About this file

This document provides specifications for installing surge protective devices (SPDs) as part of upgrading the 480V electrical system at the Robley Rex Veterans Affairs Medical Center in Louisville, Kentucky. The specifications call for installing new SPDs meeting UL 1449 and IEEE C62.41.2 standards with a minimum surge current rating of 120kA per phase. Field-installed SPDs must be connected with short, straight conductors not exceeding the manufacturer's recommended lead length. A dedicated circuit breaker must be provided for each TVSS as shown on drawings. Installation must comply with NEC standards and manufacturer instructions. The contractor must provide training and documentation, as well as demonstrate proper operation of the SPDs before project completion.

A related federal contract opportunity involves upgrading the 480V electrical system at the Louisville VA medical center per the specifications and drawings provided. The work includes installing a new outdoor 1150KVA transformer and pad to feed the 480V switchgear, correcting wiring deficiencies for CAT scan rooms, and moving air handler electrical feeds to emergency power circuits. The soliciting agency is the Veterans Health Administration under the Department of Veterans Affairs.

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade 480V Electrical System, newest first.
File Type Posted
KY20210093 Wage Determination.pdf PDF
Pad-mount Med V Xforms.pdf PDF
36C24921R0084 0003.pdf PDF
36C24921R0084_1.pdf PDF
36C24921R0084 0002.pdf PDF
36C24921R0084 0001.pdf PDF
265600 Ext Lighting.pdf PDF
312011 Earthwork.pdf PDF
260526 Grounding and Bonding.pdf PDF
260533 Raceway and Boxes.pdf PDF
262413 Distribution Switchboard.pdf PDF
260513 Med Voltage Cables.pdf PDF
018113 Sustainable Construction Requirements.pdf PDF
040516 Masonry Grouting2.pdf PDF
14.10_EP101 - FIRST FLOOR ELECTRICAL PLAN.pdf PDF
14.14_EP400 - OVERALL FOURTH FLOOR PLAN.pdf PDF
14.05_EP0001 - SUB-BASEMENT ELECTRICAL PLAN.pdf PDF
14.19_EP900 - OVERALL NINTH FLOOR PLAN.pdf PDF
14.12_EP201 - SECOND FLOOR ELECTRICAL PLAN.pdf PDF
14.01_E500 - SCHEDULES, DETAILS AND SINGLE-LINE DIAGRAM.pdf PDF
260511 Req Electric.pdf PDF
033053 Cast in Place Conrete.pdf PDF
013216-15 Schedules 2.pdf PDF
013323 Shop Drawings.pdf PDF
014219 Ref Standards.pdf PDF
14.20_ES100 - ELECTRICAL SITE PLAN.pdf PDF
14.18_EP800 - OVERALL EIGHT FLOOR PLAN.pdf PDF
14.15_EP500 - OVERALL FIFTH FLOOR PLAN.pdf PDF
14.09_EP100 - OVERALL FIRST FLOOR PLAN.pdf PDF
14.17_EP700 - OVERALL SEVENTH FLOOR PLAN.pdf PDF
14.08_EP001B - BASEMENT ELECTRICAL PLAN-B.pdf PDF
14.00_E001 - LEGEND.pdf PDF
S15-PPQ-Template (Project 603-20-505) Upgrade 480V Electrical System.pdf PDF
323113 Chain Link Gates.pdf PDF
010000 Gen Requirments Rev 2.pdf PDF
000115 List Drawing.pdf PDF
040513 Masonry Mortaring.pdf PDF
042000 Unit Masonry.pdf PDF
017419 Const Waste Management.pdf PDF
000110 TOC.pdf PDF
00.00_GI000 - COVER SHEET AND SHEET INDEX.pdf PDF
14.07_EP001A - BASEMENT ELECTRICAL PLAN-A.pdf PDF
07.00_AE101 - SCREEN WALL DETAILS.pdf PDF
14.06_EP000 - OVERALL BASEMENT ELECTRICAL PLAN.pdf PDF
14.02_E501 - PARTIAL MEDIUM VOLTAGE SINGLE-LINE DIAGRAM.pdf PDF
S02-36C24921R0084_1.pdf PDF
263623 ATS.pdf PDF
260541 Underground Elec Const.pdf PDF
262416 Panelboards.pdf PDF
S03-Successful FBO Posting-36C24921R0084 (603-20-505).pdf PDF
Show all 50

Upgrade 480V Electrical System has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Louisville KY - Robley Rex VAMC – Upgrade 480V Electrical System

Project #: 603-20-505 01-01-17

26 43 13 - 1

SECTION 26 43 13

SURGE PROTECTIVE DEVICES

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section specifies the furnishing, installation, and connection of

Type 2 Surge Protective Devices, as defined in NFPA 70, and indicated as SPD in this section.

1.2 RELATED WORK

A. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS:

Requirements that apply to all sections of Division 26.

B. Section 26 24 16, PANELBOARDS: For factory-installed or external SPD.

1.3 QUALITY ASSURANCE

A. Quality Assurance shall be in accordance with Paragraph, QUALIFICATIONS

(PRODUCTS AND SERVICES) in Section 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS.

1.4 SUBMITTALS

A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements:

1. Shop Drawings:

a. Submit sufficient information to demonstrate compliance with drawings and specifications.

b. Include electrical ratings and device nameplate data.

2. Manuals:

a. Submit, simultaneously with the shop drawings, companion copies of complete maintenance and operating manuals including technical data sheets, wiring diagrams, and information for ordering replacement parts.

b. If changes have been made to the maintenance and operating manuals originally submitted, submit updated maintenance and operating manuals two weeks prior to the final inspection.

3. Certifications: Two weeks prior to final inspection, submit the following.

a. Certification by the manufacturer that the SPD conforms to the requirements of the drawings and specifications.

b. Certification by the Contractor that the SPD has been properly installed.

01-01-17

26 43 13 - 2

1.5 APPLICABLE PUBLICATIONS

A. Publications listed below (including amendments, addenda, revisions, supplement and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only.

B. Institute of Engineering and Electronic Engineers (IEEE):

IEEE C62.41.2-02........Characterization of Surges in Low-Voltage (1000

V and Less) AC Power Circuits

IEEE C62.45-08..........Surge Testing for Equipment Connected to Low-

Voltage (1000 V and Less) AC Power Circuits

C. National Fire Protection Association (NFPA):

70-17...................National Electrical Code (NEC)

D. Underwriters Laboratories, Inc. (UL):

UL 1283-15..............Electromagnetic Interference Filters

UL 1449-14..............Surge Protective Devices

PART 2 - PRODUCTS

2.1 PANELBOARD SPD

A. General Requirements:

1. Comply with UL 1449 and IEEE C62.41.2.

2. Modular design with field-replaceable modules, or non-modular design.

3. Fuses, rated at 200 kA interrupting capacity.

4. Bolted compression lugs for internal wiring.

5. Integral disconnect switch.

6. Redundant suppression circuits.

7. LED indicator lights for power and protection status.

8. Audible alarm, with silencing switch, to indicate when protection has failed.

9. Form-C contacts rated at 5 A and 250-V ac, one normally open and one normally closed, for remote monitoring of protection status.

Contacts shall reverse on failure of any surge diversion module or on opening of any current-limiting device.

10. Four-digit transient-event counter.

B. Surge Current per Phase: Minimum 120kA per phase.

2.2 ENCLOSURES

A. Enclosures: NEMA 1.

01-01-17

26 43 13 - 3

PART 3 - EXECUTION

3.1 INSTALLATION

A. Installation shall be in accordance with the NEC, as shown on the drawings, and manufacturer’s instructions.

B. Factory-installed SPD: Switchgear, switchboard, or panelboard manufacturer shall install SPD at the factory.

C. Field-installed SPD: Contractor shall install SPD with conductors or buses between SPD and points of attachment as short and straight as possible. Do not exceed manufacturer's recommended lead length. Do not bond neutral and ground.

1. Provide a circuit breaker as a dedicated disconnecting means for

TVSS as shown on drawings.

D. Do not perform insulation resistance tests on switchgear, switchboards, panelboards, or feeders with the SPD connected. Disconnect SPD before conducting insulation resistance tests, and reconnect SPD immediately after insulation resistance tests are complete.

3.2 ACCEPTANCE CHECKS AND TESTS

A. Perform in accordance with the manufacturer's recommendations. In addition, include the following:

1. Visual Inspection and Tests:

a. Compare equipment nameplate data with specifications and approved shop drawings.

b. Inspect physical, electrical, and mechanical condition.

c. Verify that disconnecting means and feeder size and maximum length to SPD corresponds to approved shop drawings.

d. Verifying tightness of accessible bolted electrical connections by calibrated torque-wrench method.

e. Vacuum-clean enclosure interior. Clean enclosure exterior.

f. Verify the correct operation of all sensing devices, alarms, and indicating devices.

3.3 FOLLOW-UP VERIFICATION

A. After completion of acceptance checks and tests, the Contractor shall show by demonstration in service that SPD are in good operating condition and properly performing the intended function.

3.4 INSTRUCTION

A. Provide the services of a factory-trained technician for one 2-hour training period for instructing personnel in the maintenance and operation of the SPD, on the date requested by the COR.