(Recovery) GSA/NCR Design-Build Construction Project Funded by the Recovery Act (U. S. Tax Court, Markey, Bostetter)

Award Notice Posted

Solicitation number
GS-11P-10-YA-C-0047
Agency
Awarded
to DS East Joint Venture
Set-aside
Competitive 8(a)

Opportunity facts

Contract number
GS-11P-10-YA-C-0047 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Markey Building: 717 Madison Place, NW Washington, DC U.S. Tax Court Building: 400 Second Street, NW Wasington, DC Bostetter Building: 200 South Washington St. Alexandria, VA 22314 Washington, District of Columbia, United States

Notice details come from SAM.gov. Updated .

Notice text

 

RECOVERY ACT

This is a Request for Proposal (RFP) for Design-Build projects with the U.S. General Services Administration's (GSA) National Capital region.


This is a competitive 8a acquisition under FAR Part 15, Firm Fixed Price acquisition for Design/Build (DB) projects. The North American Industry Classification system (NAICS) Codes are: 236220 (Construction), 541310 (Architect) and/or 541330 (Engineering). 


This competitive 8a requirement is for Design/Build (D-B) projects with the purpose of re-commissioning federal facilities located in the Washington D.C. area, State of Virginia, and the State of Maryland. The scopes of work will include, but not be limited to: 1) upgrading Building Systems via installation of high-performance HVAC components in buildings which will both decrease energy consumption and operations cost; 2) building tune-ups which include re-commissioning to reduce energy demand, reduce operation and maintenance costs, improve building system control, and occupant comfort (This may include hardware and software upgrades to the building control systems or replacing the existing building automation software systems-These building tune-ups include many small-cost, high-impact changes to motors, sensors, and equipment-Data input devices such as advanced utility meters and meteorological instruments may be included); 3) integrated photovoltaic projects which may include roof membranes that will be installed in locations suitable for solar generation (Integrated photovoltaic membranes consist of the installation of highly insulated roofing materials that contain an integrated photovoltaic roofing membrane); 4) lighting replacement projects which include high-performance lighting that will both decrease energy consumption and cost, and improve working conditions and productivity for building occupants to both improve the quality of light and working conditions and result in significant reduction in the lighting energy consumption; and 5) roof replacement  projects which may include highly insulated roofs; highly insulated planted green roofs, and highly insulated cool roofs with highly reflective membranes.  In addition to the work described above, it is anticipated that the contracts may include specified repair, asbestos, PCB, and lead-base paint abatement, and design and construction services relating to, but not limited to, civil, mechanical, plumbing, structural, electrical, heating, ventilation and air conditioning (HVAC), instrumentation, anti-terrorism and force protection, in addition to all other general design and construction activities.



NOTE: These projects require firms to provide for Architect, Engineering, and Construction Services. If your company lacks one of these required services, your firm must create a partnership with a business that can complement/fulfill ALL the needed requirements by the submission of solicitation due date, which is scheduled for March 29, 2010.

Files

File Type Posted
Markey_LightingPlans_Revised031710 —
List_of_Changes_-_Amendment-4_(GS-11P-10-YA-C-0047).doc DOC document
SF1442 —
Agreement_GS11P10YAC0047 —
List of Changes - Amendment-3 —
sf24 —
Solicitation_GS11P10YAC0047 —
Goals for Minorities —
sf25a —
Questions - Group 1 - Final.xls XLS spreadsheet
sf25 —
Group1_Markey_Lighting_Add2_030410.pdf PDF
Questions - Global.xls XLS spreadsheet
List of Changes —
US Tax Court Amendment No 2_3-16-10.pdf PDF
Bostetter Amendment.pdf PDF
Sign In Sheet 3.pdf PDF
Sign In Sheet 2.pdf PDF
List of Changes —
Sign In Sheet 4.pdf PDF
Sign In Sheet 1.pdf PDF
3-8-10 Pre-Proposal Meeting Presentation FINAL.ppt PPT presentation
WD-VA.doc DOC document
WD-DC.doc DOC document
ARRA.8(a) DB Competitive Agreement GS11P10YAC0047.doc DOC document
Group 1 - Tax Court_Markey_Bostetter SOW.pdf PDF
REPS-CERTS GS11P10YA-C-0047.doc DOC document
ARRA.8(a) DB Competitive Solicitation GS11P10YAC0047.doc DOC document
FOB8 - Document Transmittal Form.doc DOC document
Show all 29

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors