Replace Building 34 RTU - Stratton Air National Guard Base
Closed Solicitation Posted
- Solicitation number
- W50S8J26QA016
- Agency
-
New York National Guard
Army National Guard, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- Schenectady, New York 12302, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The New York Army National Guard seeks replacement of a rooftop thermal unit (RTU) at Building 34, Stratton Air National Guard Base in Schenectady, New York, with proposals due June 12 at 12:00 PM. This is a 100% small business set-aside solicitation using sealed bid, firm fixed-price procedures.
A mandatory site visit is scheduled for June 8, 2026 at 10:00 AM at Building 25, Stratton ANGB. Quotes must be submitted via email to 109.aw.fal.msc.contracting@us.af.mil. The replacement unit provides air conditioning only. The contractor may select either Johnson Controls or Energy Management Technologies LLC as the controls integration partner and must integrate with the existing Johnson Controls Metasys system. The contractor is responsible for landing controls integration; relays are already in place. A curb adapter will be used on the existing roof curb rather than full curb replacement. No crane permit is required by Airfield Management, but the contractor must notify Civil Engineering of scheduled dates and operational hours and ensure FAA compliance for crane flagging and marking.
Performance begins upon RTU equipment delivery to site and must be completed within 14 calendar days. The contractor shall begin mobilization within 5 calendar days of receiving notice to proceed. The Government will accommodate standard RTU procurement lead times of 8–12 weeks or longer and will coordinate the formal NTP to align with equipment delivery. Prevailing wage rates apply under General Decision Number NY20260002 Modification Number 2, dated May 18, 2026. Payment bonds may be required under FAR 28.102-1(b)(1)(i); offer guarantees are not required. Offers providing less than 60 calendar days for government acceptance will be rejected. Evaluation considers best value, weighing RTU model/specifications meeting SOW requirements and lead time, with the government willing to pay more for shorter lead times. NAICS 238220; PSC N045. Inspection and acceptance occur throughout and upon completion at Stratton ANGB.
Notice text
2 versions
Update #2 · Latest ·
The purpose of this update is to answer questions which were raised in response to the site visit. See attached "Question and Answer 1" for complete details.
A site visit will be held on Monday June 8, 2026 at 10:00AM.
Submit quotes via email to 109.aw.fal.msc.contracting@us.af.mil
See attached solicitation documents for complete details.
Update #1 ·
A site visit will be held on Monday June 8, 2026 at 10:00AM.
Submit quotes via email to 109.aw.fal.msc.contracting@us.af.mil
See attached solicitation documents for complete details.
Files
| File | Type | Posted |
|---|---|---|
| Site Visit Sign In Sheet.pdf | ||
| Question and Answer 1.pdf | ||
| Solicitation - W50S8J26QA016.pdf | ||
| SOW VBDZ26109 Replace Bldg 34 RTU.docx | DOCX document | |
| Wage Determination.txt | TXT text file |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Cooling Tower, Roofing, and Structural Construction | Bureau of Engraving and Printing | Total Small Business | |
| HVAC repair JV resource_jordan valley | Oregon-Washington Region | Total Small Business | |
| Renovate Suite H8, Building 3 | Air Force Research Laboratory | Total Small Business | |
| E21 prca HVAC replacement | Bureau of Reclamation | Total Small Business | |
| Gwmp - arho bunker HVAC | Intermountain Region | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners