Rehabilitation of the Vado East Levee

Award Notice Posted

Solicitation number
IBM15R0002
Agency
Awarded
to Meridian Engineering Co
Set-aside
No set-aside

Opportunity facts

Contract number
IBM15C0007 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Dona Ana County, New Mexico, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

THIS IS THE AWARD NOTICE.

Update #4 ·

Amendment A002 is now posted.

Acknowledgement of this Amendment A002 is required.

Update #3 ·

Amendment A001 is now posted.

Acknowledgement of this Amendment A001 is required.

Update #2 ·

THIS IS THE SOLICITATION NOTICE. THE USIBWC IS REQUESTING PROPOSAL AT THIS TIME.

Please refer to the Solicitation package.

General Description of the Work
The Work for this project generally consists of rehabilitation of an approximately 1.06 mile segment (Vado East Levee) of the Upper Rio Grande levee system in order to meet the Federal Emergency Management Agency's (FEMA) Levee Certification Requirements of National Flood Insurance Program (NFIP) regulations (44 CFR 65.10). The approximate limits of the project are as follows (using New Mexico State Plane Coordinate Grid System, Central Zone North, NAD83, feet):
  Begin Project: N 401,814.33, E 1,513,454.49
  End Project: N 396,754.80, E 1,514,049.00

Major Construction Tasks
1. Preparation of right of way (clearing and grubbing) 
2. Construction of new levee (inclusive of toe drain)
3. Improvement/rehabilitation of existing levee
4. Excavation of channel within the Rio Grande
5. Construction of proposed flex base (aggregate gravel roadway surface)
6. Construction of proposed levee ramps
7. Install seeding for erosion control on the side slopes of the levee and all areas disturbed by construction
8. Construction of 36 inch RCP and inlet/outlet structures
9. Replacement of existing 24 inch RCP with a new 3 feet W x 2 feet H RCB (reinforced box culvert)
10. Removal of existing Del Rio Drain CMP culvert and construction of Del Rio Drain realignment (8 foot x 8 foot RCB)
11. Installation of new sluice gate assemblies to levee penetrations
12. Construction of the project will require temporary diversion of both the Rio Grande and the Del Rio Drain. It is anticipated that this will require the installation of temporary bypass pipes/channels and small temporary cofferdams for the Del Rio Drain and larger temporary diversion berms for the Rio Grande
13. Work within the Burlington Northern Santa Fe Railway Company right-of-way

The magnitude of the project is estimated between $5,000,000 and $10,000,000.

Performance Period
The Rio Grande shall be constructed during the non-irrigation season, which usually runs from October 1 to February 28. However, due to current hydrologic conditions, the non-irrigation season may extend beyond this period. The contractor shall take into account the accommodation and diversion of Rio Grande and Del Rio Drain flows during the performance period. 

All work shall be completed within four hundred fifty (450) calendar days after the Notice to Proceed. All flood control levee and structure work, excluding revegetation, shall be completed within two hundred seventy (270) calendar days. Reseeding and establishment of vegetation shall be completed within one hundred eighty (180) calendar days of completion of all other work. The time stated for completion shall include final cleanup of the premises.

Coordination with BNSF
USIBWC has applied for a Temporary Occupancy Permit from Burlington Northern Santa Fe Railway Company (BNSF). This construction project shall require the contractor to coordinate with BNSF in order for the Contractor to temporarily use BNSF Right-of -Way (ROW) for construction equipment access or haul roads. In addition the USIBWC and the BNSF Railway Company shall require the Contractor to comply with specified conditions and obligations prior to using BNSF ROW.

The Contractor shall comply with the insurance requirements and other conditions (e.g., flagging of train traffic, safety training, etc.) set forth by BNSF. Any costs and fees that may be incurred by the Contractor to meet the requirements of the BNSF shall be considered subsidiary to this project, and shall be paid in full by the Contractor.

Update #1 ·

General Description of the Work
The Work for this project generally consists of rehabilitation of an approximately 1.06 mile segment (Vado East Levee) of the Upper Rio Grande levee system in order to meet the Federal Emergency Management Agency's (FEMA) Levee Certification Requirements of National Flood Insurance Program (NFIP) regulations (44 CFR 65.10). The approximate limits of the project are as follows (using New Mexico State Plane Coordinate Grid System, Central Zone North, NAD83, feet):
  Begin Project: N 401,814.33, E 1,513,454.49
  End Project: N 396,754.80, E 1,514,049.00

Major Construction Tasks
1. Preparation of right of way (clearing and grubbing) 
2. Construction of new levee (inclusive of toe drain)
3. Improvement/rehabilitation of existing levee
4. Excavation of channel within the Rio Grande
5. Construction of proposed flex base (aggregate gravel roadway surface)
6. Construction of proposed levee ramps
7. Install seeding for erosion control on the side slopes of the levee and all areas disturbed by construction
8. Construction of 36 inch RCP and inlet/outlet structures
9. Replacement of existing 24 inch RCP with a new 3 feet W x 2 feet H RCB (reinforced box culvert)
10. Removal of existing Del Rio Drain CMP culvert and construction of Del Rio Drain realignment (8 foot x 8 foot RCB)
11. Installation of new sluice gate assemblies to levee penetrations
12. Construction of the project will require temporary diversion of both the Rio Grande and the Del Rio Drain. It is anticipated that this will require the installation of temporary bypass pipes/channels and small temporary cofferdams for the Del Rio Drain and larger temporary diversion berms for the Rio Grande
13. Work within the Burlington Northern Santa Fe Railway Company right-of-way

The magnitude of the project is estimated between $5,000,000 and $10,000,000.

Performance Period
The Rio Grande shall be constructed during the non-irrigation season, which usually runs from October 1 to February 28. However, due to current hydrologic conditions, the non-irrigation season may extend beyond this period. The contractor shall take into account the accommodation and diversion of Rio Grande and Del Rio Drain flows during the performance period. 

All work shall be completed within four hundred fifty (450) calendar days after the Notice to Proceed. All flood control levee and structure work, excluding revegetation, shall be completed within two hundred seventy (270) calendar days. Reseeding and establishment of vegetation shall be completed within one hundred eighty (180) calendar days of completion of all other work. The time stated for completion shall include final cleanup of the premises.

Coordination with BNSF
USIBWC has applied for a Temporary Occupancy Permit from Burlington Northern Santa Fe Railway Company (BNSF). This construction project shall require the contractor to coordinate with BNSF in order for the Contractor to temporarily use BNSF Right-of -Way (ROW) for construction equipment access or haul roads. In addition the USIBWC and the BNSF Railway Company shall require the Contractor to comply with specified conditions and obligations prior to using BNSF ROW.

The Contractor shall comply with the insurance requirements and other conditions (e.g., flagging of train traffic, safety training, etc.) set forth by BNSF. Any costs and fees that may be incurred by the Contractor to meet the requirements of the BNSF shall be considered subsidiary to this project, and shall be paid in full by the Contractor.

Other
The solicitation, plans, and specifications are expected to be posted on or about June 1, 2015 (this is a target date which may slip or change; if the solicitation is not posted on Federal Business Opportunities by June 1, 2015 that is because the solicitation is not available for posting). The solicitation will be available for a minimum of thirty (30) calendar days.

This is a Presolicitation Notice. The solicitation will include information on how to obtain the plans and specifications. All responsible sources may submit a proposal to be considered by the Agency.

This is NOT a request for proposal. Please do not submit a proposal in response to this Presolicitation Notice.

Files

Show all 21