Uninterrupted Power Supply (UPS) Maintenance Support Services
Closed Solicitation Posted
- Solicitation number
- W91151-24-Q-0030
- Agency
-
MICC Fort Hood
Mission and Installation Contracting Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
- Place of performance
- Fort Cavazos, Texas 76544, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood is seeking a contractor to provide Uninterrupted Power Supply (UPS) Maintenance Support Services. The key requirements include conducting initial, semi-annual, and annual preventive maintenance on UPS systems in four buildings, as well as providing 24/7 emergency response services with a 4-hour on-site response time. The contractor must be factory-trained and capable of servicing the specific UPS models installed in each building. Evaluation criteria will focus on the contractor's technical approach, past performance, and price. Questions are due by September 10, 2024, and proposals are due by September 13, 2024.
This is a small business set-aside acquisition under NAICS code 811310 - Commercial and Industrial Machinery and Equipment Repair and Maintenance. There is no incumbent contractor, and the government has not provided a budget range or award value estimate. The place of performance is Fort Cavazos, TX 76544, and the period of performance is from September 23, 2024, to September 22, 2025, with options for up to four additional years.
Notice text
2 versions
Update #2 · Latest ·
1. Description of Services:
a. Contractor shall conduct an initial PM, essential services, semi-annual service, and annual PM services for 4 buildings, as described below in this statement of work.
2. Initial and Essential Services:
a. Contractor shall provide essential services to include guaranteed 4-hour on-site emergency response, 7 days/week, 24 hours/day.
b. Contractor shall include POC’s and detail instructions for requesting emergency services.
c. REMOVED
d. REMOVED
e. Contractor shall perform an initial PM visit; during the initial visit an Annual Service PM shall be performed.
f. REMOVED
g. Contractor shall refurbish cell connections as deemed necessary by the detailed inspection report.
h. Contractor shall provide a detailed written report noting any deficiencies and corrective actions needed, taken and/or planned following both normal service and emergency response.
i. Contractor must return unit to operational service with normal load then measure and verify display indications following both normal service and emergency response.
3. Semi-Annual Service
a. Contractor shall inspect the appearance and cleanliness of the battery and the battery room. Clean normal jar top dirt accumulation (to be done only with battery offline).
b. Contractor shall measure and record the total battery float voltage and charging current.
c. Contractor shall measure and record the overall AC ripple voltage.
d. Contractor shall measure and record the overall AC ripple current.
e. Contractor shall visually inspect the jars and covers for cracks and leakage.
f. Contractor shall visually inspect for evidence of corrosion.
g. Contractor shall measure and record the ambient temperature.
h. Contractor shall verify the integrity of the battery rack/cabinet.
i. Contractor shall measure and record 100% of the jar temperatures.
j. Contractor shall measure and record the float voltage of all jars.
k. Contractor shall measure and record all internal ohmic readings.
l. Contractor shall refurbish cell connections as deemed necessary by the detailed
inspection report.
m. Contractor shall provide a detailed written report noting any deficiencies and corrective
action needed, taken and/or planned.
4. Annual Service Includes All the Above, Plus
a. Contractor shall perform original equipment manufacturer (OEM) maintenance/service to
include checking capacitors, fans, and firmware updates if necessary.
b. Contractor shall re-tighten all battery connections to the battery manufacturer's
specifications, if required. Refer to the manufacturer’s literature to determine if retightening
is required.
c. Contractor shall measure and record all battery connection resistances in micro-ohms,
when applicable.
Update #1 ·
1. Description of Services:
a. Contractor shall conduct an initial PM, essential services, semi-annual service, and annual PM services for 4 buildings, as described below in this statement of work.
2. Initial and Essential Services:
a. Contractor shall provide essential services to include guaranteed 4-hour on-site emergency response, 7 days/week, 24 hours/day.
b. Contractor shall include POC’s and detail instructions for requesting emergency services.
c. Contractor shall include 100% corrective labor and travel coverage 7 days/week, 24 hours/day. Does not include labor for full-string replacement.
d. Contractor shall include battery recycling as required, with documentation meeting EPA requirements.
Contractor shall be factory trained Battery Specialist or Customer Engineers and able to service the UPS (Liebert, VERTIV, or EATON) in each of the buildings. See descriptions of Equipment to be serviced below.
e. Contractor shall perform an initial PM visit; during the initial visit an Annual Service PM shall be performed.
f. Contractor shall conduct required single jar replacement service for lead acid batteries to include freight, labor, and disposal of batteries. Single jar replacement service is necessary the battery string is not in overall good health and the battery string is beyond expected service years or has had excessive single jar replacements that would make the string unstable.
g. Contractor shall refurbish cell connections as deemed necessary by the detailed inspection report.
h. Contractor shall provide a detailed written report noting any deficiencies and corrective actions needed, taken and/or planned following both normal service and emergency response.
i. Contractor must return unit to operational service with normal load then measure and verify display indications following both normal service and emergency response.
3. Semi-Annual Service
a. Contractor shall inspect the appearance and cleanliness of the battery and the battery room. Clean normal jar top dirt accumulation (to be done only with battery offline).
b. Contractor shall measure and record the total battery float voltage and charging current.
c. Contractor shall measure and record the overall AC ripple voltage.
d. Contractor shall measure and record the overall AC ripple current.
e. Contractor shall visually inspect the jars and covers for cracks and leakage.
f. Contractor shall visually inspect for evidence of corrosion.
g. Contractor shall measure and record the ambient temperature.
h. Contractor shall verify the integrity of the battery rack/cabinet.
i. Contractor shall measure and record 100% of the jar temperatures.
j. Contractor shall measure and record the float voltage of all jars.
k. Contractor shall measure and record all internal ohmic readings.
l. Contractor shall refurbish cell connections as deemed necessary by the detailed
inspection report.
m. Contractor shall provide a detailed written report noting any deficiencies and corrective
action needed, taken and/or planned.
4. Annual Service Includes All the Above, Plus
a. Contractor shall perform original equipment manufacturer (OEM) maintenance/service to
include checking capacitors, fans, and firmware updates if necessary.
b. Contractor shall re-tighten all battery connections to the battery manufacturer's
specifications, if required. Refer to the manufacturer’s literature to determine if retightening
is required.
c. Contractor shall measure and record all battery connection resistances in micro-ohms,
when applicable.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| J061--Uninterruptible Power Supply St. Louis VA Medical Center | Veterans Integrated Service Network 15 | No set-aside | |
| FTG247 Replace UPS at IDT1, Fort Greely, Alaska | ENDIST Alaska | Total Small Business | |
| 6973GH-26-r-00177 - miniature UPS kits – SIR | Franchise Acquisition Servies | No set-aside | |
| Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX | ENDIST Louisville | Total Small Business | |
| UPS, nova 1. 25 KVA | Naval Supply Systems Command | No set-aside |