14.04_EP0000 - OVERALL SUB-BASEMENT PLAN.pdf
PDF 272 KB Posted
- Attached to
- Upgrade 480V Electrical System Federal contract opportunity
- Solicitation number
- 36C24921R0084
About this file
This package includes construction drawings and specifications for upgrading an electrical system at a Department of Veterans Affairs medical facility. The project scope involves installing a new 1150 KVA transformer with pad and barrier walls to feed 480V switchgear in the sub-basement. It will correct wiring deficiencies for CAT scan rooms and relocate electrical feeds for several air handlers, chilled water pumps, and controls to emergency power circuits. The base bid requires furnishing all material, equipment, and labor to complete all work shown on the drawings and specified. There are four deductive alternates that remove specific aspects of the electrical work for various air handlers and pumps.
View the file
Other files for this federal contract opportunity
Show all 50
Upgrade 480V Electrical System has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DUCTILE IRON
UP
UP
UPF.A.C.
B-
BASEMENT
SUB-
M-
M-
STORAGE
B-
LINEN
SOILED
M-
STORAGE
MECH RM/
STAIRWELL
#8
S-5
S-5
P-4
P-3
P-2
P-1
A- #6
STAIRWELL
F.A.C.
A-
BASEMENT
SUB-
B-
ROOM
LOCKER
B-
BASEMENT
SUB-
B- #3
STAIRWELL
B-
ROOM
EQUIPMENT
TELEPHONE
EQUIPMENT
ROOM
B-
P-7 P-8 P-9
F.A.C.
LIFT
F.A.C.
B-
EQUIPMENT
ELECTRICAL
B-
RESTROOM
B-
BASEMENT
SUB-
B- #5
STAIRWELL
STAIRWELL #1
SUB-BAS
A-
STAIRWELL #2
A-
SUB-BASEMENT
SB-6
#7
STAIRWELL
OFFICE
B-
B-
ROOM
EQUIPMENT
DOCK
SUB-BASEMENT
SB-4
DUCTILE IRON
UP
UP
UPF.A.C.
B-
BASEMENT
SUB-
M-
M-
STORAGE
B-
LINEN
SOILED
M-
STORAGE
MECH RM/
STAIRWELL
#8
S-5
S-5
P-4
P-3
P-2
P-1
A- #6
STAIRWELL
F.A.C.
A-
BASEMENT
SUB-
B-
ROOM
LOCKER
B-
BASEMENT
SUB-
B- #3
STAIRWELL
B-
ROOM
EQUIPMENT
TELEPHONE
EQUIPMENT
ROOM
B-
P-7 P-8 P-9
F.A.C.
LIFT
F.A.C.
B-
EQUIPMENT
ELECTRICAL
B-
RESTROOM
B-
BASEMENT
SUB-
B- #5
STAIRWELL
STAIRWELL #1
SUB-BAS
A-
STAIRWELL #2
A-
SUB-BASEMENT
SB-6
#7
STAIRWELL
OFFICE
B-
B-
ROOM
EQUIPMENT
DOCK
SUB-BASEMENT
SB-4
EP0001
EP0001
EP0001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD FFE Inc Engineering and Technical Services 110 Boggs Lane, Suite 170 Springdale, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
603-20-505
Louisville, KY
UPGRADE 480V
ELECTRICAL SYSTEM
C :\U se rs
\J ac k\ D oc um en ts
\L ou is vi lle
U pg ra de
V El ec S ys te m (2
8)
_j ac k.
bo nb rig ht T4
3D B.
rv t
3/
/2
2:
:3
PM
EP0000
OVERALL SUB-BASEMENT PLAN
03/01/21 JB HT
1" = 20'-0"1 OVERALL SUB-BASEMENT PLAN
Revisions: Date:
SCHEMATIC DESIGN 25% 11/06/20
BID DOCUMENTS 100% 03/12/21
G E N E R A L N O T E S
03/12/2021
BASE BID:
PROVIDE ALL WORK SHOWN ON DRAWINGS AND SPECIFICATIONS
DEDUCT ALTERNATES
ALT #1:
DEDUCT ALL ELECTRICAL WORK ASSOCIATED FOR ELECTRICAL RISER FOR AHU - 3, 5, 6, 7, 9, 12 AND 13. (PANELBOARD DAC-S) ELECTRICAL RISER FOR CHILLED WATER PUMP (PANELBOARD HB).
DEDUCT WORK FOR HVAC PUMPS. CONTROLS FOR AHU - 3, 5, 6, 7, 9, 12 AND 13. DEDUCT WORK FOR AHU-43 SUPPLY
FAN & EXHAUST FAN.
ALT #2:
DEDUCT ALL ELECTRICAL WORK CHILLED WATER PUMPS FOR AHU - 17, 23, 43.
ALT #3:
DEDUCT ALL ELECTRICAL WORK FOR CHILLED WATER PUMPS FOR AHU - 4A AND AHU - 8A (MCC IN ROOMS M-003).
PUMPS P1, P2, P3, P4. AHU - 8A AND EF8 MCC IN ROOM C-220.
ALT #4:
DEDUCT ALL ELECTRICAL WORK FOR AHU - 42 AND DX - 42 (PANELBOARD DP)
| Sheets |
| AE101 - SCREEN WALL DETAILS |
| E001 - LEGEND |
| E500 - SCHEDULES, DETAILS AND SINGLE-LINE DIAGRAM |
| E501 - PARTIAL MEDIUM VOLTAGE SINGLE-LINE DIAGRAM |
| E600 - PANEL SCHEDULES |
| EP000 - OVERALL BASEMENT ELECTRICAL PLAN |
| EP0000 - OVERALL SUB-BASEMENT PLAN |
| EP0001 - SUB-BASEMENT ELECTRICAL PLAN |
| EP001A - BASEMENT ELECTRICAL PLAN-A |
| EP001B - BASEMENT ELECTRICAL PLAN-B |
| EP100 - OVERALL FIRST FLOOR PLAN |
| EP101 - FIRST FLOOR ELECTRICAL PLAN |
| EP200 - OVERALL SECOND FLOOR PLAN |
| EP201 - SECOND FLOOR ELECTRICAL PLAN |
| EP300 - OVERALL THIRD FLOOR PLAN |
| EP400 - OVERALL FOURTH FLOOR PLAN |
| EP500 - OVERALL FIFTH FLOOR PLAN |
| EP600 - OVERALL SIXTH FLOOR PLAN |
| EP700 - OVERALL SEVENTH FLOOR PLAN |
| EP800 - OVERALL EIGHT FLOOR PLAN |
| EP900 - OVERALL NINTH FLOOR PLAN |
| ES100 - ELECTRICAL SITE PLAN |
| GI000 - COVER SHEET AND SHEET INDEX |
File details come from the government source that posted it. Updated .