SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IBM15R0002 SEALED BID (IFB)

X NEGOTIATED (RFP)

2. TYPE OF SOLICITATION 3. DATE ISSUED

06/11/2015

RATING

IMPORTANT -The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

CODE IBWC_

International Boundary and Water Commission (IBWC)

USIBWC - ACQUISITIONS DIV

4171 NORTH MESA, STE. C100

EL PASO, TX 79902-1441

7. ISSUED BY

International Boundary and Water Commission (IBWC)

USIBWC - ACQUISITIONS DIV

4171 NORTH MESA, STE. C100

EL PASO, TX 79902-1441

8. ADDRESS OFFER TO

9. FOR INFORMATION EMAIL: a. NAME

Laura A. Baker

b. TELEPHONE NO. (Include area code)(NO COLLECT CALLS)

915-832-4119

c. EMAIL laura.baker@ibwc.gov

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

The Contractor shall furnish all labor, material, and equipment necessary to complete the rehabilitation of the Vado East Levee in Dona Ana County, New Mexico.

This is a 100% SMALL BUSINESS SET ASIDE.

This is a FIXED PRICE CONTRACT WITH VARIATION IN ESTIMATED QUANTITIES (See CLINs for those with a

VARIATION IN ESTIMATED QUANTITIES).

In accordance with FAR Provision 52.236-27 Alt 1, Site Visit (Construction) (Feb 1995) - Alternate 1 - (Feb 1995), a site visit shall be held on Monday, June 22, 2015 at the USIBWC Headquarters, 4171 N. Mesa St., STE C-100, El Paso, TX 79902-1441 at 9:00 AM MST.

The estimated magnitude of this project is between $5,000,000 and $10,000,000.

The applicable NAICS CODE is 237990 - Other Heavy and Civil Engineering Construction.

Offerors shall submit their PROPOSALS in accordance with the information contained in this REQUEST FOR PROPOSAL. Reference Subsection L.02 for PROPOSAL submission.

11. The Contractor shall begin performance within ___10___ calendar days and complete it within ___450___ calendar days after receiving award, X notice to proceed. This performance period is X mandatory negotiable. ( (See _Section F_.)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b).

X YES NO

12b. CALENDAR DAYS

Sealed offers in original and __3__ copies to perform the work required are due at the place specified in item 8 by __13:00:00__ (hour) local time __07/13/2015 __ (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

a.

b. An offer guarantee X is, is not required.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.c.

d. Offers providing less than __90__ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

13. ADDITIONAL SOLICITATION REQUIREMENTS:

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA - FAR (48 CFR) 53.236-1(e)

IBM15R0002

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CONTACT: DUNS:

CODE FACILITY CODE

The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

17.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified) 27

ITEM

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY IBWC_

International Boundary and Water Commission (IBWC)

USIBWC - ACQUISITIONS DIV

4171 NORTH MESA, STE. C100

EL PASO, TX 79902-1441

International Boundary and Water Commission (IBWC)

USIBWC - FINANCIAL SERVICES DIV

4171 NORTH MESA, STE. C100

EL PASO, TX 79902-1441

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return __________ copies to issuing office) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No futher contractual document is necessary.

30a.NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) Laura A. Baker

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 4-85) BACK

Table of Contents

Section Description Page Number

B Supplies or Services and Prices/Costs 52.211-18 Variation in Estimated Quantity (Apr 1984) B.01 Application of Variation in Estimated Quantities

C Descriptions/Specifications/Statement of Work C.01 Specifications and Plans

D Packaging and Marking D.01 Payment of Postage and Fees D.02 Marking

E Inspection and Acceptance 52.246-12 Inspection of Construction (Aug 1996)

F Deliveries or Performance 52.211-12 Liquidated Damages - Construction (Sept 2000) 52.211-13 Time Extensions (Sept 2000) 52.242-14 Suspension of Work (Apr 1984) 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)

G Contract Administration Data G.01 Contracting Officer G.02 Designation of Contracting Officer G.03 Contracting Officer's Representative USIBWC G.04 Invoices

H Special Contract Requirements H.01 Performance and Payment Bonds H.02 Compensation and Liability Insurance H.03 Builders Risk Insurance H.04 Brand Name or Equal H.05 Technical Data Submittal Requirements H.06 Accident Prevention and Pre-Planning H.07 Construction Program H.08 Construction Safety Standards H.09 Equipment Ownership and Operating Expense Schedule H.10 Cultural Resources H.11 Contract Work Schedule H.12 Utility and Telephone Services H.13 Administration of Default (Fixed-Price Construction) H.14 Time Extensions for Unusually Severe Weather H.15 Change Orders and Contract Modifications: Limitations on Markups H.16 Revegetation Period H.17 Damage from the Elements - Diversion of Water H.18 Contract Close Out Procedures

I Contract Clauses 52.202-1 Definitions (Nov 2013) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-7 Anti-Kickback Procedures (May 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) 52.203-12 Limitation On Payments To Influence Certain Federal Transactions (Oct 2010) 52.203-13 Contractor Code of Business Ethics and Conduct (Apr 2010) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011) 52.204-7 System for Award Management (Jul 2013) 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jul 2013) 52.204-13 System for Award Management Maintenance (JUL 2013) 52.209-6 Protecting The Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment (Aug 2013) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) 52.210-1 Market Research (Apr 2011)

52.219-8 Utilization of Small Business Concerns (Oct 2014) 52.219-14 Limitations on Subcontracting (Nov 2011) 52.219-28 Post-Award Small Business Program Rerepresentation (Jul 2013) 52.222-1 Notice to the Government of Labor Disputes (Feb 1997) 52.222-3 Convict Labor (June 2003) 52.222-4 Contract Work Hours and Safety Standards - Overtime Compensation (May 2014) 52.222-6 Construction Wage Rate Requirements (May 2014) 52.222-7 Withholding of Funds (May 2014) 52.222-8 Payrolls and Basic Records (May 2014) 52.222-9 Apprentices and Trainees (July 2005) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) 52.222-11 Subcontracts (Labor Standards) (May 2014) 52.222-12 Contract Termination - Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) 52.222-15 Certification of Eligibility (May 2014) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.222-26 Equal Opportunity (Apr 2015) 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) 52.222-35 Equal Opportunity for Veterans (Jul 2014) 52.222-36 Equal Opportunity for Workers with Disabilities (Jul 2014) 52.222-37 Employment Reports on Veterans (Jul 2014) 52.222-39 Notification of Employee Rights Concerning Payment of Union Dues or Fees (Dec 2004) 24 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) 52.222-50 Combating Trafficking in Persons (Mar 2015) 52.222-54 Employment Eligibility Verification (Aug 2013) 52.222-55 Minimum Wages Under Executive Order 13658 (Dec 2014) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (Sep 2013) 52.223-5 Alt II Pollution Prevention and Right-to-Know Information (May 2011) - Alternate II (May 2011) 52.223-6 Drug Free Workplace (May 2001) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (May 2008) 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving (Aug 2011) 52.225-11 Alt I Buy American - Construction Materials Under Trade Agreements (May 2014) - Alternate I (May 2014) 52.225-13 Restrictions on Certain Foreign Purchases (June 2008) 52.227-1 Authorization and Consent (Dec 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Dec 2007) 52.227-4 Patent Indemnity - Construction Contracts (Dec 2007) 52.227-17 Rights in Data - Special Works (Dec 2007) 52.228-2 Additional Bond Security (Oct 1997) 52.228-5 Insurance - Work on a Government Installation (Jan 1997) 52.228-11 Pledges of Assets (Jan 2012) 52.228-12 Prospective Subcontractor Requests for Bonds (May 2014) 52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.228-15 Performance and Payment Bonds - Construction (Oct 2010) 52.229-3 Federal, State and Local Taxes (Feb 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014) 52.232-16 Alt I Progress Payments (Apr 2012) - Alternate I (Mar 2000) 52.232-17 Interest (May 2014) 52.232-23 Assignment of Claims (May 2014) 52.232-27 Prompt Payment for Construction Contracts (May 2014) 52.232-33 Payment by Electronic Funds Transfer - System for Award Management (Jul 2013) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) 52.233-1 Alt I Disputes (May 2014) - Alternate I (Dec 1991) 52.233-3 Protest after Award (Aug 1996) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.236-2 Differing Site Conditions (Apr 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) 52.236-5 Material and Workmanship (Apr 1984) 52.236-6 Superintendence by the Contractor (Apr 1984) 52.236-7 Permits and Responsibilities (Nov 1991) 52.236-8 Other Contracts (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) 52.236-10 Operations and Storage Areas (Apr 1984) 52.236-11 Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-13 Accident Prevention (Nov 1991) 52.236-14 Availability and Use of Utility Services (Apr 1984) 52.236-15 Schedules for Construction Contracts (Apr 1984) 52.236-16 Alt I Quantity Surveys (Apr 1984) - Alternate I (Apr 1984) 52.236-17 Layout of Work (Apr 1984) 52.236-21 Alt II Specifications and Drawings for Construction (Feb 1997) - Alternate II (Apr 1984) .25 52.236-26 Preconstruction Conference (Feb 1995) 52.242-13 Bankruptcy (July 1995) 52.243-4 Changes (June 2007) 52.244-6 Subcontracts for Commercial Items (Apr 2015) 52.246-21 Warranty of Construction (Mar 1994) 52.248-3 Value Engineering - Construction (Oct 2010) 52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price) (Apr 2012) - Alternate I (Sept 1996) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.253-1 Computer Generated Forms (Jan 1991) 52.203-14 Display of Hotline Poster(s) (Dec 2007) 52.236-4 Physical Data (Apr 1984) 52.252-2 Clauses Incorporated by Reference (Feb 1998)

J List of Attachments J.16 Amendments (if applicable) J.17 Order of Attachments

K Representations, Certifications, and Other Statements of Offerors or Respondents 52.236-28 Preparation of Proposals - Construction (Oct 1997) 52.204-8 Annual Representations and Certifications (Jul 2013) 52.209-7 Information Regarding Responsibility Matters (Jul 2013)

L Instructions, Conditions, and Notices to Offerors and Respondents 52.214-34 Submission of Offers in the English Language (Apr 1991) 52.214-35 Submission of Offers in U.S. Currency (Apr 1991) 52.225-12 Alt II Notice of Buy American Requirement - Construction Materials Under Trade Agreements (May 2014) - Alternate II (June 2009) 52.232-13 Notice Of Progress Payments (Apr 1984) 52.236-27 Alt I Site Visit (Construction) (Feb 1995) - Alternate I (Feb 1995) 52.211-1 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29 (Aug 1998) 52.211-3 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions (Jun 1988) 52.216-1 Type of Contract (Apr 1984) 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999) 52.233-2 Service of Protest (Sep 2006) 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) L.01 Pre-Proposal Conference and Site Visit L.02 Proposal Submission L.03 Proposal/Bid Guarantee L.04 Contractor's Contract Administrator L.05 Availability of Forms

M Evaluation Factors for Award M.01 Evaluation Factors for Award

001 Mobilization Demobilization 1.00 LS Contract Clause 52.111-18 does not apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

002 Preparing Right of Way 1.00 LS Contract Clause 52.111-18 does not apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

003 Vegetation for Erosion Control 1.00 LS Contract Clause 52.111-18 does not apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

004 Excavation (Levee) 33,500.00 CY The quantities are estimated. Contract Clause 52.111-18 does apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

005 Excavation (Channel) 131,650.00 CY The quantities are estimated. Contract Clause 52.111-18 does apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

006 Excavation (Toe) 10,000.00 CY The quantities are estimated. Contract Clause 52.111-18 does apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

007 Fill (Impervious Material) 80,000.00 CY The quantities are estimated. Contract Clause 52.111-18 does apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

008 Fill (Pervious Material) 28,500.00 CY The quantities are estimated. Contract Clause 52.111-18 does apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

009 Fill (General) 7,600.00 CY The quantities are estimated. Contract Clause 52.111-18 does apply to this CLIN.

IBM15R0002

Line Item Summary

Solicitation Number:

IBM15R0002

Contract Number: Title: Rehabilitation of the Vado East Levee

Date of Solicitation:

06/09/2015

Line Item No. Description Quantity Unit Unit Price Total Cost

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

010 Topsoil 4,709.00 CY The quantities are estimated. Contract Clause 52.111-18 does apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

011 Diversion, Control & Removal of Water 1.00 LS Contract Clause 52.111-18 does not apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

012 Riprap 9,396.00 CY The quantities are estimated. Contract Clause 52.111-18 does apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

013 Toe Drain 2,151.00 LF The quantities are estimated. Contract Clause 52.111-18 does apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

014 Flex Base 9,896.00 SY The quantities are estimated. Contract Clause 52.111-18 does apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

015 3' x 2' RCB Culvert including Inlet & outlet structures 1.00 LS Contract Clause 52.111-18 does not apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

016 8' x 8' RCB Culvert including Inlet & outlet structures 1.00 LS Contract Clause 52.111-18 does not apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

017 36" RCP Culvert including Inlet & outlet structures 1.00 LS Contract Clause 52.111-18 does not apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

018 Sluice Gate (36" diameter) 1.00 EA Contract Clause 52.111-18 does not apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

019 Sluice Gate (3' x 2') 1.00 EA Contract Clause 52.111-18 does not apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

020 Sluice Gate (8' x 8') 1.00 EA Contract Clause 52.111-18 does not apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

021 New Heavy Duty Vehicular Gate 1.00 EA Contract Clause 52.111-18 does not apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

022 Traffic Barriers (Guardrails) 180.00 LF Contract Clause 52.111-18 does not apply to this CLIN.

Doc Ref No: 5309S4201007 Delivery Date FOB:

Destination

****TOTAL AMOUNT: __________________________

Clause Title 52.211-18 Variation in Estimated Quantity (Apr 1984)

B.01 Application of Variation in Estimated Quantities

Contract Clause 52.211-18 shall only apply to CLINs 004, 005, 006, 007, 008, 009, 010, 012, 013, and 014.

IBM15R0002

Line Item Summary

Solicitation Number:

IBM15R0002

Contract Number: Title: Rehabilitation of the Vado East Levee

Date of Solicitation:

06/09/2015

Line Item No. Description Quantity Unit Unit Price Total Cost

Section C- Descriptions/Specifications/Statement of Work

C.01 Specifications and Plans

Technical specifications, drawings, and plans for this solicitation, IBM15R0002, are referenced in Section J and included as Attachments to this document.

Section D- Packaging and Marking

D.01 Payment of Postage and Fees

All postage and fees related to submitting information, including forms, reports, etc., to the Contracting Officer (CO) and the Con-tracting Officer’s Representative (COR) shall be paid by the Contractor.

D.02 Marking

All information submitted to the CO or the COR shall be clearly marked to show the Name of the Contractor and the Contract Num-ber.

Section E- Inspection and Acceptance

52.246-12 Inspection of Construction (Aug 1996)

Section F- Deliveries or Performance

52.211-12 Liquidated Damages - Construction (Sept 2000)

$1,628.75 for the Construction Phase and $150.57 for the Revegetation Phase;

52.211-13 Time Extensions (Sept 2000)

52.242-14 Suspension of Work (Apr 1984)

52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than four hundred fifty (450) calendar days. All construction work, excluding revegetation, shall be completed within two hundred seventy

(270) days. Revegetating the site shall be completed within one hundred eighty (180) calendar days of completion of all other work.* The time stated for completion shall include final cleanup of the premises.

(End of clause)

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calen-dar date.

Section G- Contract Administration Data

G.01 Contracting Officer

“Contracting Officer” (CO) means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The scope of the CO’s authority is defined by FAR 1.602-1, the CO’s Warrant, and other applicable fed-eral laws. The term includes certain authorized representation of the CO within the limits of their authority as delegated by the CO.

G.02 Designation of Contracting Officer

The CO for this contract is:

Name: Laura A. Baker Address: International Boundary & Water Commission, United States & Mexico (USIBWC) 4171 N Mesa, Suite C-100 El Paso, TX 79902

Telephone: 915-832-4119 Fax: 915-493-2489 Email: Laura.Baker@IBWC.GOV

Any change to the CO will be made in writing.

G.03 Contracting Officer's Representative USIBWC

The Contracting Officer shall designate a technical representative to act for the Contracting Officer during the contract period. The Contracting Officer’s Representative (COR) will act for the Contracting Officer only in technical matters and will not be authorized to commit the Government on any contract terms, conditions, or changes in unit price, total price, quantity, or delivery schedule. Any changes to the contract in unit price, total contract price, quantity, quality, or delivery schedule will be made only by the Contracting Officer by executed modification to the contract.

The Contracting Officer’s Representative will be appointed in writing after contract award.

G.04 Invoices

All invoices submitted electronically to the USIBWC's Finance and Accounting Division shall be submitted to the following email ad-dress: invoices@ibwc.gov. The CO and the COR shall be copied on the submission email.

Section H- Special Contract Requirements

H.01 Performance and Payment Bonds

(a) For contracts that exceed $150,000, the Contractor shall, within ten (10) calendar days after award of contract, furnish to the Government bonds as follows:

(1) SF 25, Performance bond. Performance bond with a surety or sureties approved by the Contracting Officer, securing per-formance and fulfillment of the Contractor's obligations under this contract, with a penal amount of not less than 100 percent of the price of the contract at the time of award.

(2) SF 25A, Payment bond. Payment bond with a surety or sureties approved by the Contracting Officer, assuring payment as required by law to all persons supplying labor or materials in the prosecution of the work provided for in the contract with a penal amount of not less than 100 percent of the price of the contract at the time of award.

(b) Costs. All costs of furnishing performance and payment bonds shall be included in the total contract price in the schedule.

(c) Requirements for execution of surety bonds. Each surety company bond (performance or payment), that purports to have been executed by an agent or attorney in fact for the corporate surety, is required to have submitted with it a power of attorney to the signat-ory agency or attorney in fact, and (1) be executed by the corporate surety upon a date reasonably proximate to the date of the bond, or

(2) the power of attorney shall be accompanied by a certification of the surety to the effect that the power of attorney was in full force and effect upon a date reasonable proximate to the date of the bond.

(d) Individual Sureties.

(1) If individual surety bonds are furnished for payment and performance bonds, the individual sureties must submit with their bonds proof of ownership and value of the assets which they claim in their net worth. The Government's preferred method of proof is to have a statement of net worth prepared by a certified public accountant in accordance with generally accepted accounting prin-ciples. The statement of net worth on the SF 28, Affidavit of Individual Surety is not in itself sufficient and will not be accepted ab-sent of additional proof of value and ownership.

(2) Proposers are also cautioned that individual sureties must provide complete and detailed information in block 10 of the SF 28 concerning other contracts on which they have provided bonds. This information shall include contract number, contract location, amount and type of bond, email address, and telephone number of the involved contracting officer.

(3) Failure to provide the proof and information requested above will cause delays to the start of construction for which the con-tractor must bear the responsibility, and may result in termination of contract for failure to provide adequate bonds.

H.02 Compensation and Liability Insurance

The Contractor shall within ten (10) calendar days after award of contract provide and maintain minimum insurance as follows:

(a) General Liability Insurance for bodily injury and property damage with minimum limits $500,000 each occurrence with an ag-gregate of $1,000,000.

(b) Automobile Liability for bodily injury and property damage with minimum of $250,000 for injury to or death of any one (1) person, $500,000 each accident or occurrence for bodily injury, and $100,000 for each accident or occurrence for property damage li-ability.

(c) Worker's Compensation Insurance for all labor employed on the project who may come within the protection of workers' compensation laws and Employers General Liability with minimum limits of $100,000 each accident, bodily injury by disease $100,000 each employee, $500,000 aggregate.

In every case the insurance coverage shall amount to at least the limits stated above. However, where the Financial Responsibil-ity Compulsory Insurance Law of the State in which the project is located requires higher limits, the Automobile Liability Insurance Policy shall provide coverage of at least those limits required by State law.

The insurance obtained by the Contractor must (1) be effective for the term of the contract, (2) must name both the United States of America by and through the United States Section of the International Boundary and Water Commission, United States and Mexico

(USIBWC), as additionally insured, and (3) cite the contract number. The requirement for naming the United States of America as an additional insured does not apply to Worker's Compensation Insurance.

Before commencing work under this contract, the Contractor shall certify to the Contracting Officer in writing that the required in-surance has been obtained.

The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change ad-versely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe or (2) until 30 calendar days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer. The Contractor's written certification shall be accompanied by either a Certificate issued by the insurer or photocopies of the insurance policies which reflect that the cancellation/change provisions of this contract have been met.

The Contractor shall insert the substance of this clause including this paragraph in subparagraphs under this contract and shall require subcontractors to provide and maintain the same limits.

At least 5 days prior to each such subcontractor's personnel commencing work on this project, the Contractor shall furnish (or ensure that there has been furnished) to the Contracting Officer a current Certificate of Insurance meeting the requirements as stated above.

H.03 Builders Risk Insurance

(a) The Contractor is responsible for losses suffered prior to Government acceptance of the work. Therefore, the Contractor is re-sponsible for protection of the work and repair of damages. For the protection of the Contractor and the Government, the Contractor is required to obtain Builder's Risk Insurance with the maximum level of coverage available in the project locality and no less than 100% of the contract price.

(b) The Contractor shall not commence work under this contract until he has obtained all the insurance required and such insurance has been approved by the Contracting Officer, nor shall the Contractor allow any subcontractor to commence work on his subcontract until the insurance required of the subcontractor has been so obtained and approved.

(c) The Contractor shall procure within ten (10) calendar days after award of contract, and maintain during the life of this contract, Builder's Risk Insurance based on 100 percent (100%) of the completed value of the insurable portion of the project.

(d) The Contractor shall furnish the Contracting Officer with certificates showing the type, amount, class of operations covered, ef-fective dates and dates of expiration of policies. Such certificates shall also contain substantially the following statement: "The insur-ance covered by this certificate will not be canceled or materially altered, except after thirty (30) calendar days written notice has been received by the Contracting Officer."

(e) The insurance obtained by the Contractor must (1) be effective for the term of the contract, (2) must name the United States of America by and through the United States Section of the International Boundary and Water Commission, United States and Mexico (USIBWC), as an additional insured, and (3) cite the contract number.

H.04 Brand Name or Equal

(As used in this clause, the term “brand name” includes identification of products by manufacturer, make, and/or model.)

If items called for by this Request for Proposal (RFP) have been identified in the specifications by a “Brand Name or Equal” de-scription, such identification is intended to be descriptive, but not restrictive, and is to indicate the quality and characteristics of products that will be satisfactory (Reference Section I, FAR Clause 52.236-05 entitled Material and Workmanship). The determina-tion as to equality of a product shall be the responsibility of the Government and will be based on information furnished during the submittal process (Reference Technical Specifications, Division 01-General Requirements, Section 01.33.00-Submittals).

H.05 Technical Data Submittal Requirements

(a) Technical data required to be provided to the government are described in the paragraph entitled “Submittal Requirements” in the Technical Specifications, Division 01-General Requirements, Section 01.33.00-Submittals.

(b) If the Contractor fails to provide required technical data within the time(s) specified in this contract, or any extension, such fail-ures shall be considered to demonstrate unsatisfactory progress and:

(1) There shall be retained from the progress or other payments under this contract such amount(s) as the Contracting Officer considers adequate protection to the Government therefore.

(2) The Contractor and its sureties shall be liable to and assessed by the Government for all damages caused by such failure.

(3) The Contractor’s right to proceed with the work that has been delayed may be terminated for default.

(c) In the event the Contractor provides submittals prior to Notice to Proceed, the Government may review the submittals prior to the Notice to Proceed. The Contractor shall not seek compensation for efforts spent on the preparation of submittal documents submitted prior to the Notice to Proceed.

(d) The rights and remedies of the Government in this clause are in addition to any other rights and remedies provided by law or un-der this contract.

(e) The Government may expedite the review of submittals. Expedite is defined as any decrease in review time under the allotted time specified for the review of the submittal. However, the Government reserves the right to require up to the amount of time specified in Section 01.33.00 for review of submittals or re-submittals.

H.06 Accident Prevention and Pre-Planning

With reference to the requirements of Contract Clause 52.236-13 (Alternate I) for an overall safety program, the Contractor shall:

(a) Submit a detailed plan for performing each major phase of work.

(b) Require Subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work.

(c) Be prepared to discuss the plans in conferences convened by the CO or COR prior to starting work on each major phase of work.

Plans shall include all pertinent information, such as methods of providing safety measures for personnel performing required work.

The plan for accomplishing work shall be submitted prior to commencing operations.

H.07 Construction Program

(a) The Contractor shall submit a schedule of construction in accordance with the requirements set forth in the Technical Specifica-tions, Division 01-General Requirements, Section 01.32.00-Construction Progress Documentation. The Contractor shall account for in the assigned workday calendar, seasonal weather conditions, and other constraints considered in the planning and scheduling of all work to ensure the completion within the allotted contract time. The schedule shall be of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the CO may withhold approval of progress payments until the Contractor submits the required schedule.

Until such time as the submitted schedule is approved as the official schedule of the project, the CO may withhold approval of pro-gress payments.

(b) If, in the opinion of the CO, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to im-prove its progress, including those that may be required by the CO, without additional cost to the Government. In this circumstance, the CO may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construc-tion plant, and to submit for approval any supplementary schedule or schedules in chart form as the CO deems necessary to demon-strate how the approved rate of progress will be regained.

(c) Failure of the Contractor to comply with the requirements of the CO under this clause shall be grounds for a determination by the CO that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the con-tract. Upon making this determination, the CO may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

H.08 Construction Safety Standards

(a) Offerors shall obtain and review the current Construction Industry "OSHA Safety and Health Standards (29 CFR 1926)" and the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, dated November 30, 2014 (see Specifications, Division 01- General Requirements, Specification 01.35.00, Safety), prior to submitting offers and preparing required safety program.

Offerors shall utilize these standards in preparing required safety programs.

(b) The Contractor shall comply with all pertinent provisions of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, dated November 30, 2014. This manual is available from: ht-tp://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

(c) In the event there is a conflict between the requirements contained in OSHA Safety and Health Standards (29 CFR 1926), U.S.

Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1), specifications paragraphs, Contractor's approved safety program, or referenced safety and health standards, the more stringent requirement will prevail.

H.09 Equipment Ownership and Operating Expense Schedule

(a) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a Contractor or subcontractor at any tier shall be based on actual cost data when the Government can determine both ownership and operating costs for each piece of equipment or equipment groups of similar serial and series from the Contractor's accounting records.

When both ownership and operating costs cannot be determined from the Contractor's accounting records, equipment costs shall be based upon the applicable provisions of EP 1110 1 8, "Construction Equipment Ownership and Operating Expense Schedule," Region VI (available online at http://140.194.76.129/publications/eng-pamphlets/ep1110-1-8(vol6)/toc.htm). Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the Contracting Officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retrospective pricing, the Schedule in effect at the time for the work was performed shall apply.

(b) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(11) and FAR 31.205 36, substantiated by certi-fied copies of paid invoices. Rates for equipment rented from an organization under common control, lease purchase or sale leaseback arrangements will be determined using the schedule except that rental costs leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated leases are allowable. Costs for major repairs and overhaul are unallowable.

H.10 Cultural Resources

In accordance with the National Historic Preservation Act of 1966 (16 U.S.C. 470), the following procedures are implemented to en-sure historic preservation and fair compensation to the Contractor for delays attendant to cultural resources investigations.

In the event potential historical, architectural, archaeological, or cultural resources (herein after cultural resources) are discovered dur-ing subsurface excavations at the site of construction, the following procedures shall be instituted:

(1) The Contracting Officer shall issue a “Stop Work Order” directing the Contractor to cease all construction operations at the loca-tion of such potential cultural resources find.

(2) Such “Stop Work Order” shall be effective until such time as a qualified archaeologist can be called to assess the value of these potential cultural resources and make recommendations to the State Historical Preservation Officer. Any “Stop Work Order” shall contain the following:

(a) A clear description of the work to be suspended;

(b) Any instructions regarding issuance of further orders by the Contractor for material services;

(c) Guidance as to action to be taken on subcontracts;

(d) Any suggestions to the Contractor as to minimization of his costs;

(e) Estimated duration of the temporary suspension.

If the archaeologist determines that the potential find is a bonafide cultural resource, at the direction of the State Historical Preserva-tion Officer, the Contracting Officer shall extend the duration of the “Stop Work Order” in writing, and the Contractor shall suspend work at the location of the find.

Equitable adjustment of the construction contract shall be made in the following manner:

(1) Time Extension. If the work temporarily suspended is on the “critical path,” the total number of days for which the suspension is in effect shall be added to the number of allowable contract days.

If a portion of work at the time of such suspension is not on the “critical path,” but subsequently becomes work on the critical path, the allowable contract time will be computed from the date such work is classified as on the critical path.

(2) Additional Compensation. If, as a result of a suspension of the work, the Contractor sustains a loss which could not have been avoided by his judicious handling of forces, equipment, and (plant) or redirection of forces or equipment to perform other work on the contract, there shall be paid to the Contractor an amount as determined by the Contracting Officer to be fair and reasonable compensa-tion for the Contractor’s actual loss in accordance with the following:

(a) Idle Time of Equipment. Compensation for equipment idle time will be determined on a force account (time and materi-als) basis, and shall include the cost of extra moving of equipment and rental loss.

(b) Idle Time of Labor. Compensation for idle time of workers will be determined by the Contracting Officer as “Labor” less any actual productivity factor of this portion of the work force.

(c) Increased Costs of Labor and Materials. Increased costs of labor and materials will be compensated only to the extent such increase was in fact caused by the suspension as determined by the Contracting Officer.

Compensation for actual loss due to idle time of either equipment or labor shall not include markup for profit.

The hours for which compensation will be paid will be the actual normal working time during which such delay condition exists, but will in no case exceed eight hours in any one day.

The days for which compensation will be paid shall be full or partial calendar days, excluding Saturdays, Sundays, Federal and State holidays, during the existence of such delay.

The New Mexico Historical Preservation Division is located at 407 Galisteo Street, STE 236, Santa Fe, NM 87501. The New Mex-ico Historical Preservation Division may be reached by email at nm.shpo@state.nm.us, by telephone at 505-827-6320. The mailing and street address are the same.

H.11 Contract Work Schedule

Normal working hours for the Contractor shall not be earlier than 6:00 am nor later than 5:30 pm, Monday through Friday, excluding Federal Holidays. The Contractor shall not exceed 40 hours per week for normal working hours. If the Contractor wishes to work during periods other than that above or in excess of 40 hours per week, additional Government inspection forces will be required. The Contractor shall notify the Contracting Officer's Representative (COR) three (3) working days in advance of their desire to work dur-ing other periods to allow assignment of additional inspection forces when the Contracting Officer determines that the additional in-spection force is reasonable available. If such force is reasonable available, the Contracting Officer may authorized the Contractor to perform work during period other than normal duty hours/days or in excess of 40 hours per week; however, if inspectors are required to perform in excess of their normal duty hours/days, the actual cost of the overtime inspection at overtime rates will be charged to the Contractor and will be deducted from the final payment of the contract amount.

Consistent with Section 6103(a) of Title 5 of the United States Code the following are legal public holidays:

New Year’s Day, January 1.

Birthday of Martin Luther King, Jr., the third Monday in January.

Washington’s Birthday, the third Monday in February.

Memorial Day, the last Monday in May.

Independence Day, July 4.

Labor Day, the first Monday in September.

Columbus Day, the second Monday in October.

Veterans Day, November 11.

Thanksgiving Day, the fourth Thursday in November.

Christmas Day, December 25.

2015 Holiday Schedule

For Holidays that fall on a Saturday, for Federal employees, the preceding Friday will be treated as a holiday for pay and leave pur-poses (See 5 U.S.C. 6103(b)).

For Holidays that fall on a Sunday, for Federal employees, the following Monday will be treated as a holiday for pay and leave pur-poses (See section 3(a) of Executive order 11582, February 11, 1971).

H.12 Utility and Telephone Services

The U.S. Section, International Boundary and Water Commission will not provide utilities (water, internet, gas, and electricity) and telephone services to the Contractor. The Contractor shall, at his own expense and in a workmanlike manner satisfactory to the Con-tracting Officer, install and maintain all necessary temporary connections and distribution lines, and he shall remove the same prior to final acceptance of the work by the Government.

H.13 Administration of Default (Fixed-Price Construction)

(a) Notwithstanding paragraph (b)(1)(xi) of Contract Clause 52.249-10, Default (Fixed-Price Construction), the Contractor shall not be excused for delays, and shall be liable for any excess costs for failure to perform, if the subcontracted or purchased supplies or ser-vices were obtainable from other sources in sufficient time for the Contractor to meet the required delivery schedule or other perform-ance requirements.

(b) Unusually severe weather, as used in paragraph (b)(1) of Contract Clause 52.249-10, Default (Fixed-Price Construction), means adverse weather which at the time of the year in which it occurred, was unusual for the place in which it occurred. No matter how severe or destructive, if the weather is not unusual for the particular time and place, or if a Contractor could have reasonably foreseen it, the Contractor is not entitled to an extension in contract time. Climatological records for the rehabilitation of the East Vado Levee in Dona Ana County, New Mexico, are available from the National Weather Service (www.weather.gov). The Government shall not be responsible for any interpretation or a conclusion drawn from the data or information by the Contractor.

(c) Upon acknowledgment of the Notice to Proceed and continuing throughout the contract on a monthly basis, adverse weather will be recorded on a calendar day basis (including weekends and holidays). The COR will examine these records each month and determ-ine whether the Contractor is entitled to a time extension. Adverse weather must prevent work for 50% or more of the Contractor's work during any workday and delay work critical to the timely completion of the project. The COR will convert any workday delays meeting the above requirements to calendar days and the CO will issue a modification in accordance with Contract Clause 52.249-10, entitled Default (Fixed-Price Construction).

H.14 Time Extensions for Unusually Severe Weather

(a) This provision specifies the procedures for the determination of time extensions for unusually severe weather in accordance with the Contract Clause, 52.249-10, Default (Fixed-Price Construction). The listing below defines the monthly anticipated adverse weath-er for the contract period and is based on NOAA or similar data for the geographical location of the project:

Monthly Anticipated Adverse Weather Calendar Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual

1 1 1 1 1 1 4 4 3 2 1 2 22

(b) Determination:

(1) The above schedule of anticipated adverse weather will constitute the base line for monthly (or portion thereof) weather time evaluations. Upon acknowledgment of the notice to proceed and continuing throughout the contract on a monthly basis, actual ad-verse weather days will be recorded on a calendar day basis (including weekends and holidays) and compared to the monthly anticip-ated weather in subparagraph (a) above. For purposes of subparagraph (b), the term actual adverse weather days shall include days impacted by actual adverse weather days.

(2) The number of actual adverse weather days shall be calculated chronologically from the first to the last day in each month.

Once the number of actual adverse weather days anticipated in subparagraph (a) above have been incurred, the Contracting Officer will examine any subsequently occurring adverse weather days to determine whether a Contractor is entitled to a time extension.

These subsequently occurring adverse weather days must prevent work for 50 percent or more of the Contractor's work day and delay work critical to the timely completion of the project. These subsequently occurring adverse weather days must fall on a scheduled work day to count towards the entitled time extension. The Contracting Officer will convert any delays to meeting the above require-ments to calendar days and issue a modification in accordance with the Contract Clause, 52.249-10, Default (Fixed-Price Construc-tion).

(c) The Contractor's schedule must reflect the above anticipated adverse weather delays on all weather dependent activities

H.15 Change Orders and Contract Modifications: Limitations on Markups

(a) In the event the Government elects to direct a change order or enter into a contract modification that increases the scope of work during the course of performance of this contract, allowances for overhead and fee of higher tier subcontractors and the prime contractor shall be subject to the limitations below.

(b) Changes and Modifications up to $100,000.00 (Exclusive of Mark ups)

(1) No…