A10_Atch_2_Schedule_Of_Items.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Teton Canyon Trail Bridge Replacements
Solicitation number
1240LN25R0007
Issued by

About this file

This document is a Schedule of Items spreadsheet for the Teton Canyon Tail Bridge Replacements project (Solicitation Number 1240LN25R0007) issued by the Department of Agriculture Forest Service. The schedule outlines two bridge replacement projects: Sheep Bridge and Treasure Lake Bridge, with a comprehensive breakdown of construction activities including mobilization, soil erosion control, excavation, bridge removal, and bridge superstructure installation. The detailed line items cover multiple construction phases, with each project having a base scope and additional options, specifically detailing the procurement of prefabricated steel underhung truss bridge superstructures, precast concrete grade beams, and associated site preparation and stabilization work. Although the unit costs are currently listed as $0, the spreadsheet provides a structured framework for the bridge replacement project near Driggs, Idaho, covering critical infrastructure improvements on Forest Service trails.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1 Schedule Of Items

CANYON BRIDGE, 1240LN25R0007

Project Name: Sheep Bridge Replacement
CONTRACTOR NAME:
Project Total Including Options
Date:
Item No.DescriptionUnitQuantity
Unit CostTotal
151-01Mobilization (Includes crane)Lump Sum1$0$0
157-13Soil erosion and pollution controlLump Sum1$0$0
203-01Removal of Bridge, Boardwalk, Concrete Planks, & Steel Rods, Disposal Method (a)Lump Sum1$0$0
204-01Excavation and Embankment, Placement Method 6, Includes old road fill & channel
recontouringLump Sum1$0$0
208-06Structure Excavation and BackfillLump Sum1$0$0
272-01Geocell Abutment Stabilization, 6" DepthEach2$0$0
552-01Fabricate & Install 18"x30"x12' Precast
Concrete Grade BeamsEach2$0$0
571-0280' Prefabricated Steel Underhung Truss Bridge Superstructure: Design, Fabricate,
Transport, & InstallLump Sum1$0$0
605-01Install Abutment 2 Drain Rock & GeotextileLump Sum1$0$0
BASE TOTAL$0.00
Project Name: Treasure Lake Bridge
Item No.DescriptionUnitQuantityUnit CostTotal
Option 1
571-0290' Prefabricated Steel Underhung Truss Bridge Superstructure: Design, Fabricate, &
TransportLump Sum1$0$0
552-01Fabricate 18"x30"x12' Precast Concrete Grade
BeamsEach2$0$0
OPTION 1
TOTAL$0
Option 2
151-01Mobilization (Includes crane)Lump Sum1$0$0
157-13Soil erosion and pollution controlLump Sum1$0$0
201Clearing and GrubbingLump Sum1$0$0
204-01Excavation and Embankment, Placement
Method 6.Lump Sum1$0$0
208-06Structure Excavation and BackfillLump Sum1$0$0
272-01Geocell Abutment Stabilization, 6" DepthEach2$0$0
552-01Install 18"x30"x12' Precast Concrete Grade
BeamsEach2$0.00$0
571-02Install 90' Prefabricated Steel Underhung
Truss Bridge SuperstructureLump Sum1$0.00$0
OPTION 2 TOTAL$0.00