawings and specifications to install a new outdoor 480V transformer to feed the 480V switchgear in sub-basement 1, to correct wiring deficiencies for CAT Scan rooms, and to move the electrical feeds for several air handlers and their associated chilled water pumps and controls to emergency power circuits.

The contractor shall furnish everything necessary to do this, whether or not all items are specifically called for in these plans, specifications and/or drawings. The period of performance is 210 days from receipt of notice to proceed. Construction services will incorporate all applicable VA Construction Guidelines.

Contractor shall prepare and get VA COR approval for a phasing plan to minimize the number and duration of electrical outages. To minimize disruption to hospital operations work may need to be completed outside of normal business hours such as evenings, nights, weekends and holidays.

At the completion of the project the contractor will provide drawings in AutoCAD 2013 format and operations and maintenance (O&M) manuals in Microsoft Word and PDF formats. The contractor will provide to the VA four CDs with all drawings and O&M manuals and four sets of drawings at completion of design. A future site visit will be made by appointment with COR and contractors to verify existing conditions.

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.

&"-,Bold" Project 603-20-505 &"-,Bold"Upgrade 480V Electrical System &"-,Bold"Robley Rex VA Medical Center

Deduct Alternates

DEDUCTIVE ALTERNATES TO BASE BID
Deduct Alternate 1
$__________________________________
Deduct Alternate 2
$__________________________________
Deduct Alternate 3
$__________________________________
Deduct Alternate 4
$__________________________________

File details come from the government source that posted it. Updated .