This document contains details of a federal contract opportunity for a bridge replacement project in Walker County, Texas. The TX ERFO 215(1) Stubblefield Lake Road Bridge Replacement project, issued by the Department of Transportation Federal Highway Administration, will replace an existing bridge damaged by Hurricane Harvey in 2017. Major work elements include driven piles, pre-cast concrete box beams, structural concrete, reinforcing steel, and asphalt placement. The project cost is estimated between $2,000,000 to $4,000,000, with contract award anticipated by June 2020 and construction from June 2020 to January 2021. Significant line items and quantities include 1,600 linear feet of driven H-pile, 500 square yards of sheet pile, 2,300 linear feet of pre-cast box beams, 500 cubic yards of structural concrete, and 96,000 pounds of reinforcing steel.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Can we substitute TX DOT asphalt mix with US DOT asphalt mix designs?
We will accept any certified mix that meets 403 Type I requirements. That would usually be a State DOT mix. We do not require a special Federal mix as per Section 401 or 402.