Asbestos and LBP Report_Bldg 100 Bay N_O_P Modify Exterior_ Install Comm Room.pdf
PDF 347 KB Posted
- Solicitation number
- FA820121R0007
About this file
This solicitation requests proposals for a Simplified Acquisition of Base Engineering Requirements (SABER) construction services contract at Hill Air Force Base in Utah. The indefinite-delivery, indefinite-quantity contract will cover maintenance, repair, and minor construction work managed by the 75th Civil Engineering Group at Hill AFB and other locations. Task orders will define specific project requirements. The set-aside contract is for 8(a) small businesses. Proposals are due March 9, 2021. A mandatory site visit for the seed project will be held on February 17, 2021. Questions are due by February 23, 2021 with responses on March 2, 2021. The past performance information tool is required for submitting past performance. Points of contact are provided for questions.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SIGNATURE:
PREPARED BY: Casey Devlin (ASB#-6734, PB#-2550)
CONSTRUCT COMM ROOM AND MODIFY EXTERIOR
ORGANIZATION:
REQUESTED:
5906931
100 BAY N
ROBERT GARDNER
THE QUANTITIES WITHIN THIS REPORT ARE ESTIMATES AND SHOULD
NOT BE USED FOR BIDDING PURPOSES
309 SMXG
FACILITY CONSTRUCTION DATE:
DEPARTMENT OF THE AIR FORCE
75TH CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
LEAD BASED PAINT
ASBESTOS
LIMITED INSPECTION REPORT
Utah Certified State Inspector: Raudel Arteaga (ASB#-5863: Expires-18 September 2021, PB#-2244: Expires-6 Nov. 2022)
INSPECTION DATE: 18 February 2021
Reference UDAQ R307-807-6
INSPECTION DATE: 14 January 2020
WORK TASK #:
FACILITY:
REQUESTER:
14 May 2019
(This inspection is valid for three years from the inspection date regardless of Exp. Date of inspector cert. If past this date, a visual or additional assessment will then be required)
ASBESTOS
13% Chrysotile
DEPARTMENT OF THE AIR FORCE
75 CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
The quantities within this report are estimates and are not to be used for bidding purposes.
Table 1
SUMMARY OF ASBESTOS CONTAINING MATERIALS FOUND
MATERIAL TYPE
Canopys on South Side
*RACM
*Category I *Category II
FRIABILITY QUANTITY
50 Linear Feet
Construct Communication Room In Room 147 Bay NStatement of Work:
Category I Non-Friable ACM: Asbestos-containing packings, gaskets, resilient floor coverings, or asphalt roofing products containing more than 1% asbestos as determined by using the method specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM).
LIMITED ASBESTOS INSPECTION REPORT INFORMATION
RACM: Regulated Asbestos-Containing Material (RACM)" means friable ACM, Category I non-friable ACM that has become friable, Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation project operations.
Category II Non-Friable ACM: Any material, excluding Category I non- friable ACM, containing more than 1% asbestos as determined by using the methods specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM) that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
Paint Exterior of Bay N,O,P, Replace Awniings Remove Replace and Reconfigure South Steam Line Add Parking To South End of Bay P
This inspection was performed in accordance with the Utah Division of Air Quality (DAQ) requirements as found in the Utah Air Quality Rule R307-801-10. This inspection report is required to be on site during all abatement, renovation, and demolition activities. Samples referenced in this report were analyzed by polarized light microscopy (PLM) utilizing method 600R-93-116 by The Science and Engineering Laboratory (AIHA Acc.#-
101572) at Hill Air Force Base, Utah (R307-801-10.8.a-b).
Roof Flashing, Black
*LOCATIONS FOUND
Category INon Friable
Civil Engineering personnel also reviewed previous asbestos inspection reports of suspect asbestos containing materials (ACM) that could potentially be encountered in the proposed area/areas. The information gathered from all current and previous inspections is shown below by homogenous area (R307-801-9-4).
*Per UDAQ definition.
A total of 18 9
Drywall/Joint Compound Wall System 2'x4' Ceiling Tile, Pockmarks/Pinholes, White Thermal System Pipe Insulation, White/Yellow Pit Ground Debris
Results
MATERIAL TYPE
Per Hill AFB requirements, all materials containing any detectable amount of asbestos shall be handled as Asbestos Containing Material (ACM). Table 2 shows the summary of materials containing ≤1% that were identified via "Point Counting". Per EPA/UDAQ
≤1% is not considered to be an asbestos containing material, but special handling/packaging requirements are necessary per OSHA 29CFR 1926.1101 and
29CFR 1910.1001
Sample Location
QUANTITY
N/A
The following is a list of the "Suspect Materials" that were sampled as part of this inspection:
N/A
The following table summarizes the sampling data.
Homogenous Building Material, Description, Location, Quantity.
suspect materials assessed as part of the inspection.
Sample # samples reference the
Locations found: Locations of building materials as described in this report indicate where they were found, but do not necessarily mean that these are the only locations where these materials may be encountered during the project.
*LOCATIONS FOUND
N/A N/A
Table 3.
Window Sill Heavy Paint, Brown
Per EPA requirements, all materials analyzed as containing ≤10% asbestos are point counted utilizing EPA method 600/R-93/116 this information is summarized in Table 2.
Table 2.
ASBESTOS
Thermal System Pipe Fitting Insulation, Grey Roof Decking, Black Roof Flashing, Black Down Spout Heavy Paint Paint, Brown
GM190013 East Center None-Detected GM190014 Southeast None-Detected
2'x4' Ceiling Tile, Pockmarks/Pinholes, White, Room 147, Bay N, 200 Square Feet
GM190015 Northeast None-Detected GM200779 North Center None-Detected GM200780 Southeast None-Detected
Drywall/Joint Compound Wall System, Room 147, Bay N, 100 Square Feet
GM200781 Northeast None-Detected GM200782 North Center None-Detected GM200783 North Center None-Detected
GM210742 South None-Detected Thermal System Pipe Fitting Insulation, Grey, Exterior Pit Bay O, 25 Linear Feet GM210743 South None-Detected
Ground Debris Pit, , Exterior Pit Bay O, 50 Square Feet, GM210744 South None-Detected
Thermal System Pipe Insulation, White Over Yellow, Room 147 Attic and South Exterior Pit
Bay O, 20 Linear Feet GM200784 Center None-Detected
Window Sill Heavy Paint, Brown, Room 139, Bay N
None-DetectedSouth, Bay O AwningGM210747Roof Decking, Black, Awning Bay P, 50 Linear
Roof Flashing, Black, Awning Bay P, 50 Linear Feet, Window Sill Heavy Paint, Brown, Room 139, Bay N
Cell: (801)940-2970 Supervisor: Taylor Brimberry: DSN: (801)586-7094
Asbestos/LBP Shop 75 CES(CEOHA)
Asbestos/LBP Shop Personnel
DSN:(801)777-8006
CONTACT INFORMATION
Table 4.
POTENTIAL FOR ADDITIONAL MATERIALS:
This inspection report only encompasses the areas/materials designated within the scope of work that was provided at the date of inspection (see title page for inspection date). Should the scope of the project be altered in any way or any materials found that are not identified in this report shall require additional assessment. This report cannot be used for any other projects within the building.
Any questions or concerns regarding this inspection report or if any new suspect asbestos containing material (ACM) is encountered, stop work and contact the personnel listed below for further assistance/assessment.
GM210749 Southwest, Bay O None-Detected
GM210750
Northwest, Room 139, Bay O None-Detected
GM210745 South, Bay O Awning 13% Chrysotile GM210746 South, Bay O Awning 11% Chrysotile
GM210748
Southwest, Room 139, Bay N None-Detected
SCOPE OF WORK:
XL Number Substrate Component Color Lead Reading Paint
Condition 1482 Metal Rain Spout Brown 1.52 Poor 1483 Metal Rain Gutter Brown 15.28 Poor 1484 Metal Dock Edge Yellow 10.42 Poor 1487 Metal Dock Brown 24.55 Poor 1489 Metal Rain Spout Brown 15.77 Poor 1493 Metal Rain Spout Brown 1.01 Poor 1494 Metal Rain Spout Brown 5.66 Poor 1497 Metal Handrail Brown 0.85 Poor 1870 Metal Structural Steel White 2.90 Good 1871 Metal Structural Steel Orange 1.42 Good
DEPARTMENT OF THE AIR FORCE
75TH CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
1-Table 1 below, summarizes the painted/coated building components that tested positive for Lead Based Paint/Coating. These components should be segregated or abated prior to renovation or demolition, and a composite TCLP taken of the waste before disposal.
Construct Comm. Room, Modify Exterior
XRF Analyzer Used: XRF Analyzer XL3t 300 (Serial #96588)
5-This inspection report only encompasses the areas/materials designated within the scope of work that was provided at the date of the inspection (see title page for date). This report must be modified should the scope of the project be altered in any way or additional materials not previously identified within this report are encountered. This report may not be used for any other projects within the building.
LIMITED LEAD-BASED PAINT IDENTIFICATION REPORT INFORMATION
Table 1.
2-The condition column is the condition only of the painted/coated component (See final page for all readings/samples).
3-The U.S. Department of Housing and Urban Development defines Lead-based paint as any paint, varnish, stain, or other applied coating that has 1 mg/cm² as measured by an X-ray Fluorescence (XRF) Analyzer or laboratory analysis or 0.5 percent by weight (5,000 µg/g by dry weight) by laboratory analysis, or more of lead.
All other components tested were less than 0.80 mg/cm².
4-Any effort to disturb lead paint can create lead dust. Ensure that appropriate abatement, cleanup, and disposal will be accomplished and that appropriate safety measures are taken IAW 29 CFR 1926.62. If you have any questions concerning this report, contact the Asbestos/LBP Shop: Taylor Brimberry at 586-7094.
1475 0.97 1512 0.89 1476 1.11 1513 0.94
1477 1.06 POS 1514 0.97
Range: .8 to 1.2 Paint Range: .8 to 1.2 Side Condition Color PbL(mg/cm2) NEG/POS West Fair Brown 0.01 NEG West Fair Brown 0.01 NEG West Fair Brown 0.01 NEG West Poor Brown 0.36 NEG West Poor Brown 1.52 POS West Poor Brown 15.28 POS West Poor Yellow 10.42 POS West Poor Brown 0.01 NEG West Poor Brown 0.01 NEG West Poor Brown 24.55 POS West Poor Brown 0.12 NEG West Poor Brown 15.77 POS West Poor Brown 0.62 NEG West Poor Brown 0.56 NEG West Poor Brown 0.24 NEG West Poor Brown 1.01 POS West Poor Brown 5.66 POS South Poor Brown 0.01 NEG South Poor Brown 0.01 NEG South Poor Brown 0.85 POS South Poor Brown 0.45 NEG South Poor Brown 0.17 NEG South Poor White 0.01 NEG South Poor Brown 0.01 NEG South Poor Brown 0.01 NEG South Poor Brown 0.60 NEG South Poor White 0.01 NEG South Poor Brown 0.01 NEG South Poor White 0.4 NEG
Per 20 Second Reading
Calibration Range
Substrate
MetalAwning SoffitExterior Bay P
Exterior Bay N Window Sill Concrete
Post Calibration
PbL (mg/cm²)XRF Analyzer XL3t 300 (Serial #96588)
Per 20 Second Reading
1479 Exterior Bay N Awning Roof Metal 1478 Exterior Bay N Awning Post Metal
Pre Calibration PbL (mg/cm²) Calibration
Range Model# Serial #
XL Number Room/Area Structure
1480 Exterior Bay N Awning Fascia Metal
1483 Exterior Bay N Rain Gutter Metal 1482 Exterior Bay N Rain Spout Metal
1485 West Dock Dock Concrete 1484 West Dock Dock Edge Metal
1487 West Dock Dock Metal 1486 West Dock Dock Concrete
1489 West Dock Rain Spout Metal 1488 West Dock Handrail Metal
1491 Exterior Bay M Handrail Metal 1490 Exterior Bay M Handrail Metal
1493 Exterior Bay O Rain Spout Metal 1492 Exterior Bay O Power 4" Pole Metal
1495 Exterior Bay O Footing Concrete 1494 Exterior Bay O Rain Spout Metal
1497 Exterior Bay O Handrail Metal 1496 Exterior Bay O Stair Concrete
1499 Exterior Bay P Awning Roof Trim Wood 1498 Exterior Bay P Rain Gutter Metal
1500 Exterior Bay P Awning Roof Trim Wood
1503 Exterior Bay P Handrail Metal 1502 Exterior Bay P Handrail Post Metal
1505 Exterior Bay P Stair Foundation Concrete 1504 Exterior Bay P Awning Post Metal
1501 Exterior Bay P Awning Post Metal
1864 0.96 1883 0.96 1865 0.96 1884 0.89
1866 1.03 POS 1885 1.07
Range: .8 to 1.2 Paint Range: .8 to 1.2 Side Condition Color PbL(mg/cm2) NEG/POS North Good White 0.01 NEG North Good Tan 0.01 NEG South Good White 0.55 NEG South Good White 2.90 POS Center Good Orange 1.42 POS1871 Room 120 Structural Steel Metal
1868 Room 118 Wall Brick 1869 Room 118 Wall Drywall 1870 Room 119 Structural Steel Metal
Per 20 Second Reading
Per 20 Second Reading
XL Number Room/Area Structure Substrate 1867 Room 118 Wall Brick
Pre Calibration PbL (mg/cm²) Calibration
Range Model# Serial # Post
Calibration PbL
(mg/cm²) Calibration
RangeXRF Analyzer XL3t 300 (Serial #96588)
| Title Page |
| Asbestos |
| LBP |
| Readings |
| 2021-02-24T08:54:11-0700 | |
| DEVLIN.CASEY.EDWARD.1543656387 |
File details come from the government source that posted it. Updated .