Bid Opening Summary - TX ERFO - for GPE.doc
DOC document 35 KB Posted
- Solicitation number
- 6982AF20B000014
About this file
This document contains a bid opening summary and related federal contract opportunity notice for the TX ERFO 215(1) Stubblefield Lake Road Bridge Replacement project. The bid opening summary shows that four contractors submitted bids by the June 4, 2020 deadline, with bids ranging from $3,397,542.50 to $3,846,160.54. Jay-Reese Contractors, Inc. provided the lowest bid of $3,720,155.00. The engineer's estimate for the project was $3,270,000.
The related federal contract opportunity seeks bids to replace an existing bridge in Walker County, Texas damaged during Hurricane Harvey. Major work elements include driven piles, pre-cast concrete box beams, structural concrete, reinforcing steel, and bridge railing. The project value is estimated between $2,000,000 to $4,000,000, with contract award anticipated by June 2020 and construction from June 2020 to January 2021. Significant line items include 1,600 linear feet of driven H-pile; 500 square yards of sheet pile; 2,300 linear feet of pre-cast box beams; 500 cubic yards of structural concrete; and 96,000 pounds of reinforcing steel.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Opening Summary
Project Name: Stubblefield Lake Road Bridge Replacement Project Number: TX ERFO 215(1) Bid Opening Date: 6/4/2020 Time: 2:00 p.m. MST Bid Opening Location: Lakewood, CO Bid Opening Officer: Josie Helms Amendments: (1) ____________(2) _____________(3)
(4)
| Bidder’s Name |
| Schedule A / Bid Total |
1.
Stronghold Engineering, Inc., Perris, CA $3,846,160.54
2.
Jay-Reese Contractors, Inc., Dripping Springs, TX $3,720,155.00
3.
JCF Bridge & Concrete, Inc., Driftwood, TX $3,397,542.50
4.
5.
6.
7.
8.
Engineer’s Estimate
$3,270,000.00
File details come from the government source that posted it. Updated .