This document contains a bid tabulation report and related federal contract opportunity notice for the TX ERFO 215(1) Stubblefield Lake Road Bridge Replacement project. The bid tabulation report details bids received from three contractors for construction work including driven piles, pre-cast concrete box beams, structural concrete, reinforcing steel, and asphalt placement to replace a bridge damaged by Hurricane Harvey. The low bid was $3,397,542.50 from JCF Bridge & Concrete. The federal contract opportunity notice provides additional details on the project location in Walker County, Texas within Sam Houston National Forest, the estimated $2-4 million budget, and anticipated June 2020 contract award and construction period from June 2020 to January 2021. Significant line items include over 1,600 linear feet of driven H-pile, 500 square yards of sheet pile, 2,300 linear feet of pre-cast box beams, 500 cubic yards of structural concrete, and 96,000 pounds of reinforcing steel.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 06/08/20

1 out of 11Source Selection Information - See FAR 2.101 & 3.104

Project No: TX ERFO SAM HOUSTON 215(1)

Project Name: Stubblefield Road

Schedule: A

Schedule Type: Base

Solcitation No:

Division: Central Federal Lands

State: TX County: Walker

Federal Land: Sam Houston National Forest Opened at: Lakewood, CO

Opened by: Josephine Helms

Date: 06/04/20

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

JCF Bridge & Concrete $3,397,542.50 1300B Gatlin Ck Rd Driftwood, TX 78619

Jay-Reese Contractors, Inc. $3,720,155.00 32780 Ranch Road 12 Dripping Springs, TX 78620

Stronghold Engineering, Inc. $3,864,303.68 150 W. Walnut Avenue Perris, CA 92571

Engineer's Estimate $3,270,000.00

2 out of 11Source Selection Information - See FAR 2.101 & 3.104

Project No: TX ERFO SAM HOUSTON 215(1)

Project Name: Stubblefield Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0010 15101-0000 MOBILIZATION

JCF Bridge & Concrete Lump Sum $350,000.00 Jay-Reese Contractors, Inc. Lump Sum $365,000.00 Stronghold Engineering, Inc. Lump Sum $416,360.39 Engineer's Estimate ALL LPSM Lump Sum $359,732.80

A0020 15201-0000 CONSTRUCTION SURVEY AND STAKING

JCF Bridge & Concrete Lump Sum $18,000.00 Jay-Reese Contractors, Inc. Lump Sum $25,000.00 Stronghold Engineering, Inc. Lump Sum $28,009.75 Engineer's Estimate ALL LPSM Lump Sum $12,000.00

A0030 15214-1000 SURVEY AND STAKING, BRIDGE

JCF Bridge & Concrete Lump Sum $18,000.00 Jay-Reese Contractors, Inc. Lump Sum $28,000.00 Stronghold Engineering, Inc. Lump Sum $19,097.55 Engineer's Estimate ALL LPSM Lump Sum $13,500.00

A0040 15214-2000 SURVEY AND STAKING, RETAINING WALL (SHEET PILE)

JCF Bridge & Concrete Lump Sum $18,000.00 Jay-Reese Contractors, Inc. Lump Sum $10,000.00 Stronghold Engineering, Inc. Lump Sum $7,639.03 Engineer's Estimate ALL LPSM Lump Sum $5,000.00

A0050 15301-0000 CONTRACTOR QUALITY CONTROL

JCF Bridge & Concrete Lump Sum $95,000.00 Jay-Reese Contractors, Inc. Lump Sum $75,000.00 Stronghold Engineering, Inc. Lump Sum $132,342.95 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

A0060 15401-0000 CONTRACTOR TESTING

JCF Bridge & Concrete Lump Sum $55,000.00 Jay-Reese Contractors, Inc. Lump Sum $30,000.00 Stronghold Engineering, Inc. Lump Sum $86,575.58 Engineer's Estimate ALL LPSM Lump Sum $80,000.00

3 out of 11Source Selection Information - See FAR 2.101 & 3.104

Project No: TX ERFO SAM HOUSTON 215(1)

Project Name: Stubblefield Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0070 15501-0000 CONSTRUCTION SCHEDULE

JCF Bridge & Concrete Lump Sum $5,000.00 Jay-Reese Contractors, Inc. Lump Sum $10,000.00 Stronghold Engineering, Inc. Lump Sum $12,731.70 Engineer's Estimate ALL LPSM Lump Sum $30,000.00

A0080 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

JCF Bridge & Concrete $14.00 $21,000.00 Jay-Reese Contractors, Inc. $12.00 $18,000.00 Stronghold Engineering, Inc. $2.86 $4,290.00 Engineer's Estimate 1,500 LNFT $5.00 $7,500.00

A0090 20101-0000 CLEARING AND GRUBBING

JCF Bridge & Concrete $15,000.00 $15,000.00 Jay-Reese Contractors, Inc. $12,000.00 $12,000.00 Stronghold Engineering, Inc. $17,756.13 $17,756.13 Engineer's Estimate 1.00 ACRE $5,000.00 $5,000.00

A0100 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS

JCF Bridge & Concrete Lump Sum $45,000.00 Jay-Reese Contractors, Inc. Lump Sum $20,000.00 Stronghold Engineering, Inc. Lump Sum $41,087.23 Engineer's Estimate ALL LPSM Lump Sum $10,000.00

A0110 20304-2000 REMOVAL OF BRIDGE

JCF Bridge & Concrete Lump Sum $100,000.00 Jay-Reese Contractors, Inc. Lump Sum $185,000.00 Stronghold Engineering, Inc. Lump Sum $225,052.06 Engineer's Estimate ALL LPSM Lump Sum $100,000.00

A0120 20420-0000 EMBANKMENT CONSTRUCTION

JCF Bridge & Concrete $85.00 $57,800.00 Jay-Reese Contractors, Inc. $75.00 $51,000.00 Stronghold Engineering, Inc. $46.85 $31,858.00 Engineer's Estimate 680 CUYD $40.00 $27,200.00

4 out of 11Source Selection Information - See FAR 2.101 & 3.104

Project No: TX ERFO SAM HOUSTON 215(1)

Project Name: Stubblefield Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0130 20801-0000 STRUCTURE EXCAVATION

JCF Bridge & Concrete $38.00 $3,040.00 Jay-Reese Contractors, Inc. $55.00 $4,400.00 Stronghold Engineering, Inc. $35.32 $2,825.60 Engineer's Estimate 80 CUYD $55.00 $4,400.00

A0140 20803-0000 STRUCTURAL BACKFILL

JCF Bridge & Concrete $85.00 $3,400.00 Jay-Reese Contractors, Inc. $65.00 $2,600.00 Stronghold Engineering, Inc. $169.04 $6,761.60 Engineer's Estimate 40 CUYD $100.00 $4,000.00

A0150 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3

JCF Bridge & Concrete $165.00 $14,850.00 Jay-Reese Contractors, Inc. $200.00 $18,000.00 Stronghold Engineering, Inc. $289.47 $26,052.30 Engineer's Estimate 90 CUYD $160.00 $14,400.00

A0160 25101-2600 PLACED RIPRAP, METHOD B, CLASS 6

JCF Bridge & Concrete $180.00 $187,200.00 Jay-Reese Contractors, Inc. $225.00 $234,000.00 Stronghold Engineering, Inc. $183.28 $190,611.20 Engineer's Estimate 1,040 CUYD $180.00 $187,200.00

A0170 25125-0000 BOULDER

JCF Bridge & Concrete $600.00 $3,600.00 Jay-Reese Contractors, Inc. $500.00 $3,000.00 Stronghold Engineering, Inc. $2,641.13 $15,846.78 Engineer's Estimate 6 EACH $220.00 $1,320.00

A0180 30202-2000 ROADWAY AGGREGATE, METHOD 2

JCF Bridge & Concrete $80.00 $105,600.00 Jay-Reese Contractors, Inc. $80.00 $105,600.00 Stronghold Engineering, Inc. $55.63 $73,431.60 Engineer's Estimate 1,320 TON $50.00 $66,000.00

5 out of 11Source Selection Information - See FAR 2.101 & 3.104

Project No: TX ERFO SAM HOUSTON 215(1)

Project Name: Stubblefield Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0190 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

JCF Bridge & Concrete $140.00 $74,200.00 Jay-Reese Contractors, Inc. $150.00 $79,500.00 Stronghold Engineering, Inc. $190.97 $101,214.10 Engineer's Estimate 530 TON $150.00 $79,500.00

A0200 40601-0000 FOG SEAL

JCF Bridge & Concrete $1,500.00 $750.00 Jay-Reese Contractors, Inc. $8,500.00 $4,250.00 Stronghold Engineering, Inc. $3,819.51 $1,909.76 Engineer's Estimate 0.50 TON $1,000.00 $500.00

A0210 41102-1000 PRIME COAT, METHOD 1

JCF Bridge & Concrete $7.25 $16,675.00 Jay-Reese Contractors, Inc. $2.25 $5,175.00 Stronghold Engineering, Inc. $2.67 $6,141.00 Engineer's Estimate 2,300 SQYD $1.00 $2,300.00

A0220 41201-0000 TACK COAT

JCF Bridge & Concrete $2,000.00 $1,000.00 Jay-Reese Contractors, Inc. $8,000.00 $4,000.00 Stronghold Engineering, Inc. $7,639.02 $3,819.51 Engineer's Estimate 0.50 TON $1,300.00 $650.00

A0230 50101-2600 MINOR CONCRETE PAVEMENT, PLAIN, 6-INCH DEPTH

JCF Bridge & Concrete $190.00 $58,900.00 Jay-Reese Contractors, Inc. $150.00 $46,500.00 Stronghold Engineering, Inc. $224.98 $69,743.80 Engineer's Estimate 310 SQYD $120.00 $37,200.00

A0240 55101-1600 STEEL H-PILE, 12 X 74, IN PLACE

JCF Bridge & Concrete $220.00 $152,460.00 Jay-Reese Contractors, Inc. $60.00 $41,580.00 Stronghold Engineering, Inc. $101.52 $70,353.36 Engineer's Estimate 693 LNFT $100.00 $69,300.00

6 out of 11Source Selection Information - See FAR 2.101 & 3.104

Project No: TX ERFO SAM HOUSTON 215(1)

Project Name: Stubblefield Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0250 55101-1900 STEEL H-PILE, 14 X 89, IN PLACE

JCF Bridge & Concrete $250.00 $175,750.00 Jay-Reese Contractors, Inc. $85.00 $59,755.00 Stronghold Engineering, Inc. $148.82 $104,620.46 Engineer's Estimate 703 LNFT $140.00 $98,420.00

A0260 55103-1000 SHEET PILE, IN PLACE

JCF Bridge & Concrete $175.00 $180,425.00 Jay-Reese Contractors, Inc. $300.00 $309,300.00 Stronghold Engineering, Inc. $268.94 $277,277.14 Engineer's Estimate 1,031 SQYD $500.00 $515,500.00

A0270 55104-1000 DYNAMIC PILE LOAD TEST

JCF Bridge & Concrete $4,500.00 $18,000.00 Jay-Reese Contractors, Inc. $5,000.00 $20,000.00 Stronghold Engineering, Inc. $6,887.09 $27,548.36 Engineer's Estimate 4 EACH $5,000.00 $20,000.00

A0280 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

JCF Bridge & Concrete $1,050.00 $477,750.00 Jay-Reese Contractors, Inc. $1,100.00 $500,500.00 Stronghold Engineering, Inc. $952.04 $433,178.20 Engineer's Estimate 455 CUYD $800.00 $364,000.00

A0290 55235-0000 EXPANSION JOINTS

JCF Bridge & Concrete $135.00 $7,020.00 Jay-Reese Contractors, Inc. $120.00 $6,240.00 Stronghold Engineering, Inc. $280.09 $14,564.68 Engineer's Estimate 52 LNFT $260.00 $13,520.00

A0300 55302-3400 PRECAST, PRESTRESSED CONCRETE BOX BEAM (TXDOT B-20)

JCF Bridge & Concrete $280.00 $614,320.00 Jay-Reese Contractors, Inc. $350.00 $767,900.00 Stronghold Engineering, Inc. $294.83 $646,857.02 Engineer's Estimate 2,194 LNFT $275.00 $603,350.00

7 out of 11Source Selection Information - See FAR 2.101 & 3.104

Project No: TX ERFO SAM HOUSTON 215(1)

Project Name: Stubblefield Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0310 55401-2000 REINFORCING STEEL, EPOXY COATED

JCF Bridge & Concrete $1.25 $91,552.50 Jay-Reese Contractors, Inc. $2.50 $183,105.00 Stronghold Engineering, Inc. $3.05 $223,388.10 Engineer's Estimate 73,242 LB $1.60 $117,187.20

A0320 55601-0500 BRIDGE RAILING, CONCRETE

JCF Bridge & Concrete $185.00 $79,550.00 Jay-Reese Contractors, Inc. $350.00 $150,500.00 Stronghold Engineering, Inc. $358.80 $154,284.00 Engineer's Estimate 430 LNFT $225.00 $96,750.00

A0330 60201-1400 60-INCH PIPE CULVERT (METAL)

JCF Bridge & Concrete $380.00 $3,800.00 Jay-Reese Contractors, Inc. $350.00 $3,500.00 Stronghold Engineering, Inc. $191.96 $1,919.60 Engineer's Estimate 10 LNFT $250.00 $2,500.00

A0340 60210-1400 END SECTION FOR 60-INCH PIPE CULVERT

JCF Bridge & Concrete $4,000.00 $4,000.00 Jay-Reese Contractors, Inc. $2,500.00 $2,500.00 Stronghold Engineering, Inc. $3,469.93 $3,469.93 Engineer's Estimate 1 EACH $2,200.00 $2,200.00

A0350 60915-1000 WHEELSTOP, CONCRETE

JCF Bridge & Concrete $350.00 $700.00 Jay-Reese Contractors, Inc. $125.00 $250.00 Stronghold Engineering, Inc. $159.15 $318.30 Engineer's Estimate 2 EACH $185.00 $370.00

A0360 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS

JCF Bridge & Concrete $118.00 $17,700.00 Jay-Reese Contractors, Inc. $65.00 $9,750.00 Stronghold Engineering, Inc. $223.82 $33,573.00 Engineer's Estimate 150 LNFT $45.00 $6,750.00

8 out of 11Source Selection Information - See FAR 2.101 & 3.104

Project No: TX ERFO SAM HOUSTON 215(1)

Project Name: Stubblefield Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0370 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT

JCF Bridge & Concrete $6,500.00 $26,000.00 Jay-Reese Contractors, Inc. $4,000.00 $16,000.00 Stronghold Engineering, Inc. $3,804.19 $15,216.76 Engineer's Estimate 4 EACH $3,700.00 $14,800.00

A0380 61707-4000 STRUCTURE TRANSITION RAILING, MGS SYSTEM

JCF Bridge & Concrete $375.00 $15,000.00 Jay-Reese Contractors, Inc. $200.00 $8,000.00 Stronghold Engineering, Inc. $159.15 $6,366.00 Engineer's Estimate 40 LNFT $175.00 $7,000.00

A0390 61904-0000 BOLLARD POST

JCF Bridge & Concrete $350.00 $2,800.00 Jay-Reese Contractors, Inc. $750.00 $6,000.00 Stronghold Engineering, Inc. $1,527.81 $12,222.48 Engineer's Estimate 8 EACH $550.00 $4,400.00

A0400 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

JCF Bridge & Concrete $105.00 $4,200.00 Jay-Reese Contractors, Inc. $85.00 $3,400.00 Stronghold Engineering, Inc. $127.32 $5,092.80 Engineer's Estimate 40 HOUR $115.00 $4,600.00

A0410 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY

JCF Bridge & Concrete $105.00 $4,200.00 Jay-Reese Contractors, Inc. $125.00 $5,000.00 Stronghold Engineering, Inc. $95.49 $3,819.60 Engineer's Estimate 40 HOUR $110.00 $4,400.00

A0420 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY

JCF Bridge & Concrete $125.00 $5,000.00 Jay-Reese Contractors, Inc. $175.00 $7,000.00 Stronghold Engineering, Inc. $108.22 $4,328.80 Engineer's Estimate 40 HOUR $155.00 $6,200.00

9 out of 11Source Selection Information - See FAR 2.101 & 3.104

Project No: TX ERFO SAM HOUSTON 215(1)

Project Name: Stubblefield Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0430 62301-0000 GENERAL LABOR

JCF Bridge & Concrete $50.00 $3,000.00 Jay-Reese Contractors, Inc. $45.00 $2,700.00 Stronghold Engineering, Inc. $63.65 $3,819.00 Engineer's Estimate 60 HOUR $50.00 $3,000.00

A0440 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

JCF Bridge & Concrete $115.00 $1,150.00 Jay-Reese Contractors, Inc. $150.00 $1,500.00 Stronghold Engineering, Inc. $318.29 $3,182.90 Engineer's Estimate 10 HOUR $150.00 $1,500.00

A0450 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

JCF Bridge & Concrete $125.00 $1,250.00 Jay-Reese Contractors, Inc. $175.00 $1,750.00 Stronghold Engineering, Inc. $2,228.10 $22,281.00 Engineer's Estimate 10 HOUR $200.00 $2,000.00

A0460 62510-2000 SEEDING, HYDRAULIC METHOD

JCF Bridge & Concrete $5,000.00 $1,000.00 Jay-Reese Contractors, Inc. $2,500.00 $500.00 Stronghold Engineering, Inc. $15,278.04 $3,055.61 Engineer's Estimate 0.20 ACRE $2,500.00 $500.00

A0470 62515-2000 MULCHING, HYDRAULIC METHOD

JCF Bridge & Concrete $5,000.00 $1,000.00 Jay-Reese Contractors, Inc. $8,500.00 $1,700.00 Stronghold Engineering, Inc. $15,278.04 $3,055.61 Engineer's Estimate 0.20 ACRE $3,000.00 $600.00

A0480 63301-0000 SIGN SYSTEM

JCF Bridge & Concrete $500.00 $4,500.00 Jay-Reese Contractors, Inc. $475.00 $4,275.00 Stronghold Engineering, Inc. $1,319.18 $11,872.62 Engineer's Estimate 9 EACH $500.00 $4,500.00

10 out of 11Source Selection Information - See FAR 2.101 & 3.104

Project No: TX ERFO SAM HOUSTON 215(1)

Project Name: Stubblefield Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0490 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE)

JCF Bridge & Concrete $0.50 $2,250.00 Jay-Reese Contractors, Inc. $0.75 $3,375.00 Stronghold Engineering, Inc. $0.64 $2,880.00 Engineer's Estimate 4,500 LNFT $1.50 $6,750.00

A0500 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)

JCF Bridge & Concrete $0.50 $1,500.00 Jay-Reese Contractors, Inc. $0.65 $1,950.00 Stronghold Engineering, Inc. $0.70 $2,100.00 Engineer's Estimate 3,000 LNFT $1.50 $4,500.00

A0510 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL

JCF Bridge & Concrete $425.00 $1,700.00 Jay-Reese Contractors, Inc. $250.00 $1,000.00 Stronghold Engineering, Inc. $318.29 $1,273.16 Engineer's Estimate 4 EACH $500.00 $2,000.00

A0520 63501-0000 TEMPORARY TRAFFIC CONTROL

JCF Bridge & Concrete Lump Sum $15,000.00 Jay-Reese Contractors, Inc. Lump Sum $7,000.00 Stronghold Engineering, Inc. Lump Sum $30,810.72 Engineer's Estimate ALL LPSM Lump Sum $5,000.00

A0530 63641-0400 RELOCATE POLE

JCF Bridge & Concrete $2,500.00 $2,500.00 Jay-Reese Contractors, Inc. $8,500.00 $8,500.00 Stronghold Engineering, Inc. $11,439.10 $11,439.10 Engineer's Estimate 1 EACH $20,000.00 $20,000.00

A0540 63701-0000 FIELD OFFICE

JCF Bridge & Concrete $15,000.00 $15,000.00 Jay-Reese Contractors, Inc. $25,000.00 $25,000.00 Stronghold Engineering, Inc. $56,019.49 $56,019.49 Engineer's Estimate 1 EACH $20,000.00 $20,000.00

11 out of 11Source Selection Information - See FAR 2.101 & 3.104

Project No: TX ERFO SAM HOUSTON 215(1)

Project Name: Stubblefield Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0550 64604-3000 FIXTURE, PEDESTRIAN RAILING (ALONG SHEET PILE WALL)

JCF Bridge & Concrete $215.00 $43,000.00 Jay-Reese Contractors, Inc. $135.00 $27,000.00 Stronghold Engineering, Inc. $219.66 $43,932.00 Engineer's Estimate 200 LNFT $175.00 $35,000.00

A0560 64604-3000 FIXTURE, PEDESTRIAN RAILING

JCF Bridge & Concrete $215.00 $92,450.00 Jay-Reese Contractors, Inc. $320.00 $137,600.00 Stronghold Engineering, Inc. $219.66 $94,453.80 Engineer's Estimate 430 LNFT $200.00 $86,000.00

A0570 64605-3000 FIXTURE, BOAT RAMP

JCF Bridge & Concrete Lump Sum $65,000.00 Jay-Reese Contractors, Inc. Lump Sum $60,000.00 Stronghold Engineering, Inc. Lump Sum $14,572.47 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

Total Schedule - All Items

JCF Bridge & Concrete $3,397,542.50 Jay-Reese Contractors, Inc. $3,720,155.00 Stronghold Engineering, Inc. $3,864,303.68 Engineer's Estimate $3,270,000.00