Unit Training Equipment Site (UTES) at Camp Edwards, MA

Award Notice Posted

Solicitation number
W912SV-13-R-0001
Agency
Awarded
to Nauset Construction Corporation
Set-aside
Total Small Business

Opportunity facts

Contract number
W912SV-13-C-0007 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Camp Edwards, MA, Massachusetts, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

Awarded Contractor: Nauset Construction Corp.
Cage Code: 54YG6
Contract No.: W912SV-13-C-0007
Effective Date of Award: 1 November 2013
Project No.: 250065 Project Title: Unit Training Equipment Site (UTES)
Period of Performance: 669 calendar days after receipt of Notice to Proceed
Purchas Request No.: 0010414225

Amount of Award: $20,521,828.00 (Inclusive of CLINs 0001-0003 and 0009-00016)

Update #4 ·

The package labeled "Missing Mechanical & Plumbing Specifications as described in Question 1" is not a valid package.  DO NOT USE.

The correct documents will be posted by close of business today, 2 July 2013.

Update #3 ·

The Massachusetts National Guard intends to issue a Request for Proposal (RFP) to award a single firm fixed-price contract for Construction of a Unit Training Equipment Site (UTES) at Camp Edwards, MA; Project Number 250065. The project will consist of constructing a new Unit Training Equipment Site (UTES) Building for the Massachusetts National Guard. The Contractor will provide all labor, materials, equipment, and supervision necessary to perform all work required in strict accordance with the detailed requirements of the technical provisions. The project proposes the phased new construction of a Unit Training Equipment Site (UTES) building. Phase I: Provide all materials, labor, and equipment to construct the main building of the new UTES facility including administrative and support areas along with multiple vehicle work bays and site and support amenities. The main building of the UTES facility is approximately 45,389 sq/ft. Phase II: Provide all materials, labor, and equipment for the demolition of the existing UTES building, including removal of hazardous material, and the construction of a new Controlled Humidity Shelter at the same location. The Controlled Humidity Shelter is approximately19,041 sq/ft. The project would be designed to secure a Leadership in Energy and Environmental Design (LEED) quote mark Silver quote mark rating, at a minimum, from the US Green Building Council (USGBC). Options for this project: 1. Provide Emblem Plaque at Vestibule, 2. Provide Dimensional Letter Signage, 3. Provide Shower Curtains, 4. Provide Fire Extinguishers, 5. Provide Portable Pressure Washer, 6. Delete 4 Hydronic Unit Heaters/Provide Dry-Pipe Sprinkler System Coverage, 7. Delete Flexible Pavement Material/Provide Concrete Pavement Material, and 8. Delete Graded Crushed Stone/Provide and Install Reclaimed Base Course Material. This project includes Unit Priced Line Items: 1. Concrete Piers and Shafts. This project includes Owner Furnished Equipment to include, but is not limited to, existing dehumidification units which are to be installed in Phase II of the project in accordance with the plans and specifications. The work of this project includes receiving, unloading, handling, storing, protecting, and installing the Owner Furnished Equipment. For work requiring that existing items be relocated and includes, where required, all effort for disconnecting and dismantling, loading, and delivery to the site in addition to previously stated.
The magnitude of the project is between $10 million to $25 million. The North American Industry Classification System (NAICS) code for this effort is 236220. This is a TOTAL SMALL BUSINESS SET-ASIDE and the Small Business Administration (SBA) size standard is $33.5 million. Construction completion time is 669 calendar days. Your attention is directed to FAR CLAUSE 52.219-14 (b)(4) LIMITATIONS ON SUBCONTRACTING which states, quote mark By submission of an offer and execution of a contract, the Offeror /Contractor agrees that in performance of the contract in the case of a contract for Construction by a general contractors, the concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees quote mark applies to this project. The tentative date for issuing the solicitation is on or about 1 June 2013. The tentative date for the pre-proposal conference is on or about 13 June 2013, 10:00 a.m. local time at the Army Facilities Engineering Building, Camp Edwards, MA. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-proposal conference. The solicitation closing date is scheduled for on-or-about 29 July 2013. Actual dates and times will be identified in the solicitation. The source selection process will be conducted in accordance with FAR Part 15.3 and DFARS Part 215.3, source selection procedures. Evaluation factors include Technical, Past Performance and Price. The Government intends to award without discussions. Effective May 29, 2012 Government systems such as CCR and ORCA (on-line representations and certifications) are migrating to in System for Award Management (SAM). Interested offerors must be registered in SAM. To register go to: https://www.sam.gov/portal/public/SAM/. You will need your DUNS number register. Instructions for registering are on the web page. The solicitation and associated information and the plans and specifications will be available only from the Federal Business Opportunities (FedBizOpps) website on-line at https://www.fbo.gov/ . FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system. FedBizOpps registration requires the following information: 1) Central Contractor Registration (CCR) Marketing Partner Identification Number (MPIN), 2) DUNS Number and CAGE Code, 3) Telephone Number, 4) Email address. Registration instructions can be found on the FedBizOpps website at https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf. (Please note the registration for access to the secure site takes approximately 15 business days. PLAN ACCORDINGLY) Reference paragraph 4.7 of the Vendor Guide for instructions to obtain a MPIN to retrieve the specification and drawing documents. Contractors who do not already have a MPIN are advised that the normal processing is 7 to 15 business days to obtain a MPIN password that will give them access to the plans and specifications, which are located in the controlled access location on FBO. See video in vendor guide at 3.3 on advanced functions for other information. Bidders/offerors who have registered with FedBizOpps must access the data for this solicitation with their MPIN. Bidders/Offerors cannot log into the FedBizOpps home page and search for data. This solicitation is not a competitive bid and there will not be a formal public bid opening. DISCLAIMER: The official plans and specification are located on the official government web page and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to the FedBizOpps page for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies. All inquiries must be in writing, preferable via email to the persons specified in the solicitation. All answers will be provided in writing via posting to the web. Place of performance is at Camp Edwards, MA.

Update #2 ·

The Massachusetts National Guard intends to issue a Request for Proposal (RFP) to award a single firm fixed-price contract for Construction of a Unit Training Equipment Site (UTES) at Camp Edwards, MA; Project Number 250065. The project will consist of constructing a new Unit Training Equipment Site (UTES) Building for the Massachusetts National Guard. The Contractor will provide all labor, materials, equipment, and supervision necessary to perform all work required in strict accordance with the detailed requirements of the technical provisions. The project proposes the phased new construction of a Unit Training Equipment Site (UTES) building. Phase I: Provide all materials, labor, and equipment to construct the main building of the new UTES facility including administrative and support areas along with multiple vehicle work bays and site and support amenities. The main building of the UTES facility is approximately 45,389 sq/ft. Phase II: Provide all materials, labor, and equipment for the demolition of the existing UTES building, including removal of hazardous material, and the construction of a new Controlled Humidity Shelter at the same location. The Controlled Humidity Shelter is approximately19,041 sq/ft. The project would be designed to secure a Leadership in Energy and Environmental Design (LEED) quote mark Silver quote mark rating, at a minimum, from the US Green Building Council (USGBC). Options for this project: 1. Provide Emblem Plaque at Vestibule, 2. Provide Dimensional Letter Signage, 3. Provide Shower Curtains, 4. Provide Fire Extinguishers, 5. Provide Portable Pressure Washer, 6. Delete 4 Hydronic Unit Heaters/Provide Dry-Pipe Sprinkler System Coverage, 7. Delete Flexible Pavement Material/Provide Concrete Pavement Material, and 8. Delete Graded Crushed Stone/Provide and Install Reclaimed Base Course Material. This project includes Unit Priced Line Items: 1. Concrete Piers and Shafts. This project includes Owner Furnished Equipment to include, but is not limited to, existing dehumidification units which are to be installed in Phase II of the project in accordance with the plans and specifications. The work of this project includes receiving, unloading, handling, storing, protecting, and installing the Owner Furnished Equipment. For work requiring that existing items be relocated and includes, where required, all effort for disconnecting and dismantling, loading, and delivery to the site in addition to previously stated.
The magnitude of the project is between $10 million to $25 million. The North American Industry Classification System (NAICS) code for this effort is 236220. This is a TOTAL SMALL BUSINESS SET-ASIDE and the Small Business Administration (SBA) size standard is $33.5 million. Construction completion time is 669 calendar days. Your attention is directed to FAR CLAUSE 52.219-14 (b)(4) LIMITATIONS ON SUBCONTRACTING which states, quote mark By submission of an offer and execution of a contract, the Offeror /Contractor agrees that in performance of the contract in the case of a contract for Construction by a general contractors, the concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees quote mark applies to this project. The tentative date for issuing the solicitation is on or about 19 June 2013. The tentative date for the pre-proposal conference is on or about 1 July 2013, 9:00 a.m. local time at the Welcome Center on Camp Edwards, MA. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-proposal conference. The solicitation closing date is scheduled for on-or-about 2 August 2013. Actual dates and times will be identified in the solicitation. The source selection process will be conducted in accordance with FAR Part 15.3 and DFARS Part 215.3, source selection procedures. Evaluation factors include Technical, Past Performance and Price. The Government intends to award without discussions. Effective May 29, 2012 Government systems such as CCR and ORCA (on-line representations and certifications) are migrating to in System for Award Management (SAM). Interested offerors must be registered in SAM. To register go to: https://www.sam.gov/portal/public/SAM/. You will need your DUNS number register. Instructions for registering are on the web page. The solicitation and associated information and the plans and specifications will be available only from the Federal Business Opportunities (FedBizOpps) website on-line at https://www.fbo.gov/ . FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system. FedBizOpps registration requires the following information: 1) Central Contractor Registration (CCR) Marketing Partner Identification Number (MPIN), 2) DUNS Number and CAGE Code, 3) Telephone Number, 4) Email address. Registration instructions can be found on the FedBizOpps website at https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf. (Please note the registration for access to the secure site takes approximately 15 business days. PLAN ACCORDINGLY) Reference paragraph 4.7 of the Vendor Guide for instructions to obtain a MPIN to retrieve the specification and drawing documents. Contractors who do not already have a MPIN are advised that the normal processing is 7 to 15 business days to obtain a MPIN password that will give them access to the plans and specifications, which are located in the controlled access location on FBO. See video in vendor guide at 3.3 on advanced functions for other information. Bidders/offerors who have registered with FedBizOpps must access the data for this solicitation with their MPIN. Bidders/Offerors cannot log into the FedBizOpps home page and search for data. This solicitation is not a competitive bid and there will not be a formal public bid opening. DISCLAIMER: The official plans and specification are located on the official government web page and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to the FedBizOpps page for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies. All inquiries must be in writing, preferable via email to the persons specified in the solicitation. All answers will be provided in writing via posting to the web. Place of performance is at Camp Edwards, MA.

Update #1 ·

The Massachusetts National Guard intends to issue a Request for Proposal (RFP) to award a single firm fixed-price contract for Construction of a Unit Training Equipment Site (UTES) at Camp Edwards, MA; Project Number 250065. The project will consist of constructing a new Unit Training Equipment Site (UTES) Building for the Massachusetts National Guard. The Contractor will provide all labor, materials, equipment, and supervision necessary to perform all work required in strict accordance with the detailed requirements of the technical provisions. The project proposes the phased new construction of a Unit Training Equipment Site (UTES) building. Phase I: Provide all materials, labor, and equipment to construct the main building of the new UTES facility including administrative and support areas along with multiple vehicle work bays and site and support amenities. The main building of the UTES facility is approximately 45,389 sq/ft. Phase II: Provide all materials, labor, and equipment for the demolition of the existing UTES building, including removal of hazardous material, and the construction of a new Controlled Humidity Shelter at the same location. The Controlled Humidity Shelter is approximately19,041 sq/ft. The project would be designed to secure a Leadership in Energy and Environmental Design (LEED) quote mark Silver quote mark rating, at a minimum, from the US Green Building Council (USGBC). Options for this project: 1. Provide Emblem Plaque at Vestibule, 2. Provide Dimensional Letter Signage, 3. Provide Shower Curtains, 4. Provide Fire Extinguishers, 5. Provide Portable Pressure Washer, 6. Delete 4 Hydronic Unit Heaters/Provide Dry-Pipe Sprinkler System Coverage, 7. Delete Flexible Pavement Material/Provide Concrete Pavement Material, and 8. Delete Graded Crushed Stone/Provide and Install Reclaimed Base Course Material. This project includes Unit Priced Line Items: 1. Concrete Piers and Shafts. This project includes Owner Furnished Equipment to include, but is not limited to, existing dehumidification units which are to be installed in Phase II of the project in accordance with the plans and specifications. The work of this project includes receiving, unloading, handling, storing, protecting, and installing the Owner Furnished Equipment. For work requiring that existing items be relocated and includes, where required, all effort for disconnecting and dismantling, loading, and delivery to the site in addition to previously stated.
The magnitude of the project is between $10 million to $25 million. The North American Industry Classification System (NAICS) code for this effort is 236220. This is a TOTAL SMALL BUSINESS SET-ASIDE and the Small Business Administration (SBA) size standard is $33.5 million. Construction completion time is 669 calendar days. Your attention is directed to FAR CLAUSE 52.219-14 (b)(4) LIMITATIONS ON SUBCONTRACTING which states, quote mark By submission of an offer and execution of a contract, the Offeror /Contractor agrees that in performance of the contract in the case of a contract for Construction by a general contractors, the concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees quote mark applies to this project. The tentative date for issuing the solicitation is on or about 1 June 2013. The tentative date for the pre-proposal conference is on or about 13 June 2013, 10:00 a.m. local time at the Army Facilities Engineering Building, Camp Edwards, MA. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-proposal conference. The solicitation closing date is scheduled for on-or-about 29 July 2013. Actual dates and times will be identified in the solicitation. The source selection process will be conducted in accordance with FAR Part 15.3 and DFARS Part 215.3, source selection procedures. Evaluation factors include Technical, Past Performance and Price. The Government intends to award without discussions. Effective May 29, 2012 Government systems such as CCR and ORCA (on-line representations and certifications) are migrating to in System for Award Management (SAM). Interested offerors must be registered in SAM. To register go to: https://www.sam.gov/portal/public/SAM/. You will need your DUNS number register. Instructions for registering are on the web page. The solicitation and associated information and the plans and specifications will be available only from the Federal Business Opportunities (FedBizOpps) website on-line at https://www.fbo.gov/ . FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system. FedBizOpps registration requires the following information: 1) Central Contractor Registration (CCR) Marketing Partner Identification Number (MPIN), 2) DUNS Number and CAGE Code, 3) Telephone Number, 4) Email address. Registration instructions can be found on the FedBizOpps website at https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf. (Please note the registration for access to the secure site takes approximately 15 business days. PLAN ACCORDINGLY) Reference paragraph 4.7 of the Vendor Guide for instructions to obtain a MPIN to retrieve the specification and drawing documents. Contractors who do not already have a MPIN are advised that the normal processing is 7 to 15 business days to obtain a MPIN password that will give them access to the plans and specifications, which are located in the controlled access location on FBO. See video in vendor guide at 3.3 on advanced functions for other information. Bidders/offerors who have registered with FedBizOpps must access the data for this solicitation with their MPIN. Bidders/Offerors cannot log into the FedBizOpps home page and search for data. This solicitation is not a competitive bid and there will not be a formal public bid opening. DISCLAIMER: The official plans and specification are located on the official government web page and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to the FedBizOpps page for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies. All inquiries must be in writing, preferable via email to the persons specified in the solicitation. All answers will be provided in writing via posting to the web. Place of performance is at Camp Edwards, MA.

Files

File Type Posted
UTES_Amendment_6.pdf PDF
Q A_7_FINAL_15_August13.pdf PDF
UTES_Amendment_5.pdf PDF
Q A_6_4August13.pdf PDF
Q A_5_1August13.pdf PDF
REVISED_EXHIBIT_C_UTES.doc DOC document
UTES_Amendment_4.pdf PDF
Q A_4_24Jul13.pdf PDF
Q A_3_18Jul13.pdf PDF
Amendment_3.pdf PDF
UTES_Amendment_2.pdf PDF
Q A_2_2July13.pdf PDF
UTES_Amendment_1.pdf PDF
220513_common_motor_requirements_for_plumbing_equipment.pdf PDF
220500_common_work_results_for_plumbing.pdf PDF
220529_hangers_and_supports_for_plumbing_piping_and_equipment.pdf PDF
221116_domestic_water_piping.pdf PDF
224500_emergency_plumbing_fixtures.pdf PDF
221316_sanitary_waste_and_vent_piping.pdf PDF
220700_plumbign_insulation.pdf PDF
220523_general-duty_valves_for_plumbing_piping.pdf PDF
UTES_Q A_as_of_02_July_2013.pdf PDF
Preproposal_slides_UTES__01_June_2013.pdf PDF
Sign_In_sheet.pdf PDF
Q A_1_27June13.pdf PDF
EXHIBIT_C_UTES.doc DOC document
EXHIBIT_D_UTES.doc DOC document
EXHIBIT_E_UTES.docx DOCX document
EXHIBIT_A_UTES.doc DOC document
W912SV13R0001_Solicitation.pdf PDF
Instructions_for_Access.docx DOCX document
Show all 31

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity