Road Reconstruction. Antelope Lake Road. Plumas National Forest. USDA Forest Service.
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 127EAW22R0016
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Taylorsville, California 95983, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation notice seeks proposals for road reconstruction services along Antelope Lake Road within the Plumas National Forest in California. The USDA Forest Service is seeking to award a contract to reconstruct over 5 miles of the roadway including replacing culverts, performing asphalt and base work, installing guardrails and signs, and other related tasks. Proposals will be evaluated based on past experience and technical approach with consideration given to safety and quality control plans. Proposals are due no later than March 8, 2022. All requests for information must be submitted to the contracting officer by February 24, 2022.
This opportunity is set aside for small businesses only. The primary NAICS codes are 237110 and 237310, covering highway, street, and bridge construction. The estimated total value of the contract exceeds $10 million and work must be completed within 365 calendar days of the notice to proceed. The place of performance will be along Antelope Lake Road near Taylorsville, California.
Notice text
2 versions
Update #2 · Latest ·
02/24/2022. Amendment 1 is published. The following are included in this amendment package:
1. Amendment 1 with answers to all RFIs and associated revisions to the RFP document and attachments.
2. RFP replacement pages 5-18, 26, 51
3. Complete RFP document with all revisions/replacement pages included. Replaces original RFP.
4. Attachment 1A. Revised Drawing Sheets.
5. Attachment 2A. Specifications FSSS. Replaces original Attachment 2.
6. Attachment 3A. Culvert Log. Replaces original Attachment 3.
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------
02/02/2022. Request for Proposal and RFP attachments 1-7 published.
USDA Forest Service Request for Proposal.
PROJECT: Road reconstruction, Antelope Lake Road. Plumas National Forest.
IAW FAR 32.204 Disclosure of Magnitude of the Construction Project. More than $10M.
Total Small Business Set Aside
SECTION L.1-3 provides bid/price and technical proposal submission instructions and
requirements.
SECTION L.5 includes Site Visit information.
All Requests for Information [RFIs] shall be submitted to the Contracting Officer, Jeremy Bedner, via email @ jeremy.bedner@usda.gov NLT February 24, 2022, 12P / 1200 PST. Or NLT ten (10) calendar days of the proposal due date if revised via amendment.
Update #1 ·
02/02/2022. Request for Proposal and RFP attachments 1-7 published.
USDA Forest Service Request for Proposal.
PROJECT: Road reconstruction, Antelope Lake Road. Plumas National Forest.
IAW FAR 32.204 Disclosure of Magnitude of the Construction Project. More than $10M.
Total Small Business Set Aside
SECTION L.1-3 provides bid/price and technical proposal submission instructions and
requirements.
SECTION L.5 includes Site Visit information.
All Requests for Information [RFIs] shall be submitted to the Contracting Officer, Jeremy Bedner, via email @ jeremy.bedner@usda.gov NLT February 24, 2022, 12P / 1200 PST. Or NLT ten (10) calendar days of the proposal due date if revised via amendment.
Files
Show all 16
Notice history
| Notice | Type | Posted |
|---|---|---|
| Road Reconstruction. Antelope Lake Road. Plumas National Forest. USDA Forest Service. | Award Notice | |
| This notice | Solicitation | |
| Road Reconstruction. Antelope Lake Road. Plumas National Forest. USDA Forest Service. | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business | |
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business | |
| GAOA Facilities, Barracks Inyo NF | Forest Service | Total Small Business | |
| Access Road Repair National Elk Refuge | — | Total Small Business | |
| Humbolt pacific crest trail bridge replacement | Forest Service | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity