Unit Training Equipment Site (UTES) at Camp Edwards, MA
Solicitation number
W912SV-13-R-0001
Issued by

About this file

Question and Answers Document 3 as of 18 July 2013

View the file

Other files

File Type Posted
UTES_Amendment_6.pdf PDF
Q A_7_FINAL_15_August13.pdf PDF
UTES_Amendment_5.pdf PDF
Q A_6_4August13.pdf PDF
Q A_5_1August13.pdf PDF
REVISED_EXHIBIT_C_UTES.doc DOC document
UTES_Amendment_4.pdf PDF
Q A_4_24Jul13.pdf PDF
Amendment_3.pdf PDF
UTES_Amendment_2.pdf PDF
Q A_2_2July13.pdf PDF
UTES_Amendment_1.pdf PDF
220513_common_motor_requirements_for_plumbing_equipment.pdf PDF
221316_sanitary_waste_and_vent_piping.pdf PDF
224500_emergency_plumbing_fixtures.pdf PDF
220500_common_work_results_for_plumbing.pdf PDF
220529_hangers_and_supports_for_plumbing_piping_and_equipment.pdf PDF
221116_domestic_water_piping.pdf PDF
220700_plumbign_insulation.pdf PDF
220523_general-duty_valves_for_plumbing_piping.pdf PDF
UTES_Q A_as_of_02_July_2013.pdf PDF
Preproposal_slides_UTES__01_June_2013.pdf PDF
Sign_In_sheet.pdf PDF
Q A_1_27June13.pdf PDF
EXHIBIT_D_UTES.doc DOC document
EXHIBIT_A_UTES.doc DOC document
EXHIBIT_C_UTES.doc DOC document
EXHIBIT_E_UTES.docx DOCX document
W912SV13R0001_Solicitation.pdf PDF
Instructions_for_Access.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS PERTAINING TO SOLICITATION

W912SV-13-R-0001

Dated 18 July 2013

Q1. We applied for the certification by JCP a number of weeks ago and unfortunately, we have not yet received a response. Are CDs available for this project?

Q1 ANSWER REVISED: Contact the U.S./Canada Joint Certification Office at 1-(800)-352-3572 or via email at jcp-admin@dla.mil to check on the status of your application. REVISED: CDs are available for this project depending on the circumstances. JCP will be contacted to confirm receipt of application.

Q2. I am trying to access the export controlled packages with my assigned MPIN but it is not working.

Q2 ANSWER: According to the U.S./Canada Joint Certification Program (JCP) office, once a company is certified with the JCP office (typically 7 to 12 business days), the company should contact FedBizzOpps (FBO) to have them add their JCP number to their FBO account. Companies must ensure that they are registered and login as a Vendor in FBO. When the Vendor click’s to open an export controlled package/document they should be asked for their

MPIN. After entering the MPIN, the export controlled package/document should be viewable/downloadable by

Vendors that have gone through the JCP registration and MPIN are valid and up-to-date. If problems persist, the

Vendor may call the FBO helpdesk at 866-606-8220, select option 2 for FBO issues and ask for troubleshooting assistance. You can check if your MPIN is valid and/or up-to-date at http://www.logisticsinformationservice.dla.mil/jcp/Search.aspx by either entering your Certification Number, Partial

Company Name and State, Cage Code or Partial Organization Name.

Q3. Proposal Inquiry: Missing Mechanical and Plumbing specification sections. Specification sections listed in the

TOC, but not provided are as follows: 220500 220513, 220523, 220529, 220700, 221116, 221316,224500, 230500, 230513, 230593, 230700, 231123, 232300, 233113, 233300, 233423, 235216, 237433, 238126.

Q3 ANSWER: The missing specification sections have been posted to FedBizOpps as Addendum 1. An amendment incorporating these sections as Addendum 1 has also been posted.

Q4. In reviewing the HVAC, division 23 specification sections, there appears to be a number of sections missing.

The following are not included in the package. 230500, 230513, 230593, 230700, 231123, 232300, 233113, 233300, 233423, 237433 and 238126.

Q4 ANSWER: The missing specification sections have been posted to FedBizOpps as Addendum 1. Amendment

1 has been posted incorporating these sections as Addendum 1 has also been posted.

Q5. There is an unsecured set of plumbing specifications on the site, are these to be used?

Q5 ANSWER: No, these specifications sections are not valid for use with this solicitation. The correct documents have been posted as Addendum 1 and an amendment incorporating these sections as Addendum 1 has also been posted.

Q6. There is a package labeled, “Responses to Questions as of 02July2013” that does not include other Q&A already posted. Is this a valid package?

Q6 ANSWER: The question and corrected answer has been incorporated into a Q&A 2_2July13 document. All valid Q&A will have consecutive numbers in the file naming convention along with the date. Always use the highest numbered and most recent dated/posted Q&A document.

Q7. Section 014000 3.4 C states the following: “In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: (electrical, mechanical, civil, structural, environmental, architectural, materials technician, and submittals mailto:jcp-admin@dla.mil http://www.logisticsinformationservice.dla.mil/jcp/Search.aspx clerk),. These individuals [must be directly employed by the prime Contractor and may not be employed by a supplier or subcontractor on this project] [may be employees of the prime or subcontractor]…”

Q7 ANSWER: Individuals may be employees of the prime or subcontractor.

Q8. Sheet C-112 references keynote 10 as “gravel mulch”. Please provide a detail for this item.

Q8 ANSWER: The gravel mulch consists of 2"(depth) of No 57 (3/4" dia +/-) crushed stone placed over finish grade. This material is further described under the header: Recommended Engineering Fills and their uses: Crushed

Stone shown on sheet C-501. To minimize the migration of the stone into the soil, the area graded area should be overlaid with a non-woven geotextile fabric such as TenCate Mirafi 160N or approved equal. If No 57 is not readily available or decomposed granite or other locally available material may be substituted.

Q9. Sheet C-120 provides estimate of quantities. These quantities seem to be substantially underestimated. The

UTES building pad alone will require 3,300 cyds of fill to get to subgrade. Please confirm if these quantities are to be used in any pricing.

Q9 ANSWER: The quantities shown on sheet C-120 are shown for convenience only. It is the responsibility of the

Contractor to verify all quantities and provide materials for the 100% complete and usable project. The quantities shown should not be used without verification and to the satisfaction of the contractor.

Q10. Sheet C-122 keynote 2 states “grade to match existing site conditions at perimeter of project”. The existing grades as shown do not provide enough information to carry the grading that far. Please provide existing grades at the North, Northeast, and Northwest sides of the site.

Q10 ANSWER: The original site survey limits have been shown on the documents. The site is surrounded on each side mentioned by a wide but gently sloping ditch. The survey coverage was in very close proximity to the proposed edge of pavement and/or fence line. The top of curb elevations in these areas were set near the existing elevation (0.50' +/-). This was done so that grading outside the back of curb could simply be accomplished as finish grading through the installation of topsoil within 5 feet of the back of curb and a manageable slope could be maintained.

As the northern portion of the site is proposed to be constructed of gravel paving. The northern line can be adjusted

(with the approval of the Contracting Officer) if a conflict with the existing grades develop during construction.

Q11. Please provide the limits of construction fence that will be required as specified in 015000 3.4. Will the entire site need to be enclosed where earth moving is taking place or just areas of building construction?

Q11 ANSWER: The limits of construction is delineated on Sheet C-100 and in more detail on sheets C-101 thru C-

103. The Specification "Temporary Facilities & Controls 015000 3.4 Security and Protection Facilities Installation

G) Site Enclosure Fence states:

Before construction operations begin, furnish and install site enclosure fence in a manner that will prevent people and animals from easily entering site except by entrance gates.

1) Extent of Fence: As required to enclose entire project site or portion determined sufficient to accommodate construction operations.

If the contractor prefers not to enclose the entire area as determined by the given limits of construction they may do so with the approval of the Contracting Officer (ie - just enclose the area where the construction of structures is occurring.) However, if an incident were to occur outside of the controlled perimeter were to occur the contractor would be still be responsible for injury or damages.

The contractor must provide access to the existing UTES building during construction.

Q12. Specification Section: 146300 “Double reeved” hoist is specified in section 2.2, Design Criteria, F, page

146300-3. Please confirm single reeved will not be acceptable.

Q12 ANSWER: Single reeve system is NOT acceptable.

Q13. Specification Section: 146300 CMAA Class D is specified on page 146300-3, section 2.2 Design Criteria, A.

CMAA Class D requires 10,000 hour bearing life but in section 2.3, A, 11, page 146300-5, bearing life of 5,000 hours is required. Which should be followed? (Class C is rated for 5,000 hours)

Q13 ANSWER: Class C is acceptable

Q14. Specification Section: 146300 Rotating axels and spherical roller bearings are a requirement for CMAA Class

D cranes and trolley hoists but under 2.3, A, 6, page 146300-5 “Each wheel shall be supported on precision ball bearings, mounted on stationary axels, suitable to withstand radial and thrust loads”. Should rotating axels or fixed axels be provided? Should precision ball bearings or spherical roller bearings be provided?

Q14 ANSWER: Provide fixed axels and spherical roller bearings.

Q15. Specification Section: 146300 1.1 Description of Work A, 1. “double girder top-running bridge crane with 2 speed rope hoist” is specified. Also- three speed points for bridge, trolley, and hoists are specified under 2.2 Design

Criteria, page 146300-3. If 3 speed points are required for each motion please confirm two speed motors are not acceptable.

Q15 ANSWER: Provide 2 speed system

Q16. Specification Section: 146300 Tapered tread bridge wheels are specified in 2.3, A, 6, page 146300-5, Crane wheels. Will flat tread bridge wheel be acceptable?

Q16 ANSWER: Flat tread wheels are acceptable if compatible with the steel girder.

Q17. Specification Section: 146300 Patented track runway beams are specified in 2.3, A, 7, page 146300-5. Since a top running crane is specified can this section be taken out?

Q17 ANSWER: Yes

Q18. Specification Section: 146300 H3 hoist is specified in 2.4, A, 8, page 146300-7. Should the hoist requirements meet CMAA Class D or is a H3 hoist acceptable?

Q18 ANSWER: H3 is acceptable

Q19. Specification Section: 146300 Mechanical load brake is specified in 2.4, A, 10, page 146300-7. Can a closed loop flux vector hoist motor with single motor brake be provided or is a mechanical load brake with motor brake preferred?

Q19 ANSWER: A closed loop flux vector hoist motor with single motor brake is acceptable.

Q20. Specification Section 213113, paragraph 3.6.A references specification section 213900, “Controllers

For Fire-Pump Drivers.” The specifications do not contain section 213900. This section is required to provide pricing. Please advise.

Q20 ANSWER: This was addressed in Addendum 3.

Q21. What reinforcing is required for the concrete hardstand C/C-501 and the POV parking Concrete Paving included in Optional Bid Item No. 7? The drawings do not indicate.

Q21ANSWER: Please refer to C-161 and C-502 for concrete reinforcing. Due to the concrete panels being relatively square in shape and the perimeter being “locked in place by doweling, the interior panels do not require additional reinforcement.

Q22. Drawing I-111B calls for the Main Corridor 103 to receive vinyl flooring (VF1 and VF2). The Room Finish

Schedule on I-601 calls for the Main Corridor 103 to receive LVT1 as the finish. Please clarify what LVT1 is.

Q22 ANSWER:

Q23. Will there e a site on-base to dispose of excess fill?

Q23 ANSWER: No, the contractor is responsible for legally removing and disposing of excess fill off site. Waste manifests are required upon completion.

Q24. Will any other site visits be allowed?

Q24 ANSWER: No, we do not anticipate having another site visit.

Q25. Will all of the reclaimed asphalt need to be hauled off site or can we use it along with the existing on-site millings being spread?

Q25 ANSWER: The reclaimed asphalt will be removed by the Government before the start of the project.

Q26. Is the controls system open spec, or is there a manufacturer in mind? I couldn’t find anything in the spec.

Q26 ANSWER: