TX ERFO 215(1) Stubblefield Lake Road Bridge Replacement
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 6982AF20B000014
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- New Waverly TX 77358 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks construction services for the replacement of the TX ERFO 215(1) Stubblefield Lake Road Bridge in Walker County, Texas. The Department of Transportation Federal Highway Administration seeks to award a firm fixed-price contract to replace the existing bridge damaged by Hurricane Harvey with driven piles, pre-cast concrete box beams, structural concrete, reinforcing steel, and bridge railing. Bids were due by June 4, 2020 and contract award is anticipated in June 2020, with construction to occur between June 2020 and January 2021. Evaluation will be based on technical qualifications and price.
There is no set-aside designation. The project involves replacing approximately 1,600 linear feet of driven H-pile, 500 square yards of sheet pile, 2,300 linear feet of pre-cast concrete box beams, 500 cubic yards of structural concrete, and 96,000 pounds of reinforcing steel, with an estimated budget between $2-4 million. The low bid was $3,397,542.50. Place of performance is in New Waverly, Texas. The soliciting agency is the Department of Transportation Federal Highway Administration.
Notice text
PROJECT DETAILS: TX ERFO 215(1) Stubblefield Lake Road
The TX ERFO 215(1) project is located in Walker County, TX within the Sam Houston National Forest. This project will replace an existing bridge damaged by Hurricane Harvey in August 2017. The major work elements include driven piles, pre-cast concrete box beams, structural concrete, reinforcing steel, bridge railing, and asphalt placement.
The proposed project is estimated at a cost of between $2,000,000 and $4,000,000.
Contract award is anticipated by June, 2020. Construction is anticipated between June 2020 and January, 2021.
Significant Quantities and Line Items:
Line Item - Unit - Estimated Quantity
Driven H-pile - LNFT - 1,600
Sheet Pile - SQYD - 500
Pre-cast Box Beams - LNFT - 2,300
Structural Concrete - CUYD - 500
Reinforcing Steel - LB - 96,000
Please see the Invitation for Bid (IFB) in the Attachments/Links section of this notice.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| TX ERFO 215(1) Stubblefield Lake Road Bridge Replacement | Award Notice | |
| This notice | Solicitation | |
| TX ERFO 215(1) Stubblefield Lake Road | Pre-Solicitation | |
| TX ERFO 215(1) Stubblefield Lake Road | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity