Att 2 01505Mobilization.doc

DOC document 26 KB Posted

Attached to
RECOVERY-CNF Wastewater Improvements Federal contract opportunity
Solicitation number
AG-9702-S-10-0383
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Southwest

About this file

Attachment 2 Specification - Mobilization

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY-CNF Wastewater Improvements, newest first.
File Type Posted
A-4 SF-30.pdf PDF
ScheduleOfItems060110REV.doc DOC document
Att 1 REV SCHED amend 3.docx DOCX document
Att 5 03200ConcreteReinforcement.doc DOC document
Att 4 03100ConcreteFormwork.doc DOC document
Att 3 02050Demolition.doc DOC document
A-3 SF 30 S-10-0383.pdf PDF
Att 2 - 1TitleSheet USFS-Dsize(24X36) —
Att 3 - LegendAndNotesREV Site Plan —
Att 4 - ElCarisoHotShotSitePlanREV SitePlan —
A-2 SF-30.doc DOC document
Att 7 - SilveradoFireStationSitePlanv2004 Layout1 —
Att 8 - SilveradoFireStationSeptic Leachv2004 Layout1 —
Att 5 - ElCarisoHotShotSeptic LeachWestREV West End —
Att 6 - ElCarisoHotShotSeptic LeachEastREV East End —
Att 9 - Plumbing DetailsA B Layout1 —
A-1.pdf PDF
ATT 2 - REVISED Section I M.doc DOC document
ATT 1 - REVISED SF-18.PDF PDF
Att 2_SilveradoProjectLocationMap.pdf PDF
Att 6 Riverside County Wage Determination_CA36.pdf PDF
Att 1_ElCarisoHotShotProjectLocationMap.pdf PDF
Att 4 San Diego County Wage Determination_CA1.pdf PDF
Att 3 Vicinity Map_Detail Drawings.PDF PDF
Att 5 Orange County Wage Determination_CA35.pdf PDF
S-10-0383_RFQ.doc DOC document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WASTEWATER IMPROVEMENTS CNF

SECTION 01505 - MOBILIZATION

PART 1 ‑ GENERAL

1.1

SCOPE:

A.

This work consists of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.

1.2

MEASUREMENT AND PAYMENT

A.

The accepted quantities will be paid for at the contract unit price for item 01505 Mobilization.

B.

Progress payments will be made as follows:

1. The Government will pay to the Contractor in the first progress payment the total premium paid by the Contractor to obtain bonds. This payment shall not be in addition to the contract price and will be included in Item 01505, Mobilization.

2. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.

3. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.

4. Upon completion of all work on the project, any unpaid amount for item 01505, Mobilization, will be paid.

C.

The total of all payments will not exceed the original contract amount for item 01505, Mobilization.

PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used)

END OF SECTION 01505

MOBILIZATION