Asbestos and LBP Report_Bldg 100 Bay N_O_P Modify Exterior_ Install Comm Room.pdf

PDF 347 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER)
Solicitation number
FA820121R0007
Issued by

About this file

This solicitation requests proposals for a Simplified Acquisition of Base Engineering Requirements (SABER) construction services contract at Hill Air Force Base in Utah. The indefinite-delivery, indefinite-quantity contract will cover maintenance, repair, and minor construction work managed by the 75th Civil Engineering Group at Hill AFB and other locations. Task orders will define specific project requirements. The set-aside contract is for 8(a) small businesses. Proposals are due March 9, 2021. A mandatory site visit for the seed project will be held on February 17, 2021. Questions are due by February 23, 2021 with responses on March 2, 2021. The past performance information tool is required for submitting past performance. Points of contact are provided for questions.

View the file

Other files

File Type Posted
Government Responses to Follow up Questions_03162021.xlsx XLSX spreadsheet
Solicitation Amendment - FA8201-21-R-0007-0001.pdf PDF
Attachment 15 - SABER Section L_Revision 1.pdf PDF
Bldg. 100-Landscape Symbols.pdf PDF
Bldg. 100 Existing Steam Pipe Sizes.pdf PDF
Bldg 100 Utilities.png PNG image
Government Responses SABER Question Comment Matrix 31121.xlsx XLSX spreadsheet
Bldg. 100 Utilities (2).JPG JPG image
SABER Site Visit Attendees.xlsx XLSX spreadsheet
Government Responses SABER Question Comment Matrix.xlsx XLSX spreadsheet
HAZMAT Info to Provide to Hill AFB.xlsx XLSX spreadsheet
Attachment 07- Wage Determination - Box Elder County - 1 Jan 2021.pdf PDF
Attachment 03 - Architectural Compatibility Plan (ACP).pdf PDF
Attachment 02 - SABER TEP Matrix.xlsx XLSX spreadsheet
Attachment 08- Wage Determination - Daggett-Duchesne-Rich-Summit Counties - 1 Jan 2021.pdf PDF
Attachment 04 - Base Facility Design Standard 19 OCT 2020.pdf PDF
Attachment 14 - Seed Project Pricing Matrix.xlsx XLSX spreadsheet
SABER Question-Comment Matrix.xlsx XLSX spreadsheet
Attachment 09- Wage Determination - Morgan-Weber Counties - 1 Jan 2021.pdf PDF
Attachment 16 - SABER Section M.pdf PDF
Attachment 05 - Hill AFB Construction and Demolition Waste Diversion Report.pdf PDF
Attachment 15 - SABER Section L.pdf PDF
Attachment 13 - Seed Project SOW - Bldg. 100.pdf PDF
Attachment 01 - SABER Basic SOW.pdf PDF
Attachment 06- Bona Fide Office Requirements.pdf PDF
Solicitation - FA820121R0007.pdf PDF
Attachment 11- Wage Determination - Davis County - 1 Jan 2021.pdf PDF
Attachment 12 - Wage Determination - Salt Lake County - 1 Jan 2021.pdf PDF
Attachment 10- Wage Determination - Sublette County WY - 1 Jan 2021.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SIGNATURE:

PREPARED BY: Casey Devlin (ASB#-6734, PB#-2550)

CONSTRUCT COMM ROOM AND MODIFY EXTERIOR

ORGANIZATION:

REQUESTED:

5906931

100 BAY N

ROBERT GARDNER

THE QUANTITIES WITHIN THIS REPORT ARE ESTIMATES AND SHOULD

NOT BE USED FOR BIDDING PURPOSES

309 SMXG

FACILITY CONSTRUCTION DATE:

DEPARTMENT OF THE AIR FORCE

75TH CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

LEAD BASED PAINT

ASBESTOS

LIMITED INSPECTION REPORT

Utah Certified State Inspector: Raudel Arteaga (ASB#-5863: Expires-18 September 2021, PB#-2244: Expires-6 Nov. 2022)

INSPECTION DATE: 18 February 2021

Reference UDAQ R307-807-6

INSPECTION DATE: 14 January 2020

WORK TASK #:

FACILITY:

REQUESTER:

14 May 2019

(This inspection is valid for three years from the inspection date regardless of Exp. Date of inspector cert. If past this date, a visual or additional assessment will then be required)

ASBESTOS

13% Chrysotile

DEPARTMENT OF THE AIR FORCE

75 CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

The quantities within this report are estimates and are not to be used for bidding purposes.

Table 1

SUMMARY OF ASBESTOS CONTAINING MATERIALS FOUND

MATERIAL TYPE

Canopys on South Side

*RACM

*Category I *Category II

FRIABILITY QUANTITY

50 Linear Feet

Construct Communication Room In Room 147 Bay NStatement of Work:

Category I Non-Friable ACM: Asbestos-containing packings, gaskets, resilient floor coverings, or asphalt roofing products containing more than 1% asbestos as determined by using the method specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM).

LIMITED ASBESTOS INSPECTION REPORT INFORMATION

RACM: Regulated Asbestos-Containing Material (RACM)" means friable ACM, Category I non-friable ACM that has become friable, Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation project operations.

Category II Non-Friable ACM: Any material, excluding Category I non- friable ACM, containing more than 1% asbestos as determined by using the methods specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM) that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.

Paint Exterior of Bay N,O,P, Replace Awniings Remove Replace and Reconfigure South Steam Line Add Parking To South End of Bay P

This inspection was performed in accordance with the Utah Division of Air Quality (DAQ) requirements as found in the Utah Air Quality Rule R307-801-10. This inspection report is required to be on site during all abatement, renovation, and demolition activities. Samples referenced in this report were analyzed by polarized light microscopy (PLM) utilizing method 600R-93-116 by The Science and Engineering Laboratory (AIHA Acc.#-

101572) at Hill Air Force Base, Utah (R307-801-10.8.a-b).

Roof Flashing, Black

*LOCATIONS FOUND

Category INon Friable

Civil Engineering personnel also reviewed previous asbestos inspection reports of suspect asbestos containing materials (ACM) that could potentially be encountered in the proposed area/areas. The information gathered from all current and previous inspections is shown below by homogenous area (R307-801-9-4).

*Per UDAQ definition.

A total of 18 9

Drywall/Joint Compound Wall System 2'x4' Ceiling Tile, Pockmarks/Pinholes, White Thermal System Pipe Insulation, White/Yellow Pit Ground Debris

Results

MATERIAL TYPE

Per Hill AFB requirements, all materials containing any detectable amount of asbestos shall be handled as Asbestos Containing Material (ACM). Table 2 shows the summary of materials containing ≤1% that were identified via "Point Counting". Per EPA/UDAQ

≤1% is not considered to be an asbestos containing material, but special handling/packaging requirements are necessary per OSHA 29CFR 1926.1101 and

29CFR 1910.1001

Sample Location

QUANTITY

N/A

The following is a list of the "Suspect Materials" that were sampled as part of this inspection:

N/A

The following table summarizes the sampling data.

Homogenous Building Material, Description, Location, Quantity.

suspect materials assessed as part of the inspection.

Sample # samples reference the

Locations found: Locations of building materials as described in this report indicate where they were found, but do not necessarily mean that these are the only locations where these materials may be encountered during the project.

*LOCATIONS FOUND

N/A N/A

Table 3.

Window Sill Heavy Paint, Brown

Per EPA requirements, all materials analyzed as containing ≤10% asbestos are point counted utilizing EPA method 600/R-93/116 this information is summarized in Table 2.

Table 2.

ASBESTOS

Thermal System Pipe Fitting Insulation, Grey Roof Decking, Black Roof Flashing, Black Down Spout Heavy Paint Paint, Brown

GM190013 East Center None-Detected GM190014 Southeast None-Detected

2'x4' Ceiling Tile, Pockmarks/Pinholes, White, Room 147, Bay N, 200 Square Feet

GM190015 Northeast None-Detected GM200779 North Center None-Detected GM200780 Southeast None-Detected

Drywall/Joint Compound Wall System, Room 147, Bay N, 100 Square Feet

GM200781 Northeast None-Detected GM200782 North Center None-Detected GM200783 North Center None-Detected

GM210742 South None-Detected Thermal System Pipe Fitting Insulation, Grey, Exterior Pit Bay O, 25 Linear Feet GM210743 South None-Detected

Ground Debris Pit, , Exterior Pit Bay O, 50 Square Feet, GM210744 South None-Detected

Thermal System Pipe Insulation, White Over Yellow, Room 147 Attic and South Exterior Pit

Bay O, 20 Linear Feet GM200784 Center None-Detected

Window Sill Heavy Paint, Brown, Room 139, Bay N

None-DetectedSouth, Bay O AwningGM210747Roof Decking, Black, Awning Bay P, 50 Linear

Roof Flashing, Black, Awning Bay P, 50 Linear Feet, Window Sill Heavy Paint, Brown, Room 139, Bay N

Cell: (801)940-2970 Supervisor: Taylor Brimberry: DSN: (801)586-7094

Asbestos/LBP Shop 75 CES(CEOHA)

Asbestos/LBP Shop Personnel

DSN:(801)777-8006

CONTACT INFORMATION

Table 4.

POTENTIAL FOR ADDITIONAL MATERIALS:

This inspection report only encompasses the areas/materials designated within the scope of work that was provided at the date of inspection (see title page for inspection date). Should the scope of the project be altered in any way or any materials found that are not identified in this report shall require additional assessment. This report cannot be used for any other projects within the building.

Any questions or concerns regarding this inspection report or if any new suspect asbestos containing material (ACM) is encountered, stop work and contact the personnel listed below for further assistance/assessment.

GM210749 Southwest, Bay O None-Detected

GM210750

Northwest, Room 139, Bay O None-Detected

GM210745 South, Bay O Awning 13% Chrysotile GM210746 South, Bay O Awning 11% Chrysotile

GM210748

Southwest, Room 139, Bay N None-Detected

SCOPE OF WORK:

XL Number Substrate Component Color Lead Reading Paint

Condition 1482 Metal Rain Spout Brown 1.52 Poor 1483 Metal Rain Gutter Brown 15.28 Poor 1484 Metal Dock Edge Yellow 10.42 Poor 1487 Metal Dock Brown 24.55 Poor 1489 Metal Rain Spout Brown 15.77 Poor 1493 Metal Rain Spout Brown 1.01 Poor 1494 Metal Rain Spout Brown 5.66 Poor 1497 Metal Handrail Brown 0.85 Poor 1870 Metal Structural Steel White 2.90 Good 1871 Metal Structural Steel Orange 1.42 Good

DEPARTMENT OF THE AIR FORCE

75TH CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

1-Table 1 below, summarizes the painted/coated building components that tested positive for Lead Based Paint/Coating. These components should be segregated or abated prior to renovation or demolition, and a composite TCLP taken of the waste before disposal.

Construct Comm. Room, Modify Exterior

XRF Analyzer Used: XRF Analyzer XL3t 300 (Serial #96588)

5-This inspection report only encompasses the areas/materials designated within the scope of work that was provided at the date of the inspection (see title page for date). This report must be modified should the scope of the project be altered in any way or additional materials not previously identified within this report are encountered. This report may not be used for any other projects within the building.

LIMITED LEAD-BASED PAINT IDENTIFICATION REPORT INFORMATION

Table 1.

2-The condition column is the condition only of the painted/coated component (See final page for all readings/samples).

3-The U.S. Department of Housing and Urban Development defines Lead-based paint as any paint, varnish, stain, or other applied coating that has 1 mg/cm² as measured by an X-ray Fluorescence (XRF) Analyzer or laboratory analysis or 0.5 percent by weight (5,000 µg/g by dry weight) by laboratory analysis, or more of lead.

All other components tested were less than 0.80 mg/cm².

4-Any effort to disturb lead paint can create lead dust. Ensure that appropriate abatement, cleanup, and disposal will be accomplished and that appropriate safety measures are taken IAW 29 CFR 1926.62. If you have any questions concerning this report, contact the Asbestos/LBP Shop: Taylor Brimberry at 586-7094.

1475 0.97 1512 0.89 1476 1.11 1513 0.94

1477 1.06 POS 1514 0.97

Range: .8 to 1.2 Paint Range: .8 to 1.2 Side Condition Color PbL(mg/cm2) NEG/POS West Fair Brown 0.01 NEG West Fair Brown 0.01 NEG West Fair Brown 0.01 NEG West Poor Brown 0.36 NEG West Poor Brown 1.52 POS West Poor Brown 15.28 POS West Poor Yellow 10.42 POS West Poor Brown 0.01 NEG West Poor Brown 0.01 NEG West Poor Brown 24.55 POS West Poor Brown 0.12 NEG West Poor Brown 15.77 POS West Poor Brown 0.62 NEG West Poor Brown 0.56 NEG West Poor Brown 0.24 NEG West Poor Brown 1.01 POS West Poor Brown 5.66 POS South Poor Brown 0.01 NEG South Poor Brown 0.01 NEG South Poor Brown 0.85 POS South Poor Brown 0.45 NEG South Poor Brown 0.17 NEG South Poor White 0.01 NEG South Poor Brown 0.01 NEG South Poor Brown 0.01 NEG South Poor Brown 0.60 NEG South Poor White 0.01 NEG South Poor Brown 0.01 NEG South Poor White 0.4 NEG

Per 20 Second Reading

Calibration Range

Substrate

MetalAwning SoffitExterior Bay P

Exterior Bay N Window Sill Concrete

Post Calibration

PbL (mg/cm²)XRF Analyzer XL3t 300 (Serial #96588)

Per 20 Second Reading

1479 Exterior Bay N Awning Roof Metal 1478 Exterior Bay N Awning Post Metal

Pre Calibration PbL (mg/cm²) Calibration

Range Model# Serial #

XL Number Room/Area Structure

1480 Exterior Bay N Awning Fascia Metal

1483 Exterior Bay N Rain Gutter Metal 1482 Exterior Bay N Rain Spout Metal

1485 West Dock Dock Concrete 1484 West Dock Dock Edge Metal

1487 West Dock Dock Metal 1486 West Dock Dock Concrete

1489 West Dock Rain Spout Metal 1488 West Dock Handrail Metal

1491 Exterior Bay M Handrail Metal 1490 Exterior Bay M Handrail Metal

1493 Exterior Bay O Rain Spout Metal 1492 Exterior Bay O Power 4" Pole Metal

1495 Exterior Bay O Footing Concrete 1494 Exterior Bay O Rain Spout Metal

1497 Exterior Bay O Handrail Metal 1496 Exterior Bay O Stair Concrete

1499 Exterior Bay P Awning Roof Trim Wood 1498 Exterior Bay P Rain Gutter Metal

1500 Exterior Bay P Awning Roof Trim Wood

1503 Exterior Bay P Handrail Metal 1502 Exterior Bay P Handrail Post Metal

1505 Exterior Bay P Stair Foundation Concrete 1504 Exterior Bay P Awning Post Metal

1501 Exterior Bay P Awning Post Metal

1864 0.96 1883 0.96 1865 0.96 1884 0.89

1866 1.03 POS 1885 1.07

Range: .8 to 1.2 Paint Range: .8 to 1.2 Side Condition Color PbL(mg/cm2) NEG/POS North Good White 0.01 NEG North Good Tan 0.01 NEG South Good White 0.55 NEG South Good White 2.90 POS Center Good Orange 1.42 POS1871 Room 120 Structural Steel Metal

1868 Room 118 Wall Brick 1869 Room 118 Wall Drywall 1870 Room 119 Structural Steel Metal

Per 20 Second Reading

Per 20 Second Reading

XL Number Room/Area Structure Substrate 1867 Room 118 Wall Brick

Pre Calibration PbL (mg/cm²) Calibration

Range Model# Serial # Post

Calibration PbL

(mg/cm²) Calibration

RangeXRF Analyzer XL3t 300 (Serial #96588)

Title Page
Asbestos
LBP
Readings
2021-02-24T08:54:11-0700
DEVLIN.CASEY.EDWARD.1543656387

File details come from the government source that posted it. Updated .