A1 ATT 2A - Bridge Design Sheets RFI 4 (22R0008).pdf

PDF 6 MB Posted

Attached to
Road Construction Tenmile Road and Bridge Replacement Hume Lake Bridge. Sequoia National Forest. USDA Forest Service.
Solicitation number
127EAW22R0008
Issued by

About this file

This document provides details for a Request for Proposal for road construction and bridge replacement services on the Tenmile Road and Hume Lake Bridge in Sequoia National Forest. The project value is estimated between $5 million and $10 million, with the opportunity set aside for small businesses only. Proposals are due by March 3rd, 2022. All questions regarding the RFP must be submitted to the Contracting Officer by this date as well. Answers to timely submitted questions will be posted as an amendment. The work will be performed for the USDA Forest Service on the Sequoia National Forest.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST SERVICE

ARRA BRIDGES PROJECT

HUME LAKE BRIDGE

11N

TS

FOREST SERVICE

ARRA BRIDGES PROJECT

HUME LAKE BRIDGE

A1 ATT2A 4B R-275 Hume Lake Bridge Design 1946
R275-01_LONG MEADOW CREEK BRIDGE HUME LAKE, SEQUOIA NAT. F
R275-02_LONG MEADOW CREEK BRIDGE HUME LAKE, SEQUOIA NAT. F
R275-03_LONG MEADOW CREEK BRIDGE HUME LAKE, SEQUOIA NAT. F

A1 ATT2A 2010 Hume Lake Bridge Rehab dwgs

File details come from the government source that posted it. Updated .