RF Window Assembly of the Fundamental Power Coupler (FPC) for the EIC's ESR 591 MHz Single-Cell SRF Cavities

Closed Pre-Solicitation Posted

Solicitation number
00898-CAB
Agency
Responses due
Set-aside
Partial Small Business

Opportunity facts

Place of performance
Upton, New York 11973, United States

Notice details come from SAM.gov. Updated .

About this opportunity

Brookhaven Science Associates, LLC (BSA), operating Brookhaven National Laboratory for the U.S. Department of Energy (DOE) Office of Basic Energy Sciences, is seeking expressions of interest for six to eight RF Window Assembly components for the Fundamental Power Coupler (FPC) of the Electron-Ion Collider's (EIC) Electron Storage Ring 591 MHz Single-Cell Superconducting Radio Frequency (SRF) Cavities. This Request for Information (RFI) is designed to survey available industry resources and capabilities for producing these specialized electromagnetic components. The RFI is non-binding and will not result in direct compensation for submitted information. The closing date for responses is June 19, 2025, at 5:00 P.M. EST, with an anticipated Request for Quotation (RFQ) release date of July 16, 2025. Interested vendors can contact Senior Contracts Specialist Cindy Blanchard at cblanchar@bnl.gov or (631) 344-5770 for additional details.

The procurement is partially set aside for small businesses and falls under the NAICS category of Metal Window and Door Manufacturing (332321). The total quantity of RF Window/Antenna units is 12, including 2 units for First Article of Inspection, 2 for production, 2 for Option #1, and 6 for Option #2. While specific pricing details are not yet disclosed, the procurement is part of the DOE's scientific infrastructure development for the Electron-Ion Collider project. The contract closure is expected on August 30, 2025, with a targeted delivery date of September 30, 2026, though these dates are subject to change. The project represents a critical component of advanced particle accelerator technology research and development at Brookhaven National Laboratory.

Notice text

3 versions

Update #3 · Latest ·

Brookhaven Science Associates, LLC (herein known as “BSA”), operator of Brookhaven National Laboratory (BNL) under a Prime Contract with the U.S. Department of Energy (DOE), is seeking expressions of interest from firms regarding twelve (12) RF Window Assembly of the Fundamental Power Coupler (FPC) for the EIC's Electron Storage Ring 591 MHz Single-Cell Cavities.

This RFI is for informational and planning purposes only and is not to be construed as a commitment by the U.S. Government, nor will the U.S. Government pay for information received. The information from this notice will help the Department of Energy (DOE) Office of Basic Energy Sciences (BES) survey available resources.

This Addendum is to update the pricing sheet (Table 2).  Request for Information RFI No. 00898-CAB closes on June 19, 2025 (5:00 P.M. EST).

Update #2 ·

Brookhaven Science Associates, LLC (herein known as “BSA”), operator of Brookhaven National Laboratory (BNL) under a Prime Contract with the U.S. Department of Energy (DOE), is seeking expressions of interest from firms regarding six to eight (6-8) RF Window Assembly of the Fundamental Power Coupler (FPC) for the EIC's Electron Storage Ring 591 MHz Single-Cell Cavities.

This RFI is for informational and planning purposes only and is not to be construed as a commitment by the U.S. Government, nor will the U.S. Government pay for information received. The information from this notice will help the Department of Energy (DOE) Office of Basic Energy Sciences (BES) survey available resources.

This Addendum is to extend the closing date on Request for Information RFI No. 00898-CAB from June 5, 2025 (5:00 P.M. EST) to June 19, 2025 (5:00 P.M. EST).

Added complete set of drawings package labeled, “2400m0000" and provide clarifications.

Update #1 ·

Brookhaven Science Associates, LLC (herein known as “BSA”), operator of Brookhaven National Laboratory (BNL) under a Prime Contract with the U.S. Department of Energy (DOE), is seeking expressions of interest from firms regarding six to eight (6-8) RF Window Assembly of the Fundamental Power Coupler (FPC) for the EIC's Electron Storage Ring 591 MHz Single-Cell Cavities.

This RFI is for informational and planning purposes only and is not to be construed as a commitment by the U.S. Government, nor will the U.S. Government pay for information received. The information from this notice will help the Department of Energy (DOE) Office of Basic Energy Sciences (BES) survey available resources.

Files

File Type Posted
RFI-00898-CAB Table 2 (updated 6.05.2025).pdf PDF
RFI 00898-CAB Addendum No 2.pdf PDF
2400m0000_drw.zip ZIP file
RFI 00898-CAB Addendum No 1 5.23.2025.pdf PDF
RFI 00898-CAB Documents.zip ZIP file

Similar open opportunities

Opportunity Agency Set-aside Responses due
Prototype Stripline Kickers Upton, New York, United States · NAICS 335999 Office of Science No set-aside
A-E Services for Electron Injector Complex Upton, New York 11973, United States · NAICS 541330 Office of Science No set-aside
HSR HF Dipole and Quad SC Magnet PS and Quench Upton, New York, United States · NAICS 335999 Office of Science No set-aside
Optical Modulator (No Substitutions) Upton, New York 11973, United States · NAICS 334516 Office of Science No set-aside
Cavity Batavia, Illinois 60510, United States · NAICS 332710 Fermi National Accelerator Laboratory No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors