Upgrade 480V Electrical System Federal contract opportunity
Solicitation number
36C24921R0084
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This document contains specifications for upgrading an electrical system at a Department of Veterans Affairs medical facility. The contractor shall furnish all material, equipment, and labor to install a new 1150 KVA transformer with pad and barrier walls. They shall also upgrade the existing 480V electrical system per the specifications and drawings provided. This includes correcting wiring deficiencies for CAT scan rooms, and moving electrical feeds for several air handlers and associated chilled water pumps and controls to emergency power circuits. The contractor must adhere to the detailed product and installation requirements outlined in the specifications.

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade 480V Electrical System, newest first.
File Type Posted
KY20210093 Wage Determination.pdf PDF
Pad-mount Med V Xforms.pdf PDF
36C24921R0084 0003.pdf PDF
36C24921R0084_1.pdf PDF
36C24921R0084 0002.pdf PDF
36C24921R0084 0001.pdf PDF
265600 Ext Lighting.pdf PDF
312011 Earthwork.pdf PDF
260526 Grounding and Bonding.pdf PDF
260533 Raceway and Boxes.pdf PDF
262413 Distribution Switchboard.pdf PDF
260513 Med Voltage Cables.pdf PDF
018113 Sustainable Construction Requirements.pdf PDF
040516 Masonry Grouting2.pdf PDF
14.10_EP101 - FIRST FLOOR ELECTRICAL PLAN.pdf PDF
14.14_EP400 - OVERALL FOURTH FLOOR PLAN.pdf PDF
14.05_EP0001 - SUB-BASEMENT ELECTRICAL PLAN.pdf PDF
14.19_EP900 - OVERALL NINTH FLOOR PLAN.pdf PDF
14.12_EP201 - SECOND FLOOR ELECTRICAL PLAN.pdf PDF
14.01_E500 - SCHEDULES, DETAILS AND SINGLE-LINE DIAGRAM.pdf PDF
260511 Req Electric.pdf PDF
033053 Cast in Place Conrete.pdf PDF
013216-15 Schedules 2.pdf PDF
013323 Shop Drawings.pdf PDF
014219 Ref Standards.pdf PDF
14.20_ES100 - ELECTRICAL SITE PLAN.pdf PDF
14.18_EP800 - OVERALL EIGHT FLOOR PLAN.pdf PDF
14.15_EP500 - OVERALL FIFTH FLOOR PLAN.pdf PDF
14.09_EP100 - OVERALL FIRST FLOOR PLAN.pdf PDF
14.17_EP700 - OVERALL SEVENTH FLOOR PLAN.pdf PDF
14.08_EP001B - BASEMENT ELECTRICAL PLAN-B.pdf PDF
14.00_E001 - LEGEND.pdf PDF
S15-PPQ-Template (Project 603-20-505) Upgrade 480V Electrical System.pdf PDF
323113 Chain Link Gates.pdf PDF
010000 Gen Requirments Rev 2.pdf PDF
000115 List Drawing.pdf PDF
040513 Masonry Mortaring.pdf PDF
042000 Unit Masonry.pdf PDF
017419 Const Waste Management.pdf PDF
000110 TOC.pdf PDF
00.00_GI000 - COVER SHEET AND SHEET INDEX.pdf PDF
14.07_EP001A - BASEMENT ELECTRICAL PLAN-A.pdf PDF
07.00_AE101 - SCREEN WALL DETAILS.pdf PDF
14.06_EP000 - OVERALL BASEMENT ELECTRICAL PLAN.pdf PDF
14.02_E501 - PARTIAL MEDIUM VOLTAGE SINGLE-LINE DIAGRAM.pdf PDF
S02-36C24921R0084_1.pdf PDF
264313 Surge Prot Dev.pdf PDF
260541 Underground Elec Const.pdf PDF
262416 Panelboards.pdf PDF
S03-Successful FBO Posting-36C24921R0084 (603-20-505).pdf PDF
Show all 50

Upgrade 480V Electrical System has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Louisville KY - Robley Rex VAMC – Upgrade 480V Electrical System

Project #: 603-20-505 01-01-17

26 36 23 - 1

SECTION 26 36 23

AUTOMATIC TRANSFER SWITCHES

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section specifies the furnishing, installation, connection, and testing of open-transition automatic transfer switches with bypass isolation, indicated as automatic transfer switches or ATS in this section.

1.2 RELATED WORK

A. Section 03 30 53, CAST-IN-PLACE CONCRETE: Requirements for concrete equipment pads.

B. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS:

Requirements that apply to all sections of Division 26.

C. Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES:

Low-voltage conductors.

D. Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS:

Requirements for personal safety and to provide a low impedance path for possible ground fault currents.

E. Section 26 05 33, RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS: Conduits.

F. Section 26 05 73, OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY:

Short circuit and coordination study, and requirements for a coordinated electrical system.

1.3 QUALITY ASSURANCE

A. Quality Assurance shall be in accordance with Paragraph, QUALIFICATIONS

(PRODUCTS AND SERVICES) in Section 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS.

B. A factory-authorized representative shall be capable of providing emergency maintenance and repairs at the project site within 4 hours maximum of notification.

C. Automatic transfer switch, bypass/isolation switch, and annunciation control panels shall be products of the same manufacturer.

1.4 FACTORY TESTS

A. ATS shall be thoroughly tested at the factory to assure that there are no electrical or mechanical defects.

B. Factory Tests shall be in accordance with Paragraph, MANUFACTURED

PRODUCTS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL

INSTALLATIONS, and the following requirements:

01-01-17

26 36 23 - 2

1. Perform visual inspection to verify that each ATS is as specified.

2. Perform mechanical test to verify that ATS sections are free of mechanical defects.

3. Perform insulation resistance test to ensure electrical integrity and continuity of entire system.

4. Perform main switch contact resistance test.

5. Perform electrical tests to verify complete system electrical operation.

1.5 SUBMITTALS

A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements:

1. Shop Drawings:

a. Submit sufficient information to demonstrate compliance with drawings and specifications.

b. Include voltage rating, continuous current rating, number of phases, withstand and closing rating, dimensions, weights, mounting details, conduit entry provisions, front view, side view, equipment and device arrangement, elementary and interconnection wiring diagrams, factory relay settings, and accessories.

c. For automatic transfer switches that are networked together to a common means of annunciation and/or control, submit interconnection diagrams as well as site and building plans, showing connections for normal and emergency sources of power, load, control and annunciation components, and interconnecting communications paths. Equipment locations on the diagrams and plans shall match the site, building, and room designations on the drawings.

d. Complete nameplate data, including manufacturer's name and catalog number.

e. A copy of the markings that are to appear on the automatic transfer switches when installed.

2. Manuals:

a. Submit, simultaneously with the shop drawings, companion copies of complete maintenance and operating manuals, including technical data sheets, wiring diagrams, and information for ordering replacement parts.

01-01-17

26 36 23 - 3

1) Schematic signal and control diagrams, with all terminals identified, matching terminal identification in the automatic transfer switches.

2) Include information for testing, repair, troubleshooting, assembly, disassembly, and factory recommended/required periodic maintenance procedures and frequency.

3) Provide a replacement and spare parts list. Include a list of tools and instruments for testing and maintenance purposes.

b. If changes have been made to the maintenance and operating manuals originally submitted, submit updated maintenance and operating manuals two weeks prior to the final inspection.

1) Include complete "As Installed" diagrams that indicate all pieces of equipment and their interconnecting wiring.

2) Include complete diagrams of the internal wiring for each piece of equipment, including "As Installed" revisions of the diagrams.

3) The wiring diagrams shall identify the terminals to facilitate installation, maintenance, operation, and testing.

3. Certifications:

a. When submitting the shop drawings, submit a certified test report from a recognized independent testing laboratory that a representative sample has passed UL 1008 prototype testing.

b. Two weeks prior to final inspection, submit the following.

1) Certification by the manufacturer that the ATS conform to the requirements of the drawings and specifications.

2) Certification by the Contractor that transfer switches have been properly installed, adjusted, and tested.

1.6 APPLICABLE PUBLICATIONS

A. Publications listed below (including amendments, addenda, revisions, supplements, and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by designation only.

B. Institute of Electrical and Electronic Engineers (IEEE):

446-95..................Emergency and Standby Power Systems for

Industrial and Commercial Applications

C37.90.1-12.............Surge Withstand Capability (SWC) Tests for

Relays and Relay Systems Associated with

Electric Power Apparatus

01-01-17

26 36 23 - 4

C62.41.1-02.............Guide on the Surges Environment in Low-Voltage

(1000 V and Less) AC Power Circuits

C62.41.2-02.............Recommended Practice on Characterization of

Surges in Low-Voltage (1000 V and Less) AC

Power Circuits

C. International Code Council (ICC):

IBC-15..................International Building Code

D. National Electrical Manufacturers Association (NEMA):

250-14..................Enclosures for Electrical Equipment (1000 Volts

Maximum)

ICS 6-06................Enclosures

ICS 4-15................Application Guideline for Terminal Blocks

MG 1-16.................Motors and Generators

E. National Fire Protection Association (NFPA):

70–17...................National Electrical Code (NEC)

99-15...................Health Care Facilities

110-16..................Emergency and Standby Power Systems

F. Underwriters Laboratories, Inc. (UL):

50-15...................Enclosures for Electrical Equipment

508-99..................Industrial Control Equipment

891-05..................Switchboards

1008-14.................Transfer Switch Equipment

PART 2 - PRODUCTS

2.1 GENERAL REQUIREMENTS

A. Automatic transfer switch shall be manufactured by ASCO, 4000 series switch.

B. Automatic transfer switches shall comply with IEEE, NEMA, NFPA, UL, and have the following features:

1. Automatic transfer switches shall be open transition switches, 4-pole, draw-out construction, electrically operated, mechanically held open contact type, without integral overcurrent protection.

Automatic transfer switches utilizing automatic or non-automatic molded case circuit breakers, insulated case circuit breakers, or power circuit breakers as switching mechanisms are not acceptable.

2. Automatic transfer switches shall be completely factory-assembled and wired such that only external circuit connections are required in the field.

01-01-17

26 36 23 - 5

3. Ratings:

a. Phases, voltage, continuous current, poles, and withstand and closing ratings shall be as shown on the drawings.

b. Transfer switches shall be rated for continuous duty at specified continuous current rating on 60Hz systems.

c. Maximum automatic transfer switch rating: 800 A.

4. Markings:

a. Markings shall be in accordance with UL 1008.

5. Tests:

a. Automatic transfer switches shall be tested in accordance with UL

1008. The contacts of the transfer switch shall not weld during the performance of withstand and closing tests when used with the upstream overcurrent device and available fault current specified.

6. Surge Withstand Test:

a. Automatic transfer switches utilizing solid-state devices in sensing, relaying, operating, or communication equipment or circuits shall comply with IEEE C37.90.1.

7. Housing:

a. Enclose automatic transfer switches in wall- or floor-mounted steel cabinets, with metal gauge not less than No. 14, in accordance with UL 508, or in a switchboard assembly in accordance with UL 891, as shown on the drawings.

b. Enclosure shall be constructed so that personnel are protected from energized bypass-isolation components during automatic transfer switch maintenance.

c. Automatic transfer switch components shall be removable without disconnecting external source or load power conductors.

d. Finish: Cabinets shall be given a phosphate treatment, painted with rust-inhibiting primer, and finish-painted with the manufacturer's standard enamel or lacquer finish.

e. Viewing Ports: Provide viewing ports so that contacts may be inspected without disassembly.

8. Operating Mechanism:

a. Actuated by an electrical operator.

b. Electrically and mechanically interlocked so that the main contact cannot be closed simultaneously in either normal and emergency position.

01-01-17

26 36 23 - 6

c. Normal and emergency main contacts shall be mechanically locked in position by the operating linkage upon completion of transfer.

Release of the locking mechanism shall be possible only by normal operating action.

d. Contact transfer time shall not exceed six cycles.

e. Operating mechanism components and mechanical interlocks shall be insulated or grounded.

9. Contacts:

a. Main contacts: Silver alloy.

b. Neutral contacts: Silver alloy, with same current rating as phase contacts.

c. Current carrying capacity of arcing contacts shall not be used in the determination of the automatic transfer switch rating, and shall be separate from the main contacts.

d. Main and arcing contacts shall be visible for inspection with cabinet door open and barrier covers removed.

10. Manual Operator:

a. Capable of operation by one person in either direction under no load.

11. Replaceable Parts:

a. Include the main and arcing contacts individually or as units, as well as relays, and control devices.

b. Automatic transfer switch contacts and accessories shall be replaceable from the front without removing the switch from the cabinet and without removing main conductors.

12. Sensing Features:

a. Undervoltage Sensing for Each Phase of Normal Source: Sense low phase-to-ground voltage on each phase. Pickup voltage shall be adjustable from 85 to 100% of nominal, and dropout voltage is adjustable from 75 to 98% of pickup value. Factory set for pickup at 90% and dropout at 85%.

b. Adjustable Time Delay: For override of normal-source voltage sensing to delay transfer and engine start signals. Adjustable from zero to six seconds, and factory set for one second.

c. Voltage/Frequency Lockout Relay: Prevent premature transfer to the engine-generator. Pickup voltage shall be adjustable from 85 to 100% of nominal. Factory set for pickup at 90%. Pickup

01-01-17

26 36 23 - 7 frequency shall be adjustable from 90 to 100% of nominal. Factory set for pickup at 95%.

d. Time Delay for Retransfer to Normal Source: Adjustable from 0 to

30 minutes, and factory set for 10 minutes to automatically defeat delay on loss of voltage or sustained undervoltage of emergency source, provided normal supply has been restored.

e. Test Switch: Simulate normal-source failure.

f. Switch-Position Indication: Indicate source to which load is connected.

g. Source-Available Indication: Supervise sources via transfer switch normal- and emergency-source sensing circuits.

h. Normal Power Indication: Indicate "Normal Source Available."

i. Emergency Power Indication: Indicate "Emergency Source

Available."

j. Transfer Override Control: Overrides automatic retransfer control so that automatic transfer switch shall remain connected to emergency power source regardless of condition of normal source. Control panel shall indicate override status.

k. Engine Starting Contacts: One isolated and normally closed and one isolated and normally open; rated 5 A at 30 V DC minimum.

l. Engine Shutdown Contacts: Time delay adjustable from zero to 15 minutes, and factory set for 5 minutes. Contacts shall initiate shutdown at remote engine-generator controls after retransfer of load to normal source.

13. Controls:

a. Controls shall provide indication of switch status and be equipped with alarm diagnostics.

b. Controls shall control operation of the automatic transfer switches.

14. Factory Wiring: Train and bundle factory wiring and label either by color-code or by numbered/lettered wire markers. Labels shall match those on the shop drawings.

15. Annunciation, Control, and Programming Interface Components:

Devices for communicating with remote programming devices, annunciators, or control panels shall have open-protocol communication capability matched with remote device.

01-01-17

26 36 23 - 8

2.2 SEQUENCE OF OPERATION

A. The specified voltage decrease in one or more phases of the normal power source shall initiate the transfer sequence. The automatic transfer switch shall start the engine-generator(s) after a specified time delay to permit override of momentary dips in the normal power source.

B. The automatic transfer switch shall transfer the load from normal to emergency source when the frequency and voltage of the engine-generator(s) have attained the specified percent of rated value.

C. Engine Start: A voltage decrease, at any automatic transfer switch, in one or more phases of the normal power source to less than the specified value of normal shall start the engine-generator(s) after a specified time delay.

D. Transfer to Emergency System Loads: Automatic transfer switches for

Emergency System loads shall transfer their loads from normal to emergency source when frequency and voltage of the engine-generator(s) have attained the specified percent of rated value. Only those switches with deficient normal source voltage shall transfer.

E. Transfer to Equipment Branch Loads: Automatic transfer switches for

Equipment Branch loads shall transfer their loads to the engine-generator on a time-delayed, staggered basis, after the Emergency

System switches have transferred. Only those switches with deficient normal source voltage shall transfer.

F. Retransfer to Normal (All Loads): Automatic transfer switches shall retransfer the load from emergency to normal source upon restoration of normal supply in all phases to the specified percent or more of normal voltage, and after a specified time delay. Should the emergency source fail during this time, the automatic transfer switches shall immediately transfer to the normal source whenever it becomes available. After restoring to normal source, the engine-generator(s) shall continue to run unloaded for a specified interval before shut-down.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install automatic transfer switches and associated remote components in accordance with the NEC, as shown on the drawings, and manufacturer’s instructions.

01-01-17

26 36 23 - 9

B. Anchor automatic transfer switches with rustproof bolts, nuts, and washers not less than 12 mm (1/2 inch) diameter, in accordance with manufacturer’s instructions, and as shown on drawings.

3.2 ACCEPTANCE CHECKS AND TESTS

A. An authorized representative of the automatic transfer switch manufacturer shall technically supervise and participate during all of the field adjustments and tests. Major adjustments and field tests shall be witnessed by the COR. The manufacturer’s representative shall certify in writing that the equipment has been installed, adjusted and tested in accordance with the manufacturer’s recommendations.

B. Perform manufacturer’s required field tests in accordance with the manufacturer's recommendations. In addition, include the following:

1. Visual Inspection and Tests:

a. Compare equipment nameplate data with specifications and approved shop drawings.

b. Inspect physical, electrical, and mechanical condition.

c. Confirm correct application of manufacturer's recommended lubricants.

d. Verify appropriate anchorage, required area clearances, and correct alignment.

e. Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method, or performing thermographic survey after energization.

f. Verify grounding connections.

g. Verify ratings of sensors.

h. Vacuum-clean enclosure interior. Clean enclosure exterior.

i. Exercise all active components.

j. Verify that manual transfer warning signs are properly placed.

k. Verify the correct operation of all sensing devices, alarms, and indicating devices.

2. Electrical tests:

a. Perform insulation-resistance tests.

b. After energizing circuits, demonstrate the interlocking sequence and operational function for each automatic transfer switch at least three times.

1) Test bypass-isolation unit functional modes and related automatic transfer switch operations.

01-01-17

26 36 23 - 10

2) Power failure of normal source shall be simulated by opening upstream protective device. This test shall be performed a minimum of five times.

3) Power failure of emergency source with normal source available shall be simulated by opening upstream protective device for emergency source. This test shall be performed a minimum of five times.

4) Low phase-to-ground voltage shall be simulated for each phase of normal source.

5) Operation and settings shall be verified for specified automatic transfer switch operational feature, such as override time delay, transfer time delay, return time delay, engine shutdown time delay, exerciser, auxiliary contacts, and supplemental features.

6) Verify pickup and dropout voltages by data readout or inspection of control settings.

c. Ground-fault tests: Verify that operation of automatic transfer switches shall not cause nuisance tripping or alarms of ground fault protection on either source.

d. When any defects are detected, correct the defects and repeat the tests as requested by the COR at no additional cost to the

Government.

3.3 FIELD SETTINGS VERIFICATION

A. The automatic transfer switch settings shall be verified in the field by an authorized representative of the manufacturer.

3.4 FOLLOW-UP VERIFICATION

A. Upon completion of acceptance checks and tests, the Contractor shall show by demonstration in service that the automatic transfer switches are in good operating condition and properly performing the intended function.

3.5 INSTRUCTION

A. Furnish the services of a factory-trained technician for one 4-hour training period for instructing personnel in the maintenance and operation of the automatic transfer switches, on the dates requested by the COR.

---END---