Teton Canyon Trail Bridge Replacements

Closed Solicitation Posted

Solicitation number
1240LN25R0007
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Driggs, Idaho 83422, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The USDA Forest Service is procuring the construction of two trail bridges near Driggs, Idaho, through solicitation number 1240LN25R0008. The project involves removing existing bridges and constructing new prefabricated steel pedestrian bridges at two locations: Sheep Bridge (Bridge One) on Forest Service trail 6130 approximately 7.3 miles east of Driggs, and Treasure Lake Bridge (Bridge Two) located approximately 9.6 miles east of Driggs off Teton Canyon Road. Contractors must design bridge structures, perform load ratings, fabricate components, and complete installation including foundation work, crane pad construction, and environmental restoration. Proposals will be evaluated based on three primary factors with cost/price being the most important, followed by technical competency (including management plan and key personnel), and past performance. The original proposal deadline of September 24, 2025, has been amended and extended to September 29, 2025, at 12:00 p.m. CDT, with all submissions required electronically to crystal.amos@usda.gov.

This opportunity is designated as a total small business set-aside under NAICS code 237310 (Highway, Street, and Bridge Construction), with no incumbent contractors identified in the documentation. The project has an estimated magnitude between $500,000 and $1,000,000, encompassing both base construction activities and optional items for bridge supply and installation. The performance period extends from the award date through November 30, 2026, with work restricted to occur between August 1 and March 14 due to stream permit requirements. The project locations are situated in the Caribou-Targhee National Forest on the Teton Basin Ranger District, with the Sheep Bridge requiring replacement of a 50-foot span with an 80-foot prefabricated steel underhung truss bridge, and the Treasure Lake Bridge involving construction of a 90-foot prefabricated steel underhung truss bridge. The contractor will be subject to liquidated damages of $160.00 per calendar day for any delays in project completion.

Notice text

Teton Canyon Bridge Replacement:  Construction of two trail bridges near Driggs, Idaho on the Teton Basin Ranger District, (Bridge One), is located on Forest Service trail 6130, Sheep Bridge trail, approximately 7.3 miles east of Driggs, Idaho. Bridge Two is located off Teton Canyon Road approximately 9.6 miles east of Driggs, Idaho. 

Files

Show all 12

Similar open opportunities

Opportunity Agency Set-aside Responses due
Cisco Branch Ontonagon River Bridge Replacement Watersmeet, Michigan 49969, United States · NAICS 237310 Forest Service Total Small Business
ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 Coeur d Alene, Idaho, United States · NAICS 237310 Federal Highway Administration No set-aside
Big Springs Horse Corral Replacement Lava Hot Springs, Idaho 83246, United States · NAICS 238990 Forest Service Total Small Business
YELL 338223 - Bridge Preservation NAICS 237310 National Office No set-aside
UT NP ARCH 100(2) Bridges on Delicate Arch Road Moab, Utah 84532, United States · NAICS 237310 Federal Highway Administration No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity