Road Construction Tenmile Road and Bridge Replacement Hume Lake Bridge. Sequoia National Forest. USDA Forest Service.
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 127EAW22R0008
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Hume, California 93628, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks road construction and bridge replacement services on Tenmile Road and Hume Lake Bridge within Sequoia National Forest. The USDA Forest Service requires reconstructing approximately seven miles of roadway, replacing an existing bridge over Hume Lake, and performing associated drainage work. Proposals will be evaluated based on technical qualifications, past performance, and price, with award made to the responsible and technically acceptable offeror with the lowest price. The deadline for any requests for information is March 3, 2022 and final proposals are due by March 18, 2022.
This is a 100% small business set-aside solicitation with a total estimated value between $5-10 million. The project involves road construction work under NAICS codes 237110 and 237310 and bridge replacement under PSC code 871. The work must be completed by November 2023 and will take place in Hume, California. Key details include replacing the existing bridge with new precast concrete deck panels supported by drilled shafts over a period of 365 calendar days.
Notice text
4 versions
Update #4 · Latest ·
03/10/2022. Amendment 2 is published. Answers to all RFIs. The following are included:
1. Amendment 2
2. A2 ATT 1A FSSS Section 571 Prefabricated Bridge
3. RFP Complete Continuation A1-2 REVISED
The proposal due date is extended to 03/18/2022 12p PST. The RFI deadline is not extended.
-----------------------------------------------------------------------------------------------------------------------
03/09/2022. Amendment 1 re-posted with revised answer to RFI no. 13. No other changes.
-----------------------------------------------------------------------------------------------------------------------
03/04/2022. Amendment 1 is published. Provides answers to Requests for Information [RFIs], associated revisions to the RFP document and attachments, and post-site visit information and notes. The following are attached:
1. Amendment 1.
2. Attachment 2 Drawings-Plans Revised Sheets x 2
3. Attachment 2A. Previous Design Sheets for Bridge.
4. Attachment 2B. Geotechnical Report.
5. Post-Site Visit notes and information
-----------------------------------------------------------------------------------------------------------------------
02/04/2022. Request for Proposal and RFP attachments 1-5 published.
USDA Forest Service Request for Proposal.
PROJECT: Road construction Tenmile Road and Bridge replacement Hume Lake Bridge, Sequoia National Forest.
IAW FAR 32.204 Disclosure of Magnitude of the Construction Project. Between $5 and $10M.
Total Small Business Set Aside
SECTION L.1-3 provides bid/proposal submission instructions and requirements.
SECTION L.5 includes Site Visit information
All Requests for Information [RFIs] shall be submitted to the Contracting Officer, Jeremy Bedner, via email @ jeremy.bedner@usda.gov NLT March 3, 2022 by 12P / 1200 PST. OR NLT ten (10) calendar days prior to the proposal due date if revised via amendment. RFIs submitted after this due date may not be considered by the Government for review and answer. Answers to RFIs submitted timely shall be posted as an amendment to the solicitation/RFP announcement on Contract Opportunities.
Update #3 ·
03/08/2022. Amendment 1 re-posted with revised answer to RFI no. 13. No other changes.
-----------------------------------------------------------------------------------------------------------------------
03/04/2022. Amendment 1 is published. Provides answers to Requests for Information [RFIs], associated revisions to the RFP document and attachments, and post-site visit information and notes. The following are attached:
1. Amendment 1.
2. Attachment 2 Drawings-Plans Revised Sheets x 2
3. Attachment 2A. Previous Design Sheets for Bridge.
4. Attachment 2B. Geotechnical Report.
5. Post-Site Visit notes and information
-----------------------------------------------------------------------------------------------------------------------
02/04/2022. Request for Proposal and RFP attachments 1-5 published.
USDA Forest Service Request for Proposal.
PROJECT: Road construction Tenmile Road and Bridge replacement Hume Lake Bridge, Sequoia National Forest.
IAW FAR 32.204 Disclosure of Magnitude of the Construction Project. Between $5 and $10M.
Total Small Business Set Aside
SECTION L.1-3 provides bid/proposal submission instructions and requirements.
SECTION L.5 includes Site Visit information
All Requests for Information [RFIs] shall be submitted to the Contracting Officer, Jeremy Bedner, via email @ jeremy.bedner@usda.gov NLT March 3, 2022 by 12P / 1200 PST. OR NLT ten (10) calendar days prior to the proposal due date if revised via amendment. RFIs submitted after this due date may not be considered by the Government for review and answer. Answers to RFIs submitted timely shall be posted as an amendment to the solicitation/RFP announcement on Contract Opportunities.
Update #2 ·
03/04/2022. Amendment 1 is published. Provides answers to Requests for Information [RFIs], associated revisions to the RFP document and attachments, and post-site visit information and notes. The following are attached:
1. Amendment 1.
2. Attachment 2 Drawings-Plans Revised Sheets x 2
3. Attachment 2A. Previous Design Sheets for Bridge.
4. Attachment 2B. Geotechnical Report.
5. Post-Site Visit notes and information
-----------------------------------------------------------------------------------------------------------------------
02/04/2022. Request for Proposal and RFP attachments 1-5 published.
USDA Forest Service Request for Proposal.
PROJECT: Road construction Tenmile Road and Bridge replacement Hume Lake Bridge, Sequoia National Forest.
IAW FAR 32.204 Disclosure of Magnitude of the Construction Project. Between $5 and $10M.
Total Small Business Set Aside
SECTION L.1-3 provides bid/proposal submission instructions and requirements.
SECTION L.5 includes Site Visit information
All Requests for Information [RFIs] shall be submitted to the Contracting Officer, Jeremy Bedner, via email @ jeremy.bedner@usda.gov NLT March 3, 2022 by 12P / 1200 PST. OR NLT ten (10) calendar days prior to the proposal due date if revised via amendment. RFIs submitted after this due date may not be considered by the Government for review and answer. Answers to RFIs submitted timely shall be posted as an amendment to the solicitation/RFP announcement on Contract Opportunities.
Update #1 ·
02/04/2022. Request for Proposal and RFP attachments 1-5 published.
USDA Forest Service Request for Proposal.
PROJECT: Road construction Tenmile Road and Bridge replacement Hume Lake Bridge, Sequoia National Forest.
IAW FAR 32.204 Disclosure of Magnitude of the Construction Project. Between $5 and $10M.
Total Small Business Set Aside
SECTION L.1-3 provides bid/proposal submission instructions and requirements.
SECTION L.5 includes Site Visit information
All Requests for Information [RFIs] shall be submitted to the Contracting Officer, Jeremy Bedner, via email @ jeremy.bedner@usda.gov NLT March 3, 2022 by 12P / 1200 PST. OR NLT ten (10) calendar days prior to the proposal due date if revised via amendment. RFIs submitted after this due date may not be considered by the Government for review and answer. Answers to RFIs submitted timely shall be posted as an amendment to the solicitation/RFP announcement on Contract Opportunities.
Files
Show all 16
Notice history
| Notice | Type | Posted |
|---|---|---|
| Road Construction Tenmile Road and Bridge Replacement Hume Lake Bridge. Sequoia National Forest. USDA Forest Service. | Award Notice | |
| This notice | Solicitation | |
| Road Construction Tenmile Road and Bridge Replacement Hume Lake Bridge. Sequoia National Forest. USDA Forest Service. | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business | |
| Purchase of 2 or 3 Temporary Road Bridges | Forest Service | No set-aside | |
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity