This solicitation requests proposals for a Simplified Acquisition of Base Engineering Requirements (SABER) construction services contract at Hill Air Force Base in Utah. The proposed contract is an Indefinite-Delivery, Indefinite-Quantity agreement covering maintenance, repair, and minor construction work on various real property facilities managed by the 75th Civil Engineering Group at Hill Air Force Base and other locations including Little Mountain, Utah, the Utah Test and Training Range, and Wyoming. Task orders will define specific project requirements. The solicitation sets aside the contract for 8(a) small businesses. Proposals are due by March 9, 2021. A mandatory site visit will be held on February 17, 2021, with a required RSVP date of February 8 and a limit of 10 people per company due to COVID-19 restrictions. An attached matrix should be used for submitting questions by February 23, with responses from the Government by March 2. The solicitation includes details on the site visit, past performance evaluation, and points of contact for the contracting officer and specialist.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hill AFB Construction and Demolition Waste Diversion Report
Project Title:
Task Order No.:
Capital Project No.:
Project Manager:
Contractor:
MATERIAL
Reused Recycled Disposed
Recycling Service Provider Used (tons) (tons) (tons)
Asphalt 0.0 0.0 0.0 Cardboard 0.0 0.0 0.0 Concrete 0.0 0.0 0.0 Dry Wall 0.0 0.0 0.0 Green Waste 0.0 0.0 0.0 Lumber/Wood 0.0 0.0 0.0 Metal(s) 0.0 0.0 0.0 Rock/Stone 0.0 0.0 0.0 Other: 0.0 0.0 0.0 Other: 0.0 0.0 0.0
TOTALS 0.0 0.0 0.0
Attach copy of weigh tickets or estimate;
Provide justification for not diverting recyclable materials
Total recycled and reused 0.0 tons Total material disposed 0.0 tons Total solid Waste 0.0 tons Percent recycled or reused [(A/C )x100]:
Contractor Superintendent Signature Date
Construction and Demolition (C&D) debris typically includes concrete, copper piping, copper wire, steel and other metals, wood, ceramic tile, porcelain bathroom fixtures, asphalt, intact building components (doors, windows, cabinets, ceiling fans, etc.), gypsum wallboard, and roofing material. C&D debris DOES NOT include dirt/soil removed from construction sites.
File details come from the government source that posted it. Updated .