Q_A Stubblefield Lake Road Bridge Replacement.pdf

PDF 68 KB Posted

Attached to
TX ERFO 215(1) Stubblefield Lake Road Bridge Replacement
Solicitation number
6982AF20B000014
Issued by

About this file

This document provides details for a federal contract solicitation to replace a bridge damaged by Hurricane Harvey in Walker County, Texas. The solicitation was issued by the Department of Transportation Federal Highway Administration seeking bids to replace the TX ERFO 215(1) Stubblefield Lake Road Bridge. Major work elements include driven piles, pre-cast concrete box beams, structural concrete, reinforcing steel, and bridge railing. Significant line items include 1,600 linear feet of driven H-pile, 500 square yards of sheet pile, 2,300 linear feet of pre-cast box beams, 500 cubic yards of structural concrete, and 96,000 pounds of reinforcing steel. Bids for the project are due by June 4, 2020 at 2:00 PM MST. The contract is estimated to be awarded in June 2020 with construction occurring between June 2020 and January 2021.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A Stubblefield Lake Road Bridge Replacement

1.) Will US DOT be requiring pre-qualifications for this project? If so, when is the due date?

All requirements for bidding are specified in the solicitation. Bids are due June 4, 2020 by 2pm MST. There is no requirement for pre-qualifications to be submitted.