Simplified Acquisition of Base Engineering Requirements (SABER)
Closed Solicitation Posted
This opportunity was awarded. See its 3 award notices in the notice history.
- Solicitation number
- FA820121R0007
- Agency
- Air Force Sustainment Center Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- Competitive 8(a)
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Hill Afb Ut 84056 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals for the Simplified Acquisition of Base Engineering Requirements (SABER) contract to provide maintenance, repair, and minor construction services. The Department of the Air Force Materiel Command Air Force Sustainment Center seeks to establish an indefinite-delivery, indefinite-quantity contract to cover work on facilities managed by the 75th Civil Engineering Group at Hill Air Force Base in Utah and other locations. Proposals are due by March 9, 2021 and attendance at a mandatory site visit on February 17, 2021 is required. Evaluation will be based on price, technical, and past performance factors. Questions are due by February 23, 2021 with government responses by March 2, 2021.
The contract is set aside for 8(a) small businesses under NAICS codes 237310 and 561210. The potential value is unspecified. Work will be performed at Hill Air Force Base and may include locations such as Little Mountain, Utah and the Utah Test and Training Range over a five-year period. Offerors must use the provided past performance tool and meet all requirements in the solicitation, including attendance at the mandatory site visit, to be eligible for award.
Notice text
8 versions
Update #8 · Latest ·
UPDATE: MARCH 18, 2021
For offerors that are hand delivering their proposals, please input the following coordinates into Google Maps for an exact location of our building. Drop-off Coordinates 41.1267078, -112.022215
We have recently discovered that our building address 6038 Aspen Ave. Bldg 1289NE takes you to the incorrect location when input into Google Maps. If you have any issues finding the location, please call the POCs on this posting.
UPDATE: MARCH 17, 2021
This update is to provide a single question and answer that was left off the latest Q&A Matrix. The question and answer is as follows:
Q: Would the Government like us to correct the feed for the sprinkler heads with continuous 1” pipe and remove the ½” fittings and pipe?
A: Yes. There should be approximately 5-6 feet of piping involved to accomplish this task.
UPDATE: MARCH 16, 2021
This update is to provide the following information and clarifications:
If you are a Prime contractor planning to submit a proposal for this requirement, please email the POCs listed on this posting to inform them of the method of delivery (shipping or hand-delivery), the day it will be delivered, and the approximate time. This information will help us ensure that someone is available to receive your proposal. If you have already shipped or delivered any portion of your proposal, please let us know when and how it was delivered.
- City Light and Power (CLP) will need to be involved because of the high voltage power lines running through that vault. The Prime may hire CLP to do all work associated with their power lines OR they can hire an independent contractor to perform all work CLP determines needs to be done and have CLP perform the inspections and connections and pay CLP for these services. This information can be found in the Basic SOW, Section 35.2, page 32 of 66.
- The government is aware that utilities may be in the way of the “proposed” location of the steam vaults. Final location will be determined once a complete evaluation of the area has been accomplished by the Civil Engineering Red Stakes Office, City Light & Power, American Water and the Communication Squadron. Once an evaluation of the area is complete, all attempts will be made to prevent the relocation of these utilities.
- IAW the Seed Project SOW 4.5 a) “The contractor shall demo steam/condensate piping and all associated components to facilitate new piping in vault.” In regards to this, the connection will be outside, not inside the building.
- The final responses from the Government to follow-up questions is attached and titled "Government Responses to Follow-Up Questions_03162021"
UPDATE: MARCH 11, 2021
This update is to provide the official amendment to the solicitation and the revised Attachment 15: Section L.
The documents included as part of this update are the following:
- Official amendment to the Solicitation - FA8201-21-R-0007-0001
- Revised Section L - Attachment 15 Section L - Revision 1
UPDATE: MARCH 11, 2021
This update is to provide offeror-requested documents and to provide a complete version of the Q&A matrix. Previous responses to the Q&A may have been updated or further clarified, therefore a complete review of the matrix may be necessary.
The documents included as part of this update are the following:
- Government Responses SABER Question Comment Matrix
- Bldg 100 Exisiting Steam Pipe Sizes
- Bldg 100 Utilities
- Bldg 100 Utilities
- Bldg 100 Landscape Symbols
UPDATE: MARCH 8, 2021
This update is to provide offeror-requested documents and extend the proposal due date to March 19, 2021. The Government responses to the questions are nearly complete; however there are still a few unanswered questions in the attachment. The Government intends to have all questions answered NLT, March 12, 2021. An official modification to the solicitation will be posted later this week.
The documents included as part of this update are the following:
- Government responses to Questions and Comments
- Asbestos and Lead Based Paint Report
- Site Visit Attendee Sheet
- HAZMAT Information
ORIGINAL POSTING
NOTICE: This is the official Request for Proposal (RFP) for the Simplified Acquisition of Base Engineering Requirements (SABER) construction services at Hill AFB, UT.
DESCRIPTION: The purpose of this solicitation is to establish the SABER contract which is an Indefinite-Delivery, Indefinite-Quantity (IDIQ), covering a broad range of maintenance, repair and minor construction work on various real property facilities managed by the 75th Civil Engineering Group (CEG) at Hill Air Force Base (HAFB). In addition to Hill AFB, project locations may also include, but are not limited to, Little Mountain, Utah; Utah Test and Training Range (UTTR); and Wyoming. Task Orders (TO) shall be issued under this contract to define specific project requirements. The SABER contract is set aside for 8(a) Small Business.
Attached to this posting is the Solicitation and all accompanying attachments. Please review all attachments for additional information regarding SABER requirements.
All current and future information concerning this effort will be posted under this solicitation number.
RESPONSES: All proposals are due no later than March 9, 2021 at 4:00 PM MST.
A site visit for the Seed Project will be held on Feb 17, 2021 at Hill AFB, UT. Offerors are required to attend the site visit in order to propose on the contract. Offerors are required to RSVP for the site visit no later than Feb 8, 2021 by 4:00 PM MST. Only those offerors that RSVP will be allowed to attend the site visit. Due to current COVID-19 restrictions, the Government will limit the number of personnel from each company to 10 individuals. This includes any subcontractors a company may bring. Additional information regarding the site visit, such as directions and instructions for COVID-19 precautions, will be sent to offerors after the RSVP date. At this time, the Government plans to schedule specific times throughout the day of the site visit for each company. This will be done to keep group numbers at or below 15.
Also attached to this posting is a Question and Comment Matrix. Please utilize this attachment when submitting questions and comments. All questions are due no later than February 23, 2021 at 4:00 PM MST. However, the Government encourages offerors to submit questions as soon as possible, in order to ensure the Government has adequate time to respond. Government responses to questions will be attached to this posting on approximately March 2, 2021. If questions are proprietary in nature, please indicate on the Question and Comment Matrix. Questions shall be submitted via email to the POCs listed on this posting.
Due to beta.sam.gov not allowing Microsoft Access Database attachments, please contact the Government POCs and a copy of the Past Performance Information (PPI) Tool will be emailed to your company. The PPI Tool is required to submit your Past Performance Information.
Government Points of Contact
Brad Conroy, Contract Specialist, Email: bradley.conroy@us.af.mil
Brady Smith, Contracting Officer, Email: brady.smith@us.af.mil
Update #7 ·
UPDATE: MARCH 17, 2021
This update is to provide a single question and answer that was left off the latest Q&A Matrix. The question and answer is as follows:
Q: Would the Government like us to correct the feed for the sprinkler heads with continuous 1” pipe and remove the ½” fittings and pipe?
A: Yes. There should be approximately 5-6 feet of piping involved to accomplish this task.
UPDATE: MARCH 16, 2021
This update is to provide the following information and clarifications:
If you are a Prime contractor planning to submit a proposal for this requirement, please email the POCs listed on this posting to inform them of the method of delivery (shipping or hand-delivery), the day it will be delivered, and the approximate time. This information will help us ensure that someone is available to receive your proposal. If you have already shipped or delivered any portion of your proposal, please let us know when and how it was delivered.
- City Light and Power (CLP) will need to be involved because of the high voltage power lines running through that vault. The Prime may hire CLP to do all work associated with their power lines OR they can hire an independent contractor to perform all work CLP determines needs to be done and have CLP perform the inspections and connections and pay CLP for these services. This information can be found in the Basic SOW, Section 35.2, page 32 of 66.
- The government is aware that utilities may be in the way of the “proposed” location of the steam vaults. Final location will be determined once a complete evaluation of the area has been accomplished by the Civil Engineering Red Stakes Office, City Light & Power, American Water and the Communication Squadron. Once an evaluation of the area is complete, all attempts will be made to prevent the relocation of these utilities.
- IAW the Seed Project SOW 4.5 a) “The contractor shall demo steam/condensate piping and all associated components to facilitate new piping in vault.” In regards to this, the connection will be outside, not inside the building.
- The final responses from the Government to follow-up questions is attached and titled "Government Responses to Follow-Up Questions_03162021"
UPDATE: MARCH 11, 2021
This update is to provide the official amendment to the solicitation and the revised Attachment 15: Section L.
The documents included as part of this update are the following:
- Official amendment to the Solicitation - FA8201-21-R-0007-0001
- Revised Section L - Attachment 15 Section L - Revision 1
UPDATE: MARCH 11, 2021
This update is to provide offeror-requested documents and to provide a complete version of the Q&A matrix. Previous responses to the Q&A may have been updated or further clarified, therefore a complete review of the matrix may be necessary.
The documents included as part of this update are the following:
- Government Responses SABER Question Comment Matrix
- Bldg 100 Exisiting Steam Pipe Sizes
- Bldg 100 Utilities
- Bldg 100 Utilities
- Bldg 100 Landscape Symbols
UPDATE: MARCH 8, 2021
This update is to provide offeror-requested documents and extend the proposal due date to March 19, 2021. The Government responses to the questions are nearly complete; however there are still a few unanswered questions in the attachment. The Government intends to have all questions answered NLT, March 12, 2021. An official modification to the solicitation will be posted later this week.
The documents included as part of this update are the following:
- Government responses to Questions and Comments
- Asbestos and Lead Based Paint Report
- Site Visit Attendee Sheet
- HAZMAT Information
ORIGINAL POSTING
NOTICE: This is the official Request for Proposal (RFP) for the Simplified Acquisition of Base Engineering Requirements (SABER) construction services at Hill AFB, UT.
DESCRIPTION: The purpose of this solicitation is to establish the SABER contract which is an Indefinite-Delivery, Indefinite-Quantity (IDIQ), covering a broad range of maintenance, repair and minor construction work on various real property facilities managed by the 75th Civil Engineering Group (CEG) at Hill Air Force Base (HAFB). In addition to Hill AFB, project locations may also include, but are not limited to, Little Mountain, Utah; Utah Test and Training Range (UTTR); and Wyoming. Task Orders (TO) shall be issued under this contract to define specific project requirements. The SABER contract is set aside for 8(a) Small Business.
Attached to this posting is the Solicitation and all accompanying attachments. Please review all attachments for additional information regarding SABER requirements.
All current and future information concerning this effort will be posted under this solicitation number.
RESPONSES: All proposals are due no later than March 9, 2021 at 4:00 PM MST.
A site visit for the Seed Project will be held on Feb 17, 2021 at Hill AFB, UT. Offerors are required to attend the site visit in order to propose on the contract. Offerors are required to RSVP for the site visit no later than Feb 8, 2021 by 4:00 PM MST. Only those offerors that RSVP will be allowed to attend the site visit. Due to current COVID-19 restrictions, the Government will limit the number of personnel from each company to 10 individuals. This includes any subcontractors a company may bring. Additional information regarding the site visit, such as directions and instructions for COVID-19 precautions, will be sent to offerors after the RSVP date. At this time, the Government plans to schedule specific times throughout the day of the site visit for each company. This will be done to keep group numbers at or below 15.
Also attached to this posting is a Question and Comment Matrix. Please utilize this attachment when submitting questions and comments. All questions are due no later than February 23, 2021 at 4:00 PM MST. However, the Government encourages offerors to submit questions as soon as possible, in order to ensure the Government has adequate time to respond. Government responses to questions will be attached to this posting on approximately March 2, 2021. If questions are proprietary in nature, please indicate on the Question and Comment Matrix. Questions shall be submitted via email to the POCs listed on this posting.
Due to beta.sam.gov not allowing Microsoft Access Database attachments, please contact the Government POCs and a copy of the Past Performance Information (PPI) Tool will be emailed to your company. The PPI Tool is required to submit your Past Performance Information.
Government Points of Contact
Brad Conroy, Contract Specialist, Email: bradley.conroy@us.af.mil
Brady Smith, Contracting Officer, Email: brady.smith@us.af.mil
Update #6 ·
UPDATE: MARCH 16, 2021
This update is to provide the following information and clarifications:
If you are a Prime contractor planning to submit a proposal for this requirement, please email the POCs listed on this posting to inform them of the method of delivery (shipping or hand-delivery), the day it will be delivered, and the approximate time. This information will help us ensure that someone is available to receive your proposal. If you have already shipped or delivered any portion of your proposal, please let us know when and how it was delivered.
- City Light and Power (CLP) will need to be involved because of the high voltage power lines running through that vault. The Prime may hire CLP to do all work associated with their power lines OR they can hire an independent contractor to perform all work CLP determines needs to be done and have CLP perform the inspections and connections and pay CLP for these services. This information can be found in the Basic SOW, Section 35.2, page 32 of 66.
- The government is aware that utilities may be in the way of the “proposed” location of the steam vaults. Final location will be determined once a complete evaluation of the area has been accomplished by the Civil Engineering Red Stakes Office, City Light & Power, American Water and the Communication Squadron. Once an evaluation of the area is complete, all attempts will be made to prevent the relocation of these utilities.
- IAW the Seed Project SOW 4.5 a) “The contractor shall demo steam/condensate piping and all associated components to facilitate new piping in vault.” In regards to this, the connection will be outside, not inside the building.
- The final responses from the Government to follow-up questions is attached and titled "Government Responses to Follow-Up Questions_03162021"
UPDATE: MARCH 11, 2021
This update is to provide the official amendment to the solicitation and the revised Attachment 15: Section L.
The documents included as part of this update are the following:
- Official amendment to the Solicitation - FA8201-21-R-0007-0001
- Revised Section L - Attachment 15 Section L - Revision 1
UPDATE: MARCH 11, 2021
This update is to provide offeror-requested documents and to provide a complete version of the Q&A matrix. Previous responses to the Q&A may have been updated or further clarified, therefore a complete review of the matrix may be necessary.
The documents included as part of this update are the following:
- Government Responses SABER Question Comment Matrix
- Bldg 100 Exisiting Steam Pipe Sizes
- Bldg 100 Utilities
- Bldg 100 Utilities
- Bldg 100 Landscape Symbols
UPDATE: MARCH 8, 2021
This update is to provide offeror-requested documents and extend the proposal due date to March 19, 2021. The Government responses to the questions are nearly complete; however there are still a few unanswered questions in the attachment. The Government intends to have all questions answered NLT, March 12, 2021. An official modification to the solicitation will be posted later this week.
The documents included as part of this update are the following:
- Government responses to Questions and Comments
- Asbestos and Lead Based Paint Report
- Site Visit Attendee Sheet
- HAZMAT Information
ORIGINAL POSTING
NOTICE: This is the official Request for Proposal (RFP) for the Simplified Acquisition of Base Engineering Requirements (SABER) construction services at Hill AFB, UT.
DESCRIPTION: The purpose of this solicitation is to establish the SABER contract which is an Indefinite-Delivery, Indefinite-Quantity (IDIQ), covering a broad range of maintenance, repair and minor construction work on various real property facilities managed by the 75th Civil Engineering Group (CEG) at Hill Air Force Base (HAFB). In addition to Hill AFB, project locations may also include, but are not limited to, Little Mountain, Utah; Utah Test and Training Range (UTTR); and Wyoming. Task Orders (TO) shall be issued under this contract to define specific project requirements. The SABER contract is set aside for 8(a) Small Business.
Attached to this posting is the Solicitation and all accompanying attachments. Please review all attachments for additional information regarding SABER requirements.
All current and future information concerning this effort will be posted under this solicitation number.
RESPONSES: All proposals are due no later than March 9, 2021 at 4:00 PM MST.
A site visit for the Seed Project will be held on Feb 17, 2021 at Hill AFB, UT. Offerors are required to attend the site visit in order to propose on the contract. Offerors are required to RSVP for the site visit no later than Feb 8, 2021 by 4:00 PM MST. Only those offerors that RSVP will be allowed to attend the site visit. Due to current COVID-19 restrictions, the Government will limit the number of personnel from each company to 10 individuals. This includes any subcontractors a company may bring. Additional information regarding the site visit, such as directions and instructions for COVID-19 precautions, will be sent to offerors after the RSVP date. At this time, the Government plans to schedule specific times throughout the day of the site visit for each company. This will be done to keep group numbers at or below 15.
Also attached to this posting is a Question and Comment Matrix. Please utilize this attachment when submitting questions and comments. All questions are due no later than February 23, 2021 at 4:00 PM MST. However, the Government encourages offerors to submit questions as soon as possible, in order to ensure the Government has adequate time to respond. Government responses to questions will be attached to this posting on approximately March 2, 2021. If questions are proprietary in nature, please indicate on the Question and Comment Matrix. Questions shall be submitted via email to the POCs listed on this posting.
Due to beta.sam.gov not allowing Microsoft Access Database attachments, please contact the Government POCs and a copy of the Past Performance Information (PPI) Tool will be emailed to your company. The PPI Tool is required to submit your Past Performance Information.
Government Points of Contact
Brad Conroy, Contract Specialist, Email: bradley.conroy@us.af.mil
Brady Smith, Contracting Officer, Email: brady.smith@us.af.mil
Update #5 ·
UPDATE: MARCH 16, 2021
This update is to provide the following information and clarifications:
If you are a Prime contractor planning to submit a proposal for this requirement, please email the POCs listed on this posting to inform them of the method of delivery (shipping or hand-delivery), the day it will be delivered, and the approximate time. This information will help us ensure that someone is available to receive your proposal. If you have already shipped or delivered any portion of your proposal, please let us know when and how it was delivered.
- City Light and Power (CLP) will need to be involved because of the high voltage power lines running through that vault. The Prime may hire CLP to do all work associated with their power lines OR they can hire an independent contractor to perform all work CLP determines needs to be done and have CLP perform the inspections and connections and pay CLP for these services. This information can be found in the Basic SOW, Section 35.2, page 32 of 66.
- The government is aware that utilities may be in the way of the “proposed” location of the steam vaults. Final location will be determined once a complete evaluation of the area has been accomplished by the Civil Engineering Red Stakes Office, City Light & Power, American Water and the Communication Squadron. Once an evaluation of the area is complete, all attempts will be made to prevent the relocation of these utilities.
- IAW the Seed Project SOW 4.5 a) “The contractor shall demo steam/condensate piping and all associated components to facilitate new piping in vault.” In regards to this, the connection will be outside, not inside the building.
UPDATE: MARCH 11, 2021
This update is to provide the official amendment to the solicitation and the revised Attachment 15: Section L.
The documents included as part of this update are the following:
- Official amendment to the Solicitation - FA8201-21-R-0007-0001
- Revised Section L - Attachment 15 Section L - Revision 1
UPDATE: MARCH 11, 2021
This update is to provide offeror-requested documents and to provide a complete version of the Q&A matrix. Previous responses to the Q&A may have been updated or further clarified, therefore a complete review of the matrix may be necessary.
The documents included as part of this update are the following:
- Government Responses SABER Question Comment Matrix
- Bldg 100 Exisiting Steam Pipe Sizes
- Bldg 100 Utilities
- Bldg 100 Utilities
- Bldg 100 Landscape Symbols
UPDATE: MARCH 8, 2021
This update is to provide offeror-requested documents and extend the proposal due date to March 19, 2021. The Government responses to the questions are nearly complete; however there are still a few unanswered questions in the attachment. The Government intends to have all questions answered NLT, March 12, 2021. An official modification to the solicitation will be posted later this week.
The documents included as part of this update are the following:
- Government responses to Questions and Comments
- Asbestos and Lead Based Paint Report
- Site Visit Attendee Sheet
- HAZMAT Information
ORIGINAL POSTING
NOTICE: This is the official Request for Proposal (RFP) for the Simplified Acquisition of Base Engineering Requirements (SABER) construction services at Hill AFB, UT.
DESCRIPTION: The purpose of this solicitation is to establish the SABER contract which is an Indefinite-Delivery, Indefinite-Quantity (IDIQ), covering a broad range of maintenance, repair and minor construction work on various real property facilities managed by the 75th Civil Engineering Group (CEG) at Hill Air Force Base (HAFB). In addition to Hill AFB, project locations may also include, but are not limited to, Little Mountain, Utah; Utah Test and Training Range (UTTR); and Wyoming. Task Orders (TO) shall be issued under this contract to define specific project requirements. The SABER contract is set aside for 8(a) Small Business.
Attached to this posting is the Solicitation and all accompanying attachments. Please review all attachments for additional information regarding SABER requirements.
All current and future information concerning this effort will be posted under this solicitation number.
RESPONSES: All proposals are due no later than March 9, 2021 at 4:00 PM MST.
A site visit for the Seed Project will be held on Feb 17, 2021 at Hill AFB, UT. Offerors are required to attend the site visit in order to propose on the contract. Offerors are required to RSVP for the site visit no later than Feb 8, 2021 by 4:00 PM MST. Only those offerors that RSVP will be allowed to attend the site visit. Due to current COVID-19 restrictions, the Government will limit the number of personnel from each company to 10 individuals. This includes any subcontractors a company may bring. Additional information regarding the site visit, such as directions and instructions for COVID-19 precautions, will be sent to offerors after the RSVP date. At this time, the Government plans to schedule specific times throughout the day of the site visit for each company. This will be done to keep group numbers at or below 15.
Also attached to this posting is a Question and Comment Matrix. Please utilize this attachment when submitting questions and comments. All questions are due no later than February 23, 2021 at 4:00 PM MST. However, the Government encourages offerors to submit questions as soon as possible, in order to ensure the Government has adequate time to respond. Government responses to questions will be attached to this posting on approximately March 2, 2021. If questions are proprietary in nature, please indicate on the Question and Comment Matrix. Questions shall be submitted via email to the POCs listed on this posting.
Due to beta.sam.gov not allowing Microsoft Access Database attachments, please contact the Government POCs and a copy of the Past Performance Information (PPI) Tool will be emailed to your company. The PPI Tool is required to submit your Past Performance Information.
Government Points of Contact
Brad Conroy, Contract Specialist, Email: bradley.conroy@us.af.mil
Brady Smith, Contracting Officer, Email: brady.smith@us.af.mil
Update #4 ·
UPDATE: MARCH 11, 2021
This update is to provide the official amendment to the solicitation and the revised Attachment 15: Section L.
The documents included as part of this update are the following:
- Official amendment to the Solicitation - FA8201-21-R-0007-0001
- Revised Section L - Attachment 15 Section L - Revision 1
UPDATE: MARCH 11, 2021
This update is to provide offeror-requested documents and to provide a complete version of the Q&A matrix. Previous responses to the Q&A may have been updated or further clarified, therefore a complete review of the matrix may be necessary.
The documents included as part of this update are the following:
- Government Responses SABER Question Comment Matrix
- Bldg 100 Exisiting Steam Pipe Sizes
- Bldg 100 Utilities
- Bldg 100 Utilities
- Bldg 100 Landscape Symbols
UPDATE: MARCH 8, 2021
This update is to provide offeror-requested documents and extend the proposal due date to March 19, 2021. The Government responses to the questions are nearly complete; however there are still a few unanswered questions in the attachment. The Government intends to have all questions answered NLT, March 12, 2021. An official modification to the solicitation will be posted later this week.
The documents included as part of this update are the following:
- Government responses to Questions and Comments
- Asbestos and Lead Based Paint Report
- Site Visit Attendee Sheet
- HAZMAT Information
ORIGINAL POSTING
NOTICE: This is the official Request for Proposal (RFP) for the Simplified Acquisition of Base Engineering Requirements (SABER) construction services at Hill AFB, UT.
DESCRIPTION: The purpose of this solicitation is to establish the SABER contract which is an Indefinite-Delivery, Indefinite-Quantity (IDIQ), covering a broad range of maintenance, repair and minor construction work on various real property facilities managed by the 75th Civil Engineering Group (CEG) at Hill Air Force Base (HAFB). In addition to Hill AFB, project locations may also include, but are not limited to, Little Mountain, Utah; Utah Test and Training Range (UTTR); and Wyoming. Task Orders (TO) shall be issued under this contract to define specific project requirements. The SABER contract is set aside for 8(a) Small Business.
Attached to this posting is the Solicitation and all accompanying attachments. Please review all attachments for additional information regarding SABER requirements.
All current and future information concerning this effort will be posted under this solicitation number.
RESPONSES: All proposals are due no later than March 9, 2021 at 4:00 PM MST.
A site visit for the Seed Project will be held on Feb 17, 2021 at Hill AFB, UT. Offerors are required to attend the site visit in order to propose on the contract. Offerors are required to RSVP for the site visit no later than Feb 8, 2021 by 4:00 PM MST. Only those offerors that RSVP will be allowed to attend the site visit. Due to current COVID-19 restrictions, the Government will limit the number of personnel from each company to 10 individuals. This includes any subcontractors a company may bring. Additional information regarding the site visit, such as directions and instructions for COVID-19 precautions, will be sent to offerors after the RSVP date. At this time, the Government plans to schedule specific times throughout the day of the site visit for each company. This will be done to keep group numbers at or below 15.
Also attached to this posting is a Question and Comment Matrix. Please utilize this attachment when submitting questions and comments. All questions are due no later than February 23, 2021 at 4:00 PM MST. However, the Government encourages offerors to submit questions as soon as possible, in order to ensure the Government has adequate time to respond. Government responses to questions will be attached to this posting on approximately March 2, 2021. If questions are proprietary in nature, please indicate on the Question and Comment Matrix. Questions shall be submitted via email to the POCs listed on this posting.
Due to beta.sam.gov not allowing Microsoft Access Database attachments, please contact the Government POCs and a copy of the Past Performance Information (PPI) Tool will be emailed to your company. The PPI Tool is required to submit your Past Performance Information.
Government Points of Contact
Brad Conroy, Contract Specialist, Email: bradley.conroy@us.af.mil
Brady Smith, Contracting Officer, Email: brady.smith@us.af.mil
Update #3 ·
UPDATE: MARCH 11, 2021
This update is to provide offeror-requested documents and to provide a complete version of the Q&A matrix. Previous responses to the Q&A may have been updated or further clarified, therefore a complete review of the matrix may be necessary.
The documents included as part of this update are the following:
- Government Responses SABER Question Comment Matrix
- Bldg 100 Exisiting Steam Pipe Sizes
- Bldg 100 Utilities
- Bldg 100 Utilities
- Bldg 100 Landscape Symbols
UPDATE: MARCH 8, 2021
This update is to provide offeror-requested documents and extend the proposal due date to March 19, 2021. The Government responses to the questions are nearly complete; however there are still a few unanswered questions in the attachment. The Government intends to have all questions answered NLT, March 12, 2021. An official modification to the solicitation will be posted later this week.
The documents included as part of this update are the following:
- Government responses to Questions and Comments
- Asbestos and Lead Based Paint Report
- Site Visit Attendee Sheet
- HAZMAT Information
ORIGINAL POSTING
NOTICE: This is the official Request for Proposal (RFP) for the Simplified Acquisition of Base Engineering Requirements (SABER) construction services at Hill AFB, UT.
DESCRIPTION: The purpose of this solicitation is to establish the SABER contract which is an Indefinite-Delivery, Indefinite-Quantity (IDIQ), covering a broad range of maintenance, repair and minor construction work on various real property facilities managed by the 75th Civil Engineering Group (CEG) at Hill Air Force Base (HAFB). In addition to Hill AFB, project locations may also include, but are not limited to, Little Mountain, Utah; Utah Test and Training Range (UTTR); and Wyoming. Task Orders (TO) shall be issued under this contract to define specific project requirements. The SABER contract is set aside for 8(a) Small Business.
Attached to this posting is the Solicitation and all accompanying attachments. Please review all attachments for additional information regarding SABER requirements.
All current and future information concerning this effort will be posted under this solicitation number.
RESPONSES: All proposals are due no later than March 9, 2021 at 4:00 PM MST.
A site visit for the Seed Project will be held on Feb 17, 2021 at Hill AFB, UT. Offerors are required to attend the site visit in order to propose on the contract. Offerors are required to RSVP for the site visit no later than Feb 8, 2021 by 4:00 PM MST. Only those offerors that RSVP will be allowed to attend the site visit. Due to current COVID-19 restrictions, the Government will limit the number of personnel from each company to 10 individuals. This includes any subcontractors a company may bring. Additional information regarding the site visit, such as directions and instructions for COVID-19 precautions, will be sent to offerors after the RSVP date. At this time, the Government plans to schedule specific times throughout the day of the site visit for each company. This will be done to keep group numbers at or below 15.
Also attached to this posting is a Question and Comment Matrix. Please utilize this attachment when submitting questions and comments. All questions are due no later than February 23, 2021 at 4:00 PM MST. However, the Government encourages offerors to submit questions as soon as possible, in order to ensure the Government has adequate time to respond. Government responses to questions will be attached to this posting on approximately March 2, 2021. If questions are proprietary in nature, please indicate on the Question and Comment Matrix. Questions shall be submitted via email to the POCs listed on this posting.
Due to beta.sam.gov not allowing Microsoft Access Database attachments, please contact the Government POCs and a copy of the Past Performance Information (PPI) Tool will be emailed to your company. The PPI Tool is required to submit your Past Performance Information.
Government Points of Contact
Brad Conroy, Contract Specialist, Email: bradley.conroy@us.af.mil
Brady Smith, Contracting Officer, Email: brady.smith@us.af.mil
Update #2 ·
UPDATE: MARCH 8, 2021
This update is to provide offeror-requested documents and extend the proposal due date to March 19, 2021. The Government responses to the questions are nearly complete; however there are still a few unanswered questions in the attachment. The Government intends to have all questions answered NLT, March 12, 2021. An official modification to the solicitation will be posted later this week.
The documents included as part of this update are the following:
- Government responses to Questions and Comments
- Asbestos and Lead Based Paint Report
- Site Visit Attendee Sheet
- HAZMAT Information
ORIGINAL POSTING
NOTICE: This is the official Request for Proposal (RFP) for the Simplified Acquisition of Base Engineering Requirements (SABER) construction services at Hill AFB, UT.
DESCRIPTION: The purpose of this solicitation is to establish the SABER contract which is an Indefinite-Delivery, Indefinite-Quantity (IDIQ), covering a broad range of maintenance, repair and minor construction work on various real property facilities managed by the 75th Civil Engineering Group (CEG) at Hill Air Force Base (HAFB). In addition to Hill AFB, project locations may also include, but are not limited to, Little Mountain, Utah; Utah Test and Training Range (UTTR); and Wyoming. Task Orders (TO) shall be issued under this contract to define specific project requirements. The SABER contract is set aside for 8(a) Small Business.
Attached to this posting is the Solicitation and all accompanying attachments. Please review all attachments for additional information regarding SABER requirements.
All current and future information concerning this effort will be posted under this solicitation number.
RESPONSES: All proposals are due no later than March 9, 2021 at 4:00 PM MST.
A site visit for the Seed Project will be held on Feb 17, 2021 at Hill AFB, UT. Offerors are required to attend the site visit in order to propose on the contract. Offerors are required to RSVP for the site visit no later than Feb 8, 2021 by 4:00 PM MST. Only those offerors that RSVP will be allowed to attend the site visit. Due to current COVID-19 restrictions, the Government will limit the number of personnel from each company to 10 individuals. This includes any subcontractors a company may bring. Additional information regarding the site visit, such as directions and instructions for COVID-19 precautions, will be sent to offerors after the RSVP date. At this time, the Government plans to schedule specific times throughout the day of the site visit for each company. This will be done to keep group numbers at or below 15.
Also attached to this posting is a Question and Comment Matrix. Please utilize this attachment when submitting questions and comments. All questions are due no later than February 23, 2021 at 4:00 PM MST. However, the Government encourages offerors to submit questions as soon as possible, in order to ensure the Government has adequate time to respond. Government responses to questions will be attached to this posting on approximately March 2, 2021. If questions are proprietary in nature, please indicate on the Question and Comment Matrix. Questions shall be submitted via email to the POCs listed on this posting.
Due to beta.sam.gov not allowing Microsoft Access Database attachments, please contact the Government POCs and a copy of the Past Performance Information (PPI) Tool will be emailed to your company. The PPI Tool is required to submit your Past Performance Information.
Government Points of Contact
Brad Conroy, Contract Specialist, Email: bradley.conroy@us.af.mil
Brady Smith, Contracting Officer, Email: brady.smith@us.af.mil
Update #1 ·
NOTICE: This is the official Request for Proposal (RFP) for the Simplified Acquisition of Base Engineering Requirements (SABER) construction services at Hill AFB, UT.
DESCRIPTION: The purpose of this solicitation is to establish the SABER contract which is an Indefinite-Delivery, Indefinite-Quantity (IDIQ), covering a broad range of maintenance, repair and minor construction work on various real property facilities managed by the 75th Civil Engineering Group (CEG) at Hill Air Force Base (HAFB). In addition to Hill AFB, project locations may also include, but are not limited to, Little Mountain, Utah; Utah Test and Training Range (UTTR); and Wyoming. Task Orders (TO) shall be issued under this contract to define specific project requirements. The SABER contract is set aside for 8(a) Small Business.
Attached to this posting is the Solicitation and all accompanying attachments. Please review all attachments for additional information regarding SABER requirements.
All current and future information concerning this effort will be posted under this solicitation number.
RESPONSES: All proposals are due no later than March 9, 2021 at 4:00 PM MST.
A site visit for the Seed Project will be held on Feb 17, 2021 at Hill AFB, UT. Offerors are required to attend the site visit in order to propose on the contract. Offerors are required to RSVP for the site visit no later than Feb 8, 2021 by 4:00 PM MST. Only those offerors that RSVP will be allowed to attend the site visit. Due to current COVID-19 restrictions, the Government will limit the number of personnel from each company to 10 individuals. This includes any subcontractors a company may bring. Additional information regarding the site visit, such as directions and instructions for COVID-19 precautions, will be sent to offerors after the RSVP date. At this time, the Government plans to schedule specific times throughout the day of the site visit for each company. This will be done to keep group numbers at or below 15.
Also attached to this posting is a Question and Comment Matrix. Please utilize this attachment when submitting questions and comments. All questions are due no later than February 23, 2021 at 4:00 PM MST. However, the Government encourages offerors to submit questions as soon as possible, in order to ensure the Government has adequate time to respond. Government responses to questions will be attached to this posting on approximately March 2, 2021. If questions are proprietary in nature, please indicate on the Question and Comment Matrix. Questions shall be submitted via email to the POCs listed on this posting.
Due to beta.sam.gov not allowing Microsoft Access Database attachments, please contact the Government POCs and a copy of the Past Performance Information (PPI) Tool will be emailed to your company. The PPI Tool is required to submit your Past Performance Information.
Government Points of Contact
Brad Conroy, Contract Specialist, Email: bradley.conroy@us.af.mil
Brady Smith, Contracting Officer, Email: brady.smith@us.af.mil
Attachments
Show all 30
Notice history
| Notice | Type | Posted |
|---|---|---|
| Simplified Acquisition of Base Engineering Requirements (SABER) | Award Notice | |
| Simplified Acquisition of Base Engineering Requirements (SABER) | Award Notice | |
| Simplified Acquisition of Base Engineering Requirements (SABER) | Award Notice | |
| Simplified Acquisition of Base Engineering Requirements (SABER) | Solicitation | |
| SABER Consolidation Determination | Special Notice | |
| Simplified Acquisition of Base Engineering Requirements (SABER) | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity