TX ERFO 215(1) Stubblefield Lake Road
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 6982AF20B000014
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Not on record
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- New Waverly TX 77358 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for the replacement of an existing bridge damaged by Hurricane Harvey in August 2017. The project, known as TX ERFO 215(1) Stubblefield Lake Road, is located in Walker County, Texas within the Sam Houston National Forest. The Department of Transportation Federal Highway Administration seeks to award a contract to replace the bridge through major work elements including driven piles, pre-cast concrete box beams, structural concrete, reinforcing steel, and bridge railing. The agency will evaluate proposals based on cost and the ability to complete the project between June 2020 and January 2021. Questions are due by April 30, 2020 and the agency intends to award the contract by June 2020.
There is no set-aside designation for this procurement. Significant line items for the bridge replacement include an estimated 1,600 linear feet of driven H-pile, 500 square yards of sheet pile, 2,300 linear feet of pre-cast box beams, 500 cubic yards of structural concrete, and 96,000 pounds of reinforcing steel. The project is estimated to cost between $2,000,000 and $4,000,000.
Notice text
PROJECT DETAILS: TX ERFO 215(1) Stubblefield Lake Road
The TX ERFO 215(1) project is located in Walker County, TX within the Sam Houston National Forest. This project will
replace an existing bridge damaged by Hurricane Harvey in August 2017.
The major work elements include driven piles, pre-cast concrete box beams, structural concrete, reinforcing steel,
bridge railing, and asphalt placement.
The proposed project is estimated at a cost of between $2,000,000 and $4,000,000.
Contract award is anticipated by June, 2020. Construction is anticipated between June 2020 and January, 2021.
Significant Quantities and Line Items:
Line Item - Unit - Estimated Quantity
Driven H-pile - LNFT - 1,600
Sheet Pile - SQYD - 500
Pre-cast Box Beams - LNFT - 2,300
Structural Concrete - CUYD - 500
Reinforcing Steel - LB - 96,000
Notice history
| Notice | Type | Posted |
|---|---|---|
| TX ERFO 215(1) Stubblefield Lake Road Bridge Replacement | Award Notice | |
| TX ERFO 215(1) Stubblefield Lake Road Bridge Replacement | Solicitation | |
| This notice | Pre-Solicitation | |
| TX ERFO 215(1) Stubblefield Lake Road | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Humbolt pacific crest trail bridge replacement | Forest Service | No set-aside | |
| Purchase of 2 or 3 Temporary Road Bridges | Forest Service | No set-aside | |
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| TX FW LGA 10(5) Steve Thompson Wildlife Drive | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity