A10_Atch_2_Schedule_Of_Items.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Teton Canyon Trail Bridge Replacements
- Solicitation number
- 1240LN25R0007
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Schedule of Items spreadsheet for the Teton Canyon Tail Bridge Replacements project (Solicitation Number 1240LN25R0007) issued by the Department of Agriculture Forest Service. The schedule outlines two bridge replacement projects: Sheep Bridge and Treasure Lake Bridge, with a comprehensive breakdown of construction activities including mobilization, soil erosion control, excavation, bridge removal, and bridge superstructure installation. The detailed line items cover multiple construction phases, with each project having a base scope and additional options, specifically detailing the procurement of prefabricated steel underhung truss bridge superstructures, precast concrete grade beams, and associated site preparation and stabilization work. Although the unit costs are currently listed as $0, the spreadsheet provides a structured framework for the bridge replacement project near Driggs, Idaho, covering critical infrastructure improvements on Forest Service trails.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 Schedule Of Items
CANYON BRIDGE, 1240LN25R0007
| Project Name: Sheep Bridge Replacement |
| CONTRACTOR NAME: |
| Project Total Including Options | ||||||
| Date: | ||||||
| Item No. | Description | Unit | Quantity | |||
| Unit Cost | Total | |||||
| 151-01 | Mobilization (Includes crane) | Lump Sum | 1 | $0 | $0 | |
| 157-13 | Soil erosion and pollution control | Lump Sum | 1 | $0 | $0 | |
| 203-01 | Removal of Bridge, Boardwalk, Concrete Planks, & Steel Rods, Disposal Method (a) | Lump Sum | 1 | $0 | $0 | |
| 204-01 | Excavation and Embankment, Placement Method 6, Includes old road fill & channel | |||||
| recontouring | Lump Sum | 1 | $0 | $0 | ||
| 208-06 | Structure Excavation and Backfill | Lump Sum | 1 | $0 | $0 | |
| 272-01 | Geocell Abutment Stabilization, 6" Depth | Each | 2 | $0 | $0 | |
| 552-01 | Fabricate & Install 18"x30"x12' Precast | |||||
| Concrete Grade Beams | Each | 2 | $0 | $0 | ||
| 571-02 | 80' Prefabricated Steel Underhung Truss Bridge Superstructure: Design, Fabricate, | |||||
| Transport, & Install | Lump Sum | 1 | $0 | $0 | ||
| 605-01 | Install Abutment 2 Drain Rock & Geotextile | Lump Sum | 1 | $0 | $0 | |
| BASE TOTAL | $0.00 | |||||
| Project Name: Treasure Lake Bridge | ||||||
| Item No. | Description | Unit | Quantity | Unit Cost | Total | |
| Option 1 | ||||||
| 571-02 | 90' Prefabricated Steel Underhung Truss Bridge Superstructure: Design, Fabricate, & | |||||
| Transport | Lump Sum | 1 | $0 | $0 | ||
| 552-01 | Fabricate 18"x30"x12' Precast Concrete Grade | |||||
| Beams | Each | 2 | $0 | $0 | ||
| OPTION 1 | ||||||
| TOTAL | $0 | |||||
| Option 2 | ||||||
| 151-01 | Mobilization (Includes crane) | Lump Sum | 1 | $0 | $0 | |
| 157-13 | Soil erosion and pollution control | Lump Sum | 1 | $0 | $0 | |
| 201 | Clearing and Grubbing | Lump Sum | 1 | $0 | $0 | |
| 204-01 | Excavation and Embankment, Placement | |||||
| Method 6. | Lump Sum | 1 | $0 | $0 | ||
| 208-06 | Structure Excavation and Backfill | Lump Sum | 1 | $0 | $0 | |
| 272-01 | Geocell Abutment Stabilization, 6" Depth | Each | 2 | $0 | $0 | |
| 552-01 | Install 18"x30"x12' Precast Concrete Grade | |||||
| Beams | Each | 2 | $0.00 | $0 | ||
| 571-02 | Install 90' Prefabricated Steel Underhung | |||||
| Truss Bridge Superstructure | Lump Sum | 1 | $0.00 | $0 | ||
| OPTION 2 TOTAL | $0.00 |