Questions - Group 1 - Final.xls

XLS spreadsheet 19 KB Posted

Attached to
(Recovery) GSA/NCR Design-Build Construction Project Funded by the Recovery Act (U. S. Tax Court, Markey, Bostetter)
Solicitation number
GS-11P-10-YA-C-0047
Issued by

About this file

Questions - Group 1 - Final

View the file

Other files

File Type Posted
Markey_LightingPlans_Revised031710 —
List_of_Changes_-_Amendment-4_(GS-11P-10-YA-C-0047).doc DOC document
sf24 —
SF1442 —
Agreement_GS11P10YAC0047 —
List of Changes - Amendment-3 —
Solicitation_GS11P10YAC0047 —
US Tax Court Amendment No 2_3-16-10.pdf PDF
Goals for Minorities —
sf25a —
Group1_Markey_Lighting_Add2_030410.pdf PDF
Questions - Global.xls XLS spreadsheet
sf25 —
List of Changes —
Bostetter Amendment.pdf PDF
Sign In Sheet 2.pdf PDF
List of Changes —
Sign In Sheet 3.pdf PDF
Sign In Sheet 1.pdf PDF
Sign In Sheet 4.pdf PDF
3-8-10 Pre-Proposal Meeting Presentation FINAL.ppt PPT presentation
ARRA.8(a) DB Competitive Agreement GS11P10YAC0047.doc DOC document
WD-VA.doc DOC document
REPS-CERTS GS11P10YA-C-0047.doc DOC document
WD-DC.doc DOC document
Group 1 - Tax Court_Markey_Bostetter SOW.pdf PDF
FOB8 - Document Transmittal Form.doc DOC document
ARRA.8(a) DB Competitive Solicitation GS11P10YAC0047.doc DOC document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Group 1

Group/Solicitation No.BuildingQuestionAnswer
Group 1 -0047Tax Court, Markey, BostetterDo the Document Security forms for SBU information need to be submitted?Yes - The Security Forms should be completed, signed, and submitted in person with verification documents to the Contracting Officer in order to pick-up the available CD with Bid Set documents for the US Tax Court and National Courts.
Group 1 -0047Tax Court, Markey, BostetterHow many copies of the proposal (Technical and Price) are required to be submitted?Five (5) copies of the Technical Proposal and Two (2) copies of the Price Proposal are to be provided.
Group 1 -0047Tax Court, Markey, BostetterUnder section I.B. of the Solicitation, List of Solicitation Documents, Standard Form (SF) 1442, was listed but not provided. Please provide SF1442s.The GSA - SF1442 form has been issued by Amendment.
Group 1 -0047Tax Court, Markey, BostetterIs there a specific form required for the Bid Guarantee? Standard Form 24 was not providedBid Guarantee form SF24 has been issued by amendment.
Group 1 -0047Tax Court, Markey, BostetterIn reference to Section I.B of the Solicitation, is a signature required on The Agreement?Yes
Group 1 -0047Tax Court, Markey, BostetterIn reference to Section II.A.5 of the Solicitation," Other Documents as required", are there other documents required not available on the website?Additional drawings/documents may be available for GSA facilities and may be viewed at the Technical Resource Center (Library) in room 2021 of GSA's Regional Office Building at 301 7th Street, SW, Washington, DC. Photocopies or prints of SBU documents ma
Group 1 -0047Tax Court, Markey, BostetterA SF1442 is referenced in paragraph I.B. of The Solicitation for GS-11P-YAD-0043, but one was not provided. Please provide a SF1442 along with a bid schedule.The GSA - SF1442 form has been issued by Amendment.
Group 1 -0047Tax Court, Markey, BostetterIn paragraph I.D.1 of the same solicitation it is indicating that a Pre-Proposal was scheduled for yesterday, March 8, 2010. However, notification of this project was not given until yesterday, which was the date of the Pre-Proposal Conference. Has theNo
Group 1 -0047Tax Court, Markey, BostetterIs there a bid form being provided?Yes
Group 1 -0047Tax Court, Markey, BostetterIs the GSA providing a bid schedule?See the solicitation
Group 1 -0047Tax Court, Markey, BostetterAre there Liquidated Damages? If so, what are they?There are no liquidated damages for Groups 1.
Group 1 -0047Tax Court, Markey, BostetterAre there completed CAD drawings of existing conditions available?CAD Files of floor plans will be provided to the successful offeror.
Group 1 -0047Tax Court, Markey, BostetterIf there are no CAD drawings, is a full building survey required?CAD Files of Floor Plans will be provided to the successful offeror.
Group 1 -0047Tax Court, Markey, BostetterIs there a comprehensive hazardous material report available for review prior to bid?No
Group 1 -0047Tax Court, Markey, BostetterPlease clarify all LEED requirements.GSA attempts to achieves LEED Certification in all projects for all builds. The design/builder will be required to fill out a High Performance Green Building Criteria Checklist during design development prior to construction.
Group 1 -0047Tax Court, Markey, BostetterPlease clarify if the contractor will be responsible for temporary utility charges.There will be no utility charges for work conducted within the facility using accepted tools and methods.
Group 1 -0047Tax Court, Markey, BostetterWill GSA be hiring a 3rd party commissioning agent?GSA intends to employ an independent commissioning agent.
Group 1 -0047Tax Court, Markey, BostetterPlease clarify Escort requirements and confirm if the government will be providing the Escorts if required at no cost to Contractor.Escorts are required. Escorts will be provided by the Government at no cost to the contractor.
Group 1 -0047Tax Court, Markey, BostetterGiven that the majority of the SBU release forms were posted 3/5/10 (3 business days), could you please consider extended the RFI cutoff date?The ARRA Program Team has been charged to expedite the delivery of these projects. The Proposal Deadlines will remain as stated in the Solicitations.
Group 1 -0047Tax Court, Markey, BostetterA SF1442 is referenced in paragraph I.B. of The Solicitation for GS-11P-YAD-0043, but one was not provided. Please provide a SF1442 along with a bid schedule.The GSA - SF1442 form has been issued by Amendment.
Group 1 -0047Tax Court, Markey, BostetterHow do I reference the Scope of Work in each building and their contacts.See FedBizOpps website; www.FBO.com
Group 1 -0047MarkeyPer the Solicitation Synopsis (link below) it appears that this solicitation will require that the prime bidder to be a 8(a) firm. Additionally, per page 3 of the 15 page Solicitation Summary document referenced below, Para I.E. mentions the estimated prThe contracting vehicle cannot be changed. It will remain 8(a). Group 1: $10M - $20M.

&LAmerican Recovery and Reinvestment Act High-Performance Green Building Projects Questions - Specific to Group 1 &R&P of &N