TX FTNP BIBE 14(2) 13(5) 11(3) Chisos Basin, West, North Entrance Roads
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 6982AF20B000028
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Big Bend National Park Tx Usa
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks construction services for road rehabilitation work on approximately 2.3 miles of roadways within Big Bend National Park in Texas. The Federal Highway Administration within the Department of Transportation is seeking to rehabilitate sections of the Chisos Basin Road and West and North Entrance Roads, including pulverizing existing asphalt, installing concrete curb and drainage improvements, and repaving with new asphalt. Bids are due on August 27, 2020 and award is anticipated for September 2020. Construction must be completed between October 2020 and February 2021 for an estimated total cost ranging from $6.5 million to $9 million.
There is no set-aside designation for this procurement. The primary NAICS code is 237110 and PSC code is R499. Two bids were received by the deadline, with AJ Commercial Services, Inc. submitting the lowest bid of $13,403,930.45. Performance will take place on the roadways within Big Bend National Park in Texas. The place of performance is listed as Big Bend National Park, Texas 79834.
Notice text
THIS PROJECT IS ADVERTISED ON A FULL AND OPEN BASIS.
THIS IS A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE AVAILABLE.
PROJECT NUMBER: TX FTNP BIBE 14(2) 13(5) 11(3)
PROJECT NAME: Chisos Basin, West, North Entrance Roads
PROJECT DESCRIPTION: Work on approximately 2.3 miles of the Chisos Basin Road, from the West Entrance Road to the Campground intersection. Work includes road rehabilitation on its current alignment and at its current width. The rehabilitation would consist of pulverizing the existing asphalt for additional base, concrete curb, drainage improvements, and repaving with approximately 4” of asphalt.
The first section of repair work on the West Entrance Road would begin at the Park boundary and continue for approximately 1.1 miles. Repair of this section would include approximately sub excavation, replacement of the subgrade, concrete paving, and base and repaving. The remaining road length would be pulverized, shaped and paved. The second section being reconstructed 700 to 500 feet in length construction will include sub excavation, subgrade work, base, asphalt and concrete paving.
COST RANGE: Estimated total cost for Schedule A, Option X, and Option Y is $6,500,000 to $9,000,000.
CONSTRUCTION DURATION: October, 2020 through February, 2021
ADDITIONAL INFORMATION:
Anticipated Advertisement: July, 2020
Anticipated Bid Opening: August, 2020
Anticipated Award: September, 2020
Files
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| TX FTNP BIBE 14(2) 13(5) 11(3) Chisos Basin, West, North Entrance Roads | Award Notice | |
| This notice | Solicitation | |
| TX FTNP BIBE 14(2) 13(5) 11(3) Chisos Basin, West, North Entrance Roads | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| TX-balcones canyonlands NWR prkng lot | — | Total Small Business | |
| Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY25(2) | Federal Highway Administration | Total Small Business | |
| OK FW TSM 10(1) NFH Entrance Road and Parking Improvements | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity