RECOVERY-CNF Wastewater Improvements
Awarded Award Notice Posted
- Solicitation number
- AG-9702-S-10-0383
- Agency
- Operations Center Southwest Economic Recovery Operations, Department of Agriculture
- Awarded
- to Armstrong Backhoe
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG-9702-C-10-0187 Federal contract award
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- PSC
- Not on record
- Place of performance
- Cleveland NF 10845 Rancho Bernado Rd Ste 200 San Diego, California 92127, United States
Notice details come from SAM.gov. Updated .
Notice text
7 versions
Update #7 · Latest ·
Added: Jul 09, 2010 5:56 pm
RECOVERY (ARRA) THIS IS NOTIFICATION THAT THE US FOREST SERVICE HAS AWARDED THIS CONTRACT TO THE ABOVE MENTIONED CONTRACTOR.
This acquisition was advertised April 14, 2010 as a total Small Business set-aside, and any resultant firm-fixed price contract will be awarded pursuant to FAR 13, Simplified Acquisition Procedures. In accordance with FAR Part 36.204(b), the estimated magnitude of construction was between $25,000 and $100,000. The estimated contract period of performance is 64 calendar days after the Notice to Proceed. The applicable North American Industry Classification System (NAICS) Code is 237110. The Small Business Administration size standard is $33.5 million. Contractors were required to be actively registered with the Central Contractor Registration (CCR) system and the Online Representations and Certifications Application (ORCA).
The contractor will provide all management and project administration services, quality control, logistical support, vehicles, labor, equipment and materials to complete the project on time and on schedule. The scope of work includes installation of two separate septic systems including all related appurtenances at the El Cariso Hot Shot Camp. Work includes intercepting existing lines at building and manways, and installing new sewer line to new septic tank and leach field and abandonment of some existing lines. At Silverado Fire Station, work includes replacement of existing septic tank and connection to existing leach field, pumping the existing septic tank clean of sewage, demolishing existing septic tank, installation of new traffic rated septic tank, sewer line, distribution box and all related appurtenances.
The location is in Cleveland NF - El Cariso Hot Shot Camp and Silverado Fire Station in San Diego, CA.
TAS::12 1102::TAS Capitol Improvement and Maintenance
Update #6 ·
Added: Jun 01, 2010 5:09 pm
RECOVERY (ARRA)- The purpose of this Amendment 4 is to 1) Revise and Replace the Schedule of Items - Attachment 1.
BID SUBMITTAL DATE REMAINS UNCHANGED AS JUNE 4, 2010, 2:00 PM Pacific Time
PLEASE FOLLOW SECTION L BID SUBMITTAL INSTRUCTIONS IN THE REQUEST FOR QUOTE PACKAGE. THE ONLY INFORMATION CHANGE IS THE BID SUBMITTAL DATE. BE SURE AND SUBMIT AMENDMENTS 1-4 SIGNED AND DATED WITH YOUR BID PACKAGE DOCUMENTS.
Period of Performance: 06/15/2010 to 08/20/2010
Update #5 ·
Added: May 27, 2010 7:32 pm
RECOVERY (ARRA) - The work consists of the Installation of four separate septic systems at the El Cariso Hot Shot Camp and the Replacement of the existing septic tank at the Silverado Fire Station.
This project is funded by the American Recovey & Reinvestment Act (ARRA).
Amendment 3 is included with this posting and Attachments 1 - 3.
The purpose of this Amendment 3 is to 1) Revise and Replace the Schedule of Items (Att 1), 2) add Specification Section 01505 - Mobilization (ATT 2); Specification Section 02050 - Demolition (Att 3); Specification Section 03100 - Concrete Formwork (Att 4); and Specification Section 03200 - Concrete Reinforcement (Att 5) of this Amendment, add to the Request for Quote Documentation; and 3) Answers to Vendor's Questions
that follow:
Q)Can you tell me how the material testing and
special inspections will be handled for the
Recovery Cleveland National Forest Wastewater
Improvements Project? Via the owner or the
Contractor?
A)All material testing and special inspections
and quality control will be the responsibility of
the contractor.
Q)Are your requiring cleanouts every 50 feet?
A)Cleanouts will be required to be installed AS
SHOWN ON CONTRACT DRAWINGS and where the
Uniform Plumbing Code 2006 with California amendments,
requires they be installed for this type of sewer
installation.
BID SUBMITTAL DATE IS CHANGED FROM: June 2, 2010,
2:00 PM Pacific Time TO: June 4, 2010, 2:00 PM Pacific Time
PLEASE FOLLOW SECTION L BID SUBMITTAL
INSTRUCTIONS IN THE REQUEST FOR QUOTE PACKAGE.
THE ONLY INFORMATION CHANGE IS THE BID SUBMITTAL
DATE. BE SURE AND SUBMIT AMENDMENTS 1-3 SIGNED
AND DATED WITH YOUR BID PACKAGE DOCUMENTS.
Period of Performance: 06/15/2010 to 08/20/2010
Update #4 ·
Added: May 24, 2010 6:20 pm
Attached to this Posting is Amendment 2 and it's nine (9) attachments. Submit SF-18 document signed and dated with your BID Submittal Package.
The BID Submittal date remains as June 2, 2010, 2:00PM Pacific Time.
Please note changes and attachments.
Attachments 2 = 9 are in a better format for enlargements of this data.
Update #3 ·
Added: May 17, 2010 5:08 pm
Attached to this Posting is Amendment 1 and it's two (2) attachments. Submit SF-18 document signed and dated with your BID Submittal Package.
BID Submission date remains unchanged.
Update #2 ·
Added: May 11, 2010 7:34 pm
RECOVERY (ARRA) THIS IS NOTIFICATION THAT THE REQUEST FOR QUOTE AND ATTACHEMENT 1 - 6 ARE ATTACHED TO THIS ADVERTISEMENT. PLEASE FOLLOW SECTION "L" INSTRUCTION FOR BID SUBMISSIONS.
This acquisition is being advertised as a total Small Business set-aside, and any resultant firm-fixed price contract will be awarded pursuant to FAR 13, Simplified Acquisition Procedures. In accordance with FAR Part 36.204(b), the estimated magnitude of construction is between $25,000 and $100,000. The estimated contract period of performance is 64 calendar days after the Notice to Proceed. The applicable North American Industry Classification System (NAICS) Code is 237110. The Small Business Administration size standard is $33.5 million. Contractors are required to be actively registered with the Central Contractor Registration (CCR) system and the Online Representations and Certifications Application (ORCA). To receive the entire solicitation package and any applicable amendments, prospective offerors must download them from this FedBizOpps website. The contractor shall provide all management and project administration services, quality control, logistical support, vehicles, labor, equipment and materials to complete the project on time and on schedule. The scope of work includes installation of two separate septic systems including all related appurtenances at the El Cariso Hot Shot Camp. Work includes intercepting existing lines at building and manways, and installing new sewer line to new septic tank and leach field and abandonment of some existing lines. At Silverado Fire Station, work includes replacement of existing septic tank and connection to existing leach field, pumping the existing septic tank clean of sewage, demolishing existing septic tank, installation of new traffic rated septic tank, sewer line, distribution box and all related appurtenances.
Update #1 ·
Added: Apr 14, 2010 7:46 pm RECOVERY: The USDA Forest Service, Cleveland National Forest (hereafter "the Government," "the Forest Service," or "the Cleveland National Forest (NF)"), announces an opportunity for the Wastewater Improvements construction project using funds from the 2009 American Recovery and Reinvestment Act (ARRA). This acquisition is being advertised as a total Small Business set-aside, and any resultant firm-fixed price contract will be awarded pursuant to FAR 13, Simplified Acquisition Procedures. In accordance with FAR Part 36.204(b), the estimated magnitude of construction is between $25,000 and $100,000. The estimated contract period of performance is 64 calendar days after the Notice to Proceed. The applicable North American Industry Classification System (NAICS) Code is 237110. The Small Business Administration size standard is $33.5 million. Contractors are required to be actively registered with the Central Contractor Registration (CCR) system and the Online Representations and Certifications Application (ORCA). THIS IS NOT A REQUEST FOR QUOTATION (RFQ) AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this synopsis, the pending solicitation or any follow up information requests. The RFQ will be posted to the FedBizOpps website on or about April 30, 2010. No hard copies of the solicitation, supporting documents and applicable amendments, if any will be provided. To receive the entire solicitation package and any applicable amendments, prospective offerors must download them from the FedBizOpps website. The contractor shall provide all management and project administration services, quality control, logistical support, vehicles, labor, equipment and materials to complete the project on time and on schedule. The scope of work includes installation of two separate septic systems including all related appurtenances at the El Cariso Hot Shot Camp. Work includes intercepting existing lines at building and manways, and installing new sewer line to new septic tank and leach field and abandonment of some existing lines. At Silverado Fire Station, work includes replacement of existing septic tank and connection to existing leach field, pumping the existing septic tank clean of sewage, demolishing existing septic tank, installation of new traffic rated septic tank, sewer line, distribution box and all related appurtenances.